Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Missouri Gulch Workforce Housing Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Missouri Gulch Workforce Housing Project in Mariposa County, California, involves the rezoning of approximately 3.3 acres from Single Family Residential and Professional Office zones to a Multi-Family Residential Zone to facilitate the construction of an 80-unit workforce and affordable housing development. Located at 5158/5160 Jones Street, the project will feature one-, two-, and three-bedroom units across five structures with a total building area of approximately 98,542 square feet. Twenty percent of the units are reserved for affordable housing. The development includes 5,000 square feet of outdoor community and recreational space, a 950 square foot community room, and sustainable features such as all-electric infrastructure and electric vehicle charging stations. While the total project site encompasses 9.7 acres, 6.4 acres will remain designated as Single Family Residential and will not be developed. The project is subject to the California Environmental Quality Act (CEQA), with a Mitigated Negative Declaration approved by the Mariposa County Board of Supervisors. Construction is scheduled to begin on May 20, 2027, with building construction concluding by October 6, 2028, followed by paving and architectural coating through December 13, 2028. Key compliance requirements include adherence to greenhouse gas regulations established by the MCAPCD, strict fire safety codes, and the implementation of a Mitigation, Monitoring, and Reporting Program. Additionally, the contractor must follow specific protocols for the discovery of human remains and maintain equipment standards according to CalOSHA regulations. The project is managed under General Plan/Area Plan/Zoning Map Amendment Application No. PLAN-DIS-2026-00083 and Major Design Review Application No. PLAN-DIS-2026-0082.

General Info

80-unit workforce housing project in Mariposa County, California, starting May 20, 2027.

Agency

California → Mariposa County

Place of Performance

north Side of Jones Street, CA, 95338

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mariposa County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Mariposa County
Office AddressN/A
Contacts
Will FassettSenior Community Design and Development Planner
Briza Grace SholarsPrincipal Environmental Planner, Environmental Project Manager

Interested Companies (1)

