Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

AAECON GENERAL CONTRACTING LLC Louisville KY 40299 USA

UEI: SLED_ED101B74CB290497

AAECON GENERAL CONTRACTING LLC Louisville KY 40299 USA is a federal contractor, registered under UEI SLED_ED101B74CB290497. It has been awarded $8,796,555 across 2 federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction and Other Heavy and Civil Engineering Construction. Top awarding agencies include 247-NETWORK Contract Office 7 (36C247) and Fpac Bus Cntr-Acq Division.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_ED101B74CB290497

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
247-NETWORK Contract Office 7 (36C247)$8.6M97.4%
Fpac Bus Cntr-Acq Division$231.1K2.6%
Awards by NAICS
237110 - Water and Sewer Line and Related Structures Construction$8.6M97.4%
237990 - Other Heavy and Civil Engineering Construction$231.1K2.6%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in AAECON GENERAL CONTRACTING LLC Louisville KY 40299 USA's top NAICS codes and agencies

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump to Final Clarifier No. 1. Key structural and technical improvements involve installing a building to enclose the headworks, constructing a dedicated building for a new ferric chloride/alum chemical storage tank, and replacing motor control centers, PLCs, and switchgear to enhance plant reliability and resiliency. Additional work includes repairing concrete at the headworks and performing miscellaneous building improvements to HVAC systems, roofing, and doors. This wage-rated solicitation is open to a wide range of socioeconomic categories, including small, disadvantaged, women-owned, and veteran-owned businesses, with a specific emphasis on recruiting MBE, DBE, and WBE subcontractors and suppliers for electrical, mechanical, masonry, and pump-related services. Bids must be submitted by August 17, 2026, at 4:00 PM to the Cumberland, Maryland office or via the designated online portal. Detailed plans and specifications are available through the company website, and the primary administrative contact for the project is Jared Burkett.
Carl Belt, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida, on behalf of the Central Florida Water Cooperative. The estimated project value is 270 million dollars. The scope of work is extensive, encompassing the construction of raw water production wells with associated well heads and pumps, discharge piping, surge bladder tanks, and site civil works. Additional requirements include the construction of an electrical building, standby generator, wellhead cages, and specialized facilities such as Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. The project also requires primary and secondary water quality analytical laboratory testing and production well disinfection to achieve regulatory certification. Proposals must be submitted via email to Nichole Voitel. The submission process requires the proposed scope of work to be delivered at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Bidding documents, including plans, specifications, and addenda, are available for free download through ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details