INSULATION SLEEVING

Active
SPE4A6-26-T-06JBFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the procurement of electrical insulation sleeving under the part number 154719-005 and NSN 5970013254074, with a quantity of 10 feet to be delivered within 67 days to Tinker Air Force Base, Oklahoma. All technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements, with specifications referencing QAP 77445 MQR-PSD-1 Revision 2 dated 10/29/2019. Sampling must follow MIL-STD-1916 or ASQ H1331 Table 1, or an equivalent zero-based sampling plan, with critical, major, and minor attributes assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively; unspecified attributes are treated as major. Acceptance criteria require zero non-conformances unless otherwise stated, and the manufacturer may choose attribute or variable inspection under MIL-STD-1916. Unit of issue is foot, and no Item Unique Identification is required under DFARS 252.211-7003(c)(1)(i). Packaging must comply with DLA Packaging Requirements (RP001) and MIL-STD-129 labeling, with non-hazardous material packaged per ASTM D3951 while hazardous material must meet FED-STD-313 and TQ requirement IP025. DLA Master List requirements supersede ASTM D3951. Palletization, marking, and labeling must align with DLA standards, and the delivery is FOB origin with a quantity variance of plus or minus 10 percent. Inspection and acceptance occur at the destination, and the shipment must arrive by September 28, 2026. All transportation directives are governed by DLAD Proc Notes C19 and C20, with the point of contact for queries being Marcita Robinson.

General Info

Procure 10 feet of electrical insulation sleeving part 154719-005 for Tinker AFB, delivery by September 28, 2026, per DLA and MIL-STD specs.

Agency

Department Of Defense → ASC COMMODITIES DIVISIONView Agency

NAICS

331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased SteelView NAICS

Place of Performance

3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB, OK, 73145-8000, US

Set-Aside

NONE

Documents

(1)

Request for Quotations SPE4A6-26-T-06JB

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → ASC COMMODITIES DIVISION
Contacts1 person available
OfficeUS
Organization / Agency
Department Of Defense → ASC COMMODITIES DIVISION
View Agency Profile
Office AddressUS
Contacts

Full Description

Show more
INSULATION SLEEVING
INSULATION SLEEVING,ELECTRICAL
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
Item Unique Identification is not required by request of the Service customer. DFARS 252.211-7003(c)(1)(i) applies.
UNISON INDUSTRIES LLC 59501 P/N 154719-005
TDP Rev A Gen 2 IAW REFERENCE QAP 77445 MQR-PSD-1 REVISION NR 2 DTD 10/29/2019 PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7017040176 0001 FT 10.000
SPE4A6-26-T-06JB
SECTION B
PR: 7017040176 PRLI: 0001 CONT’D
NSN/MATERIAL:5970013254074
DELIVERY (IN DAYS):0067
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 10% MINUS 10%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
IF MATERIAL IS CONSIDERED HAZARDOUS IAW FED-STD-313,
PACKAGE IN ACCORDANCE WITH TQ REQUIREMENT IP025.
IF THE MATERIAL IS NOT CONSIDERED HAZARDOUS, IN ACCORDANCE WITH
FED-STD-313, THE MATERIAL SHALL BE COMMERCIALLY PACKAGED IN ACCORDANCE
WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
US
Need Ship Date:09/28/2026 Original Required Delivery Date:09/28/2026
SPE4A6-26-T-06JB NSN/Part Number: 5970-01-325-4074 Quantity: 10 FT Purchase Request: 7017040176QTY: 10 Delivery: 67 days ADO

