Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Manufactured Home Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the supply and installation of three new manufactured homes, encompassing all necessary site preparation, foundation construction, utility connections, and final setup to ensure full operational readiness. The work is being performed at a designated location in Thousand Oaks, California, with a ZIP code of 91360, under the oversight of the Calleguas Municipal Water District. The project falls under the NAICS code 236115, indicating it is classified as residential construction activity, specifically for single-family home building. This is structured as a subcontract and is scheduled with a posted date of July 7, 2026, signaling its anticipated future execution timeline. All components required for successful deployment, from delivery to final connection of services, are included within the scope of work, requiring comprehensive coordination between logistics, civil, and utility teams to meet project specifications.

General Info

Supply and installation of three manufactured homes in Thousand Oaks, CA, under Calleguas Municipal Water District oversight.

Agency

California → Calleguas Municipal Water District

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Thousand Oaks, CA, 91360

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calleguas Municipal Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Calleguas Municipal Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of three new manufactured homes including site preparation, foundation work, utility connections, and final setup.

Similar Contracts

NAICS: 236115
New
SLED
8460 El Paseo GrandeThe project at 8460 El Paseo Grande in San Diego’s La Jolla community involves the demolition of an existing 3,009 square-foot two-story single-family residence and a 527 square-foot detached garage to make way for a new two-story residence totaling 5,755 square feet, including a basement and attached garage, along with associated hardscape and landscaping improvements. The site spans 0.26 acres and is zoned Very Low Density Residential under the La Jolla Community Plan, falling within the La Jolla Shores Planned District – Single Family Base Zone and the Coastal Appealable Overlay Zone, which imposes additional regulatory requirements due to its proximity to the coastline. The legal description confirms the property is Lot 4 of Ocean Terrace Map No. 2615, excluding any land below the mean high tide line of the Pacific Ocean, reinforcing its coastal location and the need for stringent environmental and coastal development compliance. A Coastal Development Permit and Site Development Permit are required to proceed, reflecting the project’s alignment with local planning guidelines and state coastal regulations. The City of San Diego is managing the process through its Planning Department, with Marlene Watanabe, Associate Planner, serving as the primary point of contact for inquiries. The project is listed as a forecast with a posted date of July 10, 2026, indicating it is in the pre-application or planning phase, prior to formal solicitation or funding activation. All development activities must adhere to the stringent standards of the Coastal Overlay Zone, including potential public review, appeal processes, and environmental assessments to ensure minimal impact on the coastal environment and alignment with the community’s long-term land use goals.
City of San Diego

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 236115
New
SLED
Snow Minor Use Permit / Coastal Development Permit: N-DRC2023-00054Mark Snow has submitted a request for a Minor Use Permit and Coastal Development Permit for the construction of a single-story, 4,412 square-foot single-family residence on a 251-acre parcel located at 887 Atascadero Road adjacent to the Morro Bay city limit within the Coastal Zone of the Estero Planning Area. The project includes a 1,384 square-foot attached garage, 1,315 square-feet of deck areas, a new access driveway, a private water system consisting of a well and water tank with associated waterline, and a septic system with leach fields. The development will disturb approximately 1.4 acres of land classified under the Agriculture land use category and will involve the movement of 3,100 cubic yards of cut material, 2,500 cubic yards of fill material, and the export of 600 cubic yards of excess earth. The permit application is filed under N-DRC2023-00054 and is being processed by San Luis Obispo County through its planning division. The primary point of contact for the county is Dane Mueller, Planner II, reachable at the county’s official email and phone, while the applicant, Jerry Mark Snow, can be contacted via his private service email and number. The project is forecasted with a posted date of July 9, 2026, and is associated with the NAICS code 236115 for single-family housing construction, though no contract value, pricing, deliverables, evaluation criteria, or federal acquisition regulation clauses are documented in the available materials. All permit-related actions are governed under local coastal and land use regulations, with no federal procurement or contractual terms identified.
San Luis Obispo County

POSTED

5 days ago

DEADLINE

N/A
View Details