Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Generator Installation and Commissioning Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the design, permitting, and construction of a new camera system across the Bagwell and North Cargo Operations areas of the Port of Seattle to enhance operational security and enforcement capabilities. A total of 50 high-resolution cameras will be installed at 43 distinct locations, significantly expanding coverage beyond the current focus on conveyor systems and security doors to include key drive lanes, entrances, and surface areas within the cargo terminals. The installation will feature Pan Tilt Zoom units for flexible, user-controlled monitoring, enabling real-time adjustment to monitor dynamic activities and gaps in existing surveillance. This upgrade aims to strengthen forensic investigation capabilities and improve compliance with the Port’s movement rules and regulations through clearer, more comprehensive visual data. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for inquiries. Though no solicitation number is listed, the opportunity was posted on July 27, 2026, and is classified under NAICS code 238210 for electrical and other construction installation services. Performance of the work will occur entirely within the Port’s operational areas, and all services—including system design, regulatory permitting, and physical installation—must be completed to meet the Port’s security and operational standards without disruption to ongoing cargo activities.
Aviation Project Management Group

POSTED

33 minutes ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Parking Garage UPSThe contract involves the demo and replacement of the existing uninterruptible power supply system in a parking garage, ensuring continuous backup power to critical operational components such as ticketing kiosks and automated gates. The project scope encompasses the installation of new UPS equipment along with associated electrical infrastructure including subpanels, feeders, disconnects, and breakers to support the upgraded system. The new UPS units will be equipped with data connectivity for remote alarm monitoring, enhancing system reliability and enabling proactive maintenance. All work must comply with current electrical codes and industry standards to ensure seamless integration with existing facility operations. The contract is being managed by the Aviation Project Management Group under the Port of Seattle, with primary project contact Yanet Maldonado reachable at 206-787-7371 and project manager JJ Jordan available at 206-787-4548. The NAICS code 238210 classifies the work under electrical contracting services, indicating that qualified electrical contractors with experience in mission-critical power systems and commercial facility upgrades are expected to bid. There is no specified set-aside or solicitation number listed, and the posting date indicates planning for a future procurement process in July 2026. Performance location corresponds to the Port of Seattle’s parking garage facility, though exact address details are not provided.
Aviation Project Management Group

POSTED

33 minutes ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Electrical Unit Price Portwide 2026The Port of Seattle is requesting electrical services under the Electrical Unit Price Portwide 2026 contract, which covers a broad range of electrical work across multiple Port-owned facilities including Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. The scope includes installation of raceways, wiring, medium voltage cabling, boxes, transformers, miscellaneous electrical devices, temporary power and lighting systems, testing, and grounding—all performed in full compliance with applicable codes and regulations. The Contractor is responsible for providing all labor, tools, equipment, materials, and incidentals required to execute each task as directed through a Work Authorization issued by the Port. Labor must be staffed according to the specific classifications outlined in the Schedule of Unit Prices, ensuring alignment with established wage and skill standards. This contract is a forecasted solicitation posted on July 27, 2026, with NAICS code 238210 indicating it falls under Electrical Contractors and Other Wiring Installation Contractors. Work will be managed through Port Construction Services, with primary point of contact Heather Bowden and Project Manager Lesley Miles available for coordination. There is no defined set-aside type, meaning the contract is open to all eligible vendors. The work will occur at numerous locations throughout the Port’s jurisdiction, requiring flexibility and coordination across diverse operational environments. Bidders must be prepared to respond to work requests on an as-needed basis, with pricing dictated by the pre-established unit rates provided in the Schedule of Unit Prices.
Port Construction Services

POSTED

33 minutes ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract pertains to the on-site installation of generators, encompassing all necessary electrical tie-ins, grounding systems, and fuel connections, followed by full commissioning through load bank testing to verify performance under simulated operational loads. The work must be performed at the designated location under the oversight of the City of Lyons in Georgia, with all technical requirements aligned to industry standards for safety, reliability, and compliance. The subcontract, classified under NAICS code 238210 for electrical contractors, requires full responsibility for the entire lifecycle of the installation from delivery through final acceptance testing. Proposals must be submitted no later than June 3, 2026, and the opportunity is open to qualified subcontractors capable of executing complex power system integrations. The contract does not specify a set-aside status or eligibility constraints, suggesting it is open to all eligible entities with the requisite expertise. The city seeks a turnkey solution that ensures the generators are fully operational, properly grounded, safely connected to fuel sources, and verified under load conditions to meet critical power reliability requirements. All work must align with applicable codes and regulations, with no provision for remote or partial installation—complete on-site execution is mandatory.

General Info

On-site generator installation, electrical tie-ins, grounding, fuel connections, load testing for City of Lyons.

Agency

Georgia → City of LyonsView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Lyons
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Lyons
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site installation of generators including electrical tie-ins, grounding, fuel connections, and commissioning through load bank testing.