3rd Street East Water Line Replacement Project

Active
UT-2026-02International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Saskatchewan Public Sector → Town of LeaderView Agency

NAICS

N/A

Place of Performance

SK, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySaskatchewan Public Sector → Town of Leader
Contacts1 person available
OfficeN/A
Organization / Agency
Saskatchewan Public Sector → Town of Leader
View Agency Profile
Office AddressN/A

Full Description

Show more
Services Required - Excavation and replacement of 136 meters of watermain pipe on 100 block of 3rd Street East. Replacement includes the following: - Approximately 136 meters of 6” water line 5 Residential services as follows: - 4 west side - 1 east side 1 Fire Hydrant, Valve, and Rod Box Replace 2 valves including rod & boxes Residential sewer line will need to be crossed in one place. * All measurements are estimates. The Town expects the final billing to differ from the quoted price if the actual measurements are more or less. SPECIFICATIONS - Complete line locates prior to excavation. - Remove and dispose of asphalt; Town will have the asphalt cut prior to excavation. - Ensure all required safety precautions are in place and utilized. - Excavate and remove current watermain; Dirt is to be piled on the street; extra dirt is to be hauled to a disposal site designated by the Town of Leader (approx. 1km south). - Replace existing pipe with new PVC pipe; pipe and connectors provided by the Town - The Town must visually inspect all pipe and connections prior to backfilling. - Pipe must be laid, packed, and compacted as per the Town of Leader’s Compaction Policy (see Appendix D). - Supply fill dirt and gravel for proper backfilling and compaction; the Town will supply sand. - Compaction shall be completed as per the Town of Leader’s Compaction Policy to ensure no settling or sinking for areas to be paved. - Site to be leveled with necessary slope for proper water drainage.