Similar Contracts

NAICS: 331210
New
DIBBS
INSULATION SLEEVING, ELThis contract pertains to the procurement of electrical insulation sleeving, a specialized material identified by NSN 5970012725927 and part numbers from Hellermanntylon and TE Connectivity, with a requirement for 14 units to be delivered within 20 days of award. The technical and quality specifications are governed by the DLA Master List of Technical and Quality Requirements, with sampling procedures mandated to follow MIL-STD-1916 or ASQ H1331 Table 1, utilizing zero defect acceptance criteria unless otherwise stated in the contract. Attributes are to be classified as critical, major, or minor with corresponding verification levels or AQLs, and unspecified attributes are treated as major. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, with no special marking required, and palletization must meet DLA packaging standards. The material has no shelf life limitation, and government identification must be removed from non-accepted supplies. Delivery is FOB origin, with inspection and acceptance taking place at the point of origin under a strict zero variance policy. The item is to be shipped to the Government of Israel, Ministry of Defense, via the designated freight forwarder G&B Packing Company in Jersey City, NJ. The contract reference number is SPE4A6-26-T-06TB, solicited on July 15, 2026, with responses due by July 23, 2026. The unit of issue is each, priced at $14.00 per unit, totaling $196.00. All packaging, marking, and shipping must adhere to applicable military standards and DLA requirements, including hazardous materials handling if applicable. The contract is issued under the Department of Defense, managed by the ASC Commodities Division, with Angela Boyce as the primary point of contact.
ASC COMMODITIES DIVISION

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 331210
New
DIBBS
Raw Material Supply – High-Strength Alloy SteelThe contract seeks the supply of certified high-strength alloy steel bar stock, specifically grades such as AISI 4340 and AMS 6414, intended for use in aerospace fastener production. All materials must come with full traceability and accompanying mill test reports to ensure compliance with stringent aerospace quality standards. The material must meet exacting mechanical and chemical specifications required for mission-critical components. Performance is to be delivered to a FPO address with ZIP 96306-2739, indicating shipment to a military postal destination. The contract is classified as a subcontract under NAICS code 331210, which pertains to steel forging and rolling. The solicitation was posted on July 15, 2026, with responses due by July 23, 2026, and is issued by the Department of Defense through the AVIATION SUPPLY CHAIN ESOC BUYS organization. The procurement is part of a broader effort to secure reliable, qualified raw material sources for defense aerospace applications, emphasizing material integrity and documentation rigor. While no specific set-aside provisions are indicated, the requirement for certified material and traceability ensures only suppliers with proven capability in aerospace-grade metallurgy are eligible. The contract does not list a point of contact, with all inquiries likely directed through the DIBBS portal linked in the posting. Suppliers must be prepared to meet exacting certification requirements, maintain auditable records for the life of the product, and ensure timely delivery to meet production schedules within the defense supply chain.
AVIATION SUPPLY CHAIN ESOC BUYS

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 331210
New
DIBBS
TUBE, CONDENSER-RECEIVEThe contract specifies the procurement of a U-shaped, integral finned tube condenser-receiver made of copper alloy, identified by part number 9W70-1743-1 and NSN 4710-01-149-9146, with a quantity of 42 units. The item is classified as a critical application and must comply with stringent technical and quality requirements referenced from the DLA Master List, including sampling procedures aligned with MIL-STD-1916 or ASQ H1331, where critical, major, and minor attributes are verified at levels VII, IV, and II respectively, with acceptance criteria requiring zero non-conformances unless otherwise stated. The product must not contain ozone-depleting chemicals or mercury or mercury-containing compounds, except under specific exceptions for batteries, fluorescent lights, instruments, sensors, controls, weapon systems, and chemical reagents authorized by NAVSEA, with portable mercury-containing devices requiring shock-proof construction and a secondary containment boundary as per NAVSEA 5100-003D. Packaging must adhere to MIL-STD-2073-1E and MIL-STD-129 for marking, with no special marking required, and palletization governed by DLA packaging standards. Delivery is FOB origin, with inspection and acceptance occurring at the destination, and no variance in quantity is permitted. The delivery schedule mandates fulfillment within 161 days, with a required ship date of January 5, 2027, and a final delivery deadline of May 21, 2027. The item must be shipped to the designated receiving facility in Tracy, California, with transportation details governed by DLA procedural notes C19 and C20. Configuration changes require an engineering change proposal or variance request, and all source approval documentation must meet RC001 requirements. The contract is issued under the Department of Defense’s Fluid Handling Division, with the solicitation number SPE7M4-26-T-262K and a response deadline of July 27, 2026.
FLUID HANDLING DIVISION

POSTED

2 days ago

DEADLINE

in 11 days