Provost & Pritchard Consulting GroupClovis, CA

Full Description

Show more
The proposed workforce housing Project would involve development of a multi-family residential complex containing up to 85 dwelling units within five three-story residential buildings, located on three parcels north of Jones Street totaling approximately 9.7 acres within the unincorporated community of Mariposa. The parcels are owned by the Yosemite Conservancy and consist of largely undeveloped land characterized by varying topography and an on-site drainage feature. The site was partially burned during the 2024 French Fire. Due to steeper terrain in the northern portion of the site, development would be concentrated in the southern approximate 4.1 acres of the property along the Jones Street frontage. The northern area would remain largely undisturbed and continue to exist in its current condition. The proposed Project would be developed in two phases. Phase 1 would consist of low-income units, and the second phase would be units priced at market value. The units would include a mix of one-, two-, and three-bedroom units. One additional building, located adjacent to Jones Street, would include limited non-residential space intended to serve residents and the surrounding community, including offices, a conference room, and an approximately 950 square-foot (SF) community room. The Project will comply with California Fire Codes as well as local fire department requirements. Specifically, the proposed buildings will be developed with 1-hour fire rated construction, utilize fire resistant finishes, and provide full National Fire Protection Association (NFPA) fire sprinkler protection. The Project site will be designed and detailed to provide sufficient defensible space around the buildings and resist wildfires. The five residential buildings would have a combined maximum building footprint of approximately 40,000 SF. The building adjacent to Jones Street will have a split use ground floor which includes a community room, offices, and several residential units. There will be two curb cuts on Jones Street, but one drive aisle will be Emergency Vehicle (EV) Access only. It will be used only for emergency vehicles or for emergency site evacuation and will serve as the primary pedestrian access route through site. The proposed Project will include internal drive aisles and parking areas providing approximately 90 parking spaces for residents and visitors. (Parking areas and drive aisles would occupy up to approximately 32,000 SF). In addition, the Project would incorporate electric vehicle charging stations, in compliance with California’s Green Building Code (CALGreen) requirements. Up to three trash enclosure structures would be located within the parking areas on site to serve the development. The proposed Project would include approximately 5,000 SF of outdoor community and recreational space, which may include landscaped open space, a garden, a playground, or similar type amenities for residents. A recreational trail segment may also be constructed through the Project site to provide sustainable mobility. In addition, the proposed Project may include the use of a car sharing service. This car sharing service would be based on the Project site and would include the use of electric vehicles that can be booked by residents or visitor, on an hourly or daily basis. This would provide users to take advantage of a convenient, inexpensive, emission-free option ridesharing program to get to their destination, whether it be a workplace, school, or other location. Bus passes may also be included as an incentive for residents. The site contains an existing drainage feature locally known as Missouri Gulch; however, the proposed Project design would intentionally avoid this feature. All development would occur outside of the topographic top-of-bank associated with the drainage channel, and no grading or construction would occur within the bed or banks of the waterway. The proposed Project would connect existing public utilities provided by Mariposa Public Utility District who serves the Mariposa Town Planning Area, including water and wastewater, and storm drainage systems maintained by Mariposa County Public Works. The proposed Project would implement an exclusive 100% all-electric design, completely omitting natural gas and propane plumbing infrastructure. To achieve this, no combustion-based heating systems will be integrated, and no gas lines or flues will be installed, ensuring a zero-emissions, modern, and energy-efficient facility. Furthermore, the proposed Project would include up to five on site underground detention basins to capture on-site storm flows. The detention basins would be designed to release stormwater runoff at existing rates to the County storm drainage system. Sustainable design features may include rooftop photovoltaic solar panels on the residential buildings, passive design to maximize solar gain and air flow, with ultimate configuration determined during final design. Construction would involve typical activities including site preparation, grading, utility installation, building construction, paving, and landscaping. In order to permit the proposed Project, Mariposa County would require a General Plan/Zoning Amendment (GP/ZA), Lot Line Adjustment (LLA), and Design Review. The GPA and ZA would pertain to the 4.1 acres proposed to be developed. The remaining 6.2 acres would remain SFR-9K and Split. The proposed GPA would change the existing land use from Single Family Residence (SFR) ½ and SFR 9K to Multi-Family Residential (MFR) to accommodate the proposed multi-family residential complex. The proposed ZA would change the existing zoning designations from SFR-9K and PO to MFR to accommodate the proposed multi-family residential complex. The LLA would be necessary to adjust the Project site to meet proposed design standards. The current Project site consists of three APNs and an LLA would result in up to three parcels. The proposed Design Review is required because the proposed Project is located within the Design Review Overlay (DRO) Zone District. The DRO is intended to protect and regulate the design of new structures and changes in the appearance of existing structures. The purpose of this district is to ensure that proposed buildings, structures, signs, and landscaping and modifications to buildings, structures, signs, and landscaping within these areas are in harmony with the surrounding areas. The intent of the zone is to enhance tourism and to stabilize and increase property values. The Area of Potential Effect (APE) and Project Site encompass approximately 4.1 acres located on the north side of Jones Street. All proposed construction activities are strictly confined within this 4.1-acre footprint. Because the final project site design was not yet established during preliminary planning in 2025, environmental compliance surveys evaluated a larger study area to ensure comprehensive coverage. Consequently, the Biological Evaluation surveyed approximately 11.6 acres, and the Phase I Cultural Resources Assessment surveyed approximately 5.88 acres.

Similar Contracts

Same NAICS industry code

NAICS: 541690
New
SLED
Comprehensive Zoning Ordinance Review and Revision Services
Solicitation # 26-REQ-129
Effingham County is seeking an experienced planning and land use consultant under solicitation 26-REQ-129 to provide comprehensive review and revision services for its Unified Development Ordinance (UDO) and Zoning Ordinance. The project focuses on modernizing and reorganizing the ordinance, specifically targeting residential zoning districts R-1 through R-6, multifamily density, RV residency, and the separation of zoning standards from engineering standards. The selected consultant will be responsible for delivering redline and clean adoption-ready drafts, a summary memorandum explaining the rationale for substantive changes, and providing professional support during at least two Board of Commissioners meetings. The contract will be awarded based on a points-based scoring method considering price and other advantageous factors, with a requirement for a lump-sum fee proposal. Qualified vendors must demonstrate a proven track record by providing three similar projects completed within the last five years and identifying a dedicated project manager and key personnel. Compliance requirements include maintaining liability and workman's compensation insurance, providing a drug-free workplace certification, and signing an E-Verify affidavit. Proposals are limited to 12 pages and must be submitted via the County's eProcurement Portal by October 28, 2026.
Development Services

POSTED

1 day ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS