Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Greycliff Rest Area Rehab project involves comprehensive upgrades to the potable water and wastewater systems at both the eastbound and westbound rest areas along I-90 in Sweetgrass County, Montana, near milepost 381.0. The scope includes reconfiguring the water supply by constructing a new, DEQ-approved public water well at the westbound facility and abandoning the existing eastbound well, while installing a 5,000-gallon buried storage tank, new service piping between buildings, redundant pumps, controls, valves, and appurtenances to ensure reliable service that meets DEQ Circular DEQ-3 requirements for peak demand. The project also replaces the outdated wastewater system with a state-of-the-art Level 2 advanced treatment system featuring new septic tanks, an equalization tank, a dosing tank, effluent pumps, force mains, and a multi-zone pressure-dosed drainfield to ensure regulatory compliance and long-term operational reliability. This initiative is being managed by the Montana Department of Transportation under solicitation number 06826, classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction. The contract is open to public bid with a posted date and response deadline both set for August 27, 2026, and no set-aside provisions apply. The work is critical to addressing capacity limitations, improving water quality, and ensuring systems operate safely and sustainably for public use. All construction activities will occur within Sweetgrass County, with the MDT overseeing compliance, timelines, and performance standards for the full scope of improvements.

General Info

Upgrade potable water and wastewater systems at I-90 rest areas in Sweetgrass County, Montana, to meet DEQ standards.

Agency

Montana Department of TransportationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sweet Grass, MT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMontana Department of Transportation
ContactsNo contacts available
OfficeMT, USA
Organization / Agency
Montana Department of Transportation
View Agency Profile
Office AddressMT, USA
ContactsNo contact information available

Full Description

Show more
The Greycliff Rest Area Rehab project consists of the design and implementation of potable water and wastewater system improvements for the MDT Greycliff Eastbound and Westbound Rest Area facilities on each side of I-90 near RP 381.0. The project will address capacity, reliability, water quality, and regulatory compliance. Work includes reconfiguring the public water system to serve both facilities from a newly constructed and DEQ-approved public water supply well at the Westbound Rest Area; abandoning the existing Eastbound well; installing a new 5,000-gallon buried potable water storage tank; providing new water service piping between buildings; and installing redundant distribution pumps, controls, valves, and appurtenances necessary to meet projected maximum day and peak instantaneous demands in accordance with DEQ Circular DEQ-3. The project also includes replacement of the existing undersized on-site wastewater system with a new advanced Level 2 treatment system, including new septic tanks, an equalization tank, a dosing tank, effluent pumps, force mains, and a multi-zone pressure-dosed drainfield. This project is located in Sweetgrass County.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 is a solicitation issued by Carl Belt, Inc. for a project located in Maryland. The primary objective is to address aging infrastructure to ensure compliance with nitrogen and phosphorous limits and other quantified permit requirements, thereby improving the water quality of receiving streams and increasing plant reliability. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump and a nitrate probe to the BNR basins. Additionally, the project requires the installation of a building to enclose the headworks for NPDES thermal requirements, a dedicated building for a new chemical storage tank, and the replacement of Motor Control Centers, PLCs, and switchgear. General structural repairs to the headworks and miscellaneous improvements to HVAC, roofing, and doors are also included. This project is wage rated and strongly encourages participation from small businesses, including veteran-owned, HUBZone, disadvantaged, and woman-owned concerns. Carl Belt, Inc. is specifically seeking MBE, DBE, and WBE participants for various subcontracting roles such as electrical, mechanical, masonry, and painting, as well as suppliers for wastewater pumps, sluice gates, and concrete. Bids are due by August 17, 2026, at 4:00 PM and should be submitted to the Cumberland, Maryland office or via the designated online portal. Detailed plans and specifications are available through the company website, with Jared Burkett serving as the primary administrative contact.
Carl Belt, Inc.

POSTED

about 11 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida, on behalf of the Central Florida Water Cooperative. The estimated project value is 270 million dollars. The scope of work is extensive, encompassing the construction of raw water production wells with well heads and pumps, discharge piping, surge bladder tanks, and site civil works. Additional requirements include the construction of an electrical building, standby generator, wellhead cages, and specialized facilities such as the Operations and Reverse Osmosis buildings, Pretreatment and Post-Treatment Chemical Buildings, a Post-Treatment Degasification System, and an Odor Control Air Exhaust Dispersion Stack System. The project also requires primary and secondary water quality analytical laboratory testing and production well disinfection for regulatory certification. Proposals must be submitted via email to Nichole Voitel. The proposed scope of work is due at least 24 hours before the bid date, with firm pricing required by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Bidding documents, including plans, specifications, and addenda, are available for free download through ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 11 hours ago

DEADLINE

in 6 days
View Details