Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Data Retrieval Unavailable

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Data Retrieval Unavailable was posted on July 9, 2026, with a response deadline of August 20, 2026, and is categorized as a subcontract under the University of Florida, specifically its Florida division. No solicitation number, NAICS code, set-aside type, or organizational details are provided, and the office address, place of performance, and point of contact information are all missing. Attempts to analyze subcontract or supplier opportunities have failed due to gateway timeout errors, preventing access to detailed contract terms or opportunity breakdowns. The only available identifier is a link to the University of Florida’s bidding platform, which may require direct access to retrieve further information.

General Info

Data Retrieval Unavailable subcontract posted July 9, 2026, with August 20, 2026, deadline under University of Florida.

Agency

University of FloridaView Agency

NAICS

N/A

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of FY27-ITN-001.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replacement of the Rabon Plant Cooling Towers 4 and 5

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of Florida
ContactsNo contacts available
OfficeN/A
Organization / Agency
University of Florida
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Unable to decompose subcontract or supplier opportunities due to gateway timeout errors (504) from the knowledge base. No prime contract details are available for analysis.

More opportunities from University of Florida

Same awarding agency

NAICS: 238220
SLED
Replacement of the Rabon Plant Cooling Towers 4 and 5
Solicitation # FY27-ITN-001
The University of Florida seeks to replace Cooling Towers 4 and 5 at the Lacy C. Rabon Chilled Water Plant, which serve as the primary cooling systems for Chillers 4 and 5. These towers, originally rebuilt in 2013, have reached the end of their serviceable life and must be replaced with new structures that fit within the existing 40ft x 50ft basin footprint while maintaining independent operation of the two cells. The contractor is responsible for demolition, debris removal, and full installation of new components including metal fan blades, fill, drift eliminators, gearboxes, vibration and oil level switches, motor space heaters, pole lights, and a lube oil system with external access points. All work must adhere strictly to UF Design & Construction standards and applicable codes. Electrical work is excluded from the contractor's scope and will be handled separately by UF-selected vendors. The contractor must submit engineered drawings, obtain all permits, implement lockout-tagout procedures, and coordinate with existing infrastructure, including a steel gangway connecting to Cooling Tower 1, which may require structural evaluation if it cannot be reused. A temporary cooling tower must be installed and maintained at the contractor's expense if completion is delayed beyond April 1, 2027, the absolute deadline required to avoid disruption to campus and UF Health operations. The project has a budget of $950,000 inclusive of all contingencies and is subject to a mandatory pre-bid site visit on July 17, 2026. Proposals must include evidence of performance on at least five similar projects within the past five years, proof of bonding capacity with a surety rated “A” or better, and detailed pricing with a list of spare parts as alternates. The contract will be awarded based on overall competitiveness, technical capability, and compliance—not simply lowest price—and the successful vendor must post performance and payment bonds in accordance with Florida Statute 255.05. Work must begin no earlier than November 1, 2026, and be completed within 120 days of Notice to Proceed, with final completion no later than April 1, 2027. The vendor must carry general liability insurance of at least $1 million, automobile liability of $100,000 per person and $500,000 per occurrence, and workers’ compensation as required by Florida law, with the University named as additional insured. All materials and
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 1 month ago

DEADLINE

in 6 days
View Details