Battery Energy Storage System Supply and Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the supply, delivery, and full integration of a 1,351 kilowatt-hour battery energy storage system at the UCF facility, encompassing all necessary components such as thermal management, comprehensive safety systems, protective enclosures, and seamless integration with the grid and charging infrastructure. The system is designed to operate reliably within the specific environmental and operational conditions of the designated location, ensuring long-term performance and compliance with technical and safety standards. All elements must be coordinated to function as a unified unit, with attention to scalability, monitoring, and maintenance accessibility. The work is to be performed at a site in Alameda, California, with a zip code of 94501, under a subcontract arrangement administered by the Water Emergency Transportation Authority. The North American Industry Classification System code 335912 indicates the focus on battery manufacturing and related energy storage technologies. Although the solicitation number and point of contact details are not provided, the contract’s posted date of July 27, 2026, signals the timeline for potential bids or execution, and the performance location underscores the regional importance of resilient energy infrastructure in the California area.
General Info
Agency
NAICS
Place of Performance
Alameda, CA, 94501Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
