Fiber Optic Cable Installation & Splicing
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the full installation of fiber optic cabling between the Keeler Building and the new Data Center, encompassing all phases from pathway preparation and conduit installation to cable pulling, termination, and splicing. Work must ensure proper signal integrity through comprehensive testing and includes detailed labeling of all components for future maintenance and identification. The project requires strict adherence to industry standards for fiber optic deployment, with all materials and methods selected to guarantee long-term performance and reliability of the communication link. The solicitation is issued as a subcontract under NAICS code 238210 by the Cherokee Nation, with the place of performance located in Cherokee County. The proposal submission deadline is August 19, 2026, and the opportunity was posted on July 24, 2026. There is no specified set-aside classification or point of contact provided, and the contract is accessible through the Cherokee Nation’s official procurement portal. All work must be completed in accordance with technical specifications and site-specific requirements to ensure seamless integration into existing infrastructure.
General Info
Agency
NAICS
Place of Performance
Cherokee County, OK, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Cherokee Nation
Same awarding agency
