Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Electrical and Data Connectivity Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of electrical and data infrastructure to integrate relocatable classrooms with the existing utility systems of the Arcadia Unified School District. Work includes running electrical service lines, installing lighting fixtures and power outlets, connecting HVAC systems to dedicated power sources, and deploying data cabling to support communication and technology needs in the temporary classrooms. All work must comply with applicable electrical and telecommunications standards and ensure seamless integration with the district’s current infrastructure. The project is located in Arcadia, California, with a zip code of 91006, and falls under NAICS code 238210 for electrical contracting. It is structured as a subcontract and was posted on July 16, 2026. The scope is focused solely on physical connectivity and does not include the provision or installation of the relocatable classrooms themselves. Completion requires coordination with existing school systems to maintain operational continuity during and after installation, with all work expected to meet safety, regulatory, and performance benchmarks for educational facilities.

General Info

Install electrical and data infrastructure to integrate relocatable classrooms with Arcadia Unified School District’s existing systems.

Agency

California → Arcadia Unified School District

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Arcadia, CA, 91006

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Arcadia Unified School District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Arcadia Unified School District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of electrical service, lighting, outlets, HVAC power, and data cabling to connect relocatable classrooms to existing school utility systems.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The contract involves the replacement of 125 remaining failing Robicon variable frequency drives (VFDs) with new, modern equipment to ensure reliable operation within the Port of Seattle’s infrastructure. The project requires full installation of the new VFDs including all necessary wiring, testing, and commissioning to deliver a fully functional system. Integration with the Port’s Direct Digital Controller (DDC) system is a critical component, enabling real-time energy usage monitoring, output control readings, and efficiency tracking to optimize performance and support long-term energy management goals. All associated equipment and labor for this upgrade must be provided to ensure seamless operation without disruption to ongoing port activities. This initiative is part of a phased modernization effort managed by the Aviation Facilities & Infrastructure division of the Port of Seattle under NAICS code 238210. The solicitation is posted as a forecast with primary contact information provided for inquiries, including Yanet Maldonado as the main point of contact and Sharon Miick as the project manager. The work is expected to proceed under a design-bid-build approach, with completion targeted to align with the port’s operational and strategic infrastructure upgrades. While specific timelines and budget details are not outlined here, the successful bidder will be responsible for delivering a turnkey solution that meets all technical and performance requirements, ensuring system reliability, energy efficiency, and full compatibility with existing control systems.
Aviation Facilities & Infrastructure

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract encompasses the design, permitting, and construction of a new operational security camera system across the Bagwell and North Cargo Operations areas at the Port of Seattle, aiming to enhance surveillance capabilities for forensic investigation and enforcement of movement rules. The project will replace and expand existing camera infrastructure by installing 50 high-resolution cameras at 43 distinct locations, with a focus on main terminal drive lanes and entrances previously under-monitored. Current setups concentrate on conveyor systems and security doors, but this upgrade will significantly broaden visibility along critical traffic corridors to support real-time monitoring and post-event analysis. In the North Cargo Operations area, the system will introduce flexible, user-controlled Pan Tilt Zoom units to deliver dynamic coverage across broad surface areas, closing gaps in current surveillance. The solution is engineered to adapt to varying operational needs and spatial complexities, ensuring comprehensive monitoring without fixed limitations. The work is managed by the Aviation Project Management Group under the Port of Seattle, with primary contact Angela Peterson and Project Manager Randa Williams overseeing execution. The North American Industry Classification System code 238210 indicates specialty trade contracting for electrical and related installations, aligning with the technical nature of the camera deployment and integration efforts.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details