Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Missouri Gulch Workforce Housing Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Missouri Gulch Workforce Housing Project is a mixed-income residential development proposed on approximately 4.1 acres of the 9.7-acre site north of Jones Street in the unincorporated community of Mariposa, California, owned by the Yosemite Conservancy. The project will consist of five three-story residential buildings containing up to 85 dwelling units, including a mix of one-, two-, and three-bedroom units, with Phase 1 designated for low-income housing and Phase 2 for market-rate units. A sixth building adjacent to Jones Street will accommodate limited non-residential functions such as offices, a conference room, and a 950-square-foot community room. All structures will feature 1-hour fire-rated construction, fire-resistant finishes, and full NFPA sprinkler systems, with defensible space designed to meet California fire codes and address wildfire risks from the 2024 French Fire. The development will be fully electric, with no natural gas or propane infrastructure, and will include rooftop solar panels, passive design elements, and up to five underground stormwater detention basins to maintain pre-development runoff rates. Approximately 90 parking spaces will be provided within 32,000 square feet of paved areas, along with electric vehicle charging stations compliant with CALGreen, and up to three trash enclosures integrated into the parking layout. The site design intentionally avoids the existing Missouri Gulch drainage feature, with all construction confined outside its topographic banks to preserve natural hydrology. Outdoor communal amenities totaling 5,000 square feet will include landscaped open space, a garden, a playground, and a potential recreational trail to support sustainable mobility. A car-sharing program using electric vehicles will be available to residents and visitors, supplemented by the possibility of offering bus passes as a transportation incentive. The project will connect to public utilities through the Mariposa Public Utility District and Mariposa County Public Works for water, wastewater, and storm drainage. To enable development, Mariposa County requires a General Plan/Zoning Amendment to reclassify the land from Single Family Residence to Multi-Family Residential, a Lot Line Adjustment to consolidate three APNs into up to three new parcels, and Design Review under the Overlay Zone to ensure architectural harmony, promote tourism, and protect property values. Construction is scheduled from April 2027 through December 2028, with site preparation beginning in late April 2027 and building completion by October 2028. Environmental compliance includes a Phase I Cultural Resources

General Info

Mixed-income housing with 85 units, fire-safe electric design, solar power, EV charging, no gas, stormwater basins, 90 parking spaces, planned 2027–2028 construction.

Agency

California → Mariposa County

NAICS

541690 - Other Scientific and Technical Consulting ServicesView NAICS

Place of Performance

north Side of Jones Street, CA, 95338

Set-Aside

NONE

Documents

(4)

Missouri Gulch Workforce Housing Project Summary Form

PDFproject-summary

2026-07 Draft Initial Study/Mitigated Negative Declaration for Missouri Gulch Workforce Housing Project

PDFenvironmental-assessment

Missouri Gulch Workforce Housing Project Notice of Completion

PDFnotice-of-completion

Missouri Gulch Workforce Housing Project Notice of Intent

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mariposa County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Mariposa County
Office AddressN/A
Contacts
Will FassettSenior Community Design and Development Planner
Briza Grace SholarsPrincipal Environmental Planner, Environmental Project Manager

Interested Companies (1)

Show more
Provost & Pritchard Consulting Group
Visalia, CA

Full Description

Show more
The proposed workforce housing Project would involve development of a multi-family residential complex containing up to 85 dwelling units within five three-story residential buildings, located on three parcels north of Jones Street totaling approximately 9.7 acres within the unincorporated community of Mariposa. The parcels are owned by the Yosemite Conservancy and consist of largely undeveloped land characterized by varying topography and an on-site drainage feature. The site was partially burned during the 2024 French Fire. Due to steeper terrain in the northern portion of the site, development would be concentrated in the southern approximate 4.1 acres of the property along the Jones Street frontage. The northern area would remain largely undisturbed and continue to exist in its current condition. The proposed Project would be developed in two phases. Phase 1 would consist of low-income units, and the second phase would be units priced at market value. The units would include a mix of one-, two-, and three-bedroom units. One additional building, located adjacent to Jones Street, would include limited non-residential space intended to serve residents and the surrounding community, including offices, a conference room, and an approximately 950 square-foot (SF) community room. The Project will comply with California Fire Codes as well as local fire department requirements. Specifically, the proposed buildings will be developed with 1-hour fire rated construction, utilize fire resistant finishes, and provide full National Fire Protection Association (NFPA) fire sprinkler protection. The Project site will be designed and detailed to provide sufficient defensible space around the buildings and resist wildfires. The five residential buildings would have a combined maximum building footprint of approximately 40,000 SF. The building adjacent to Jones Street will have a split use ground floor which includes a community room, offices, and several residential units. There will be two curb cuts on Jones Street, but one drive aisle will be Emergency Vehicle (EV) Access only. It will be used only for emergency vehicles or for emergency site evacuation and will serve as the primary pedestrian access route through site. The proposed Project will include internal drive aisles and parking areas providing approximately 90 parking spaces for residents and visitors. (Parking areas and drive aisles would occupy up to approximately 32,000 SF). In addition, the Project would incorporate electric vehicle charging stations, in compliance with California’s Green Building Code (CALGreen) requirements. Up to three trash enclosure structures would be located within the parking areas on site to serve the development. The proposed Project would include approximately 5,000 SF of outdoor community and recreational space, which may include landscaped open space, a garden, a playground, or similar type amenities for residents. A recreational trail segment may also be constructed through the Project site to provide sustainable mobility. In addition, the proposed Project may include the use of a car sharing service. This car sharing service would be based on the Project site and would include the use of electric vehicles that can be booked by residents or visitor, on an hourly or daily basis. This would provide users to take advantage of a convenient, inexpensive, emission-free option ridesharing program to get to their destination, whether it be a workplace, school, or other location. Bus passes may also be included as an incentive for residents. The site contains an existing drainage feature locally known as Missouri Gulch; however, the proposed Project design would intentionally avoid this feature. All development would occur outside of the topographic top-of-bank associated with the drainage channel, and no grading or construction would occur within the bed or banks of the waterway. The proposed Project would connect existing public utilities provided by Mariposa Public Utility District who serves the Mariposa Town Planning Area, including water and wastewater, and storm drainage systems maintained by Mariposa County Public Works. The proposed Project would implement an exclusive 100% all-electric design, completely omitting natural gas and propane plumbing infrastructure. To achieve this, no combustion-based heating systems will be integrated, and no gas lines or flues will be installed, ensuring a zero-emissions, modern, and energy-efficient facility. Furthermore, the proposed Project would include up to five on site underground detention basins to capture on-site storm flows. The detention basins would be designed to release stormwater runoff at existing rates to the County storm drainage system. Sustainable design features may include rooftop photovoltaic solar panels on the residential buildings, passive design to maximize solar gain and air flow, with ultimate configuration determined during final design. Construction would involve typical activities including site preparation, grading, utility installation, building construction, paving, and landscaping. In order to permit the proposed Project, Mariposa County would require a General Plan/Zoning Amendment (GP/ZA), Lot Line Adjustment (LLA), and Design Review. The GPA and ZA would pertain to the 4.1 acres proposed to be developed. The remaining 6.2 acres would remain SFR-9K and Split. The proposed GPA would change the existing land use from Single Family Residence (SFR) ½ and SFR 9K to Multi-Family Residential (MFR) to accommodate the proposed multi-family residential complex. The proposed ZA would change the existing zoning designations from SFR-9K and PO to MFR to accommodate the proposed multi-family residential complex. The LLA would be necessary to adjust the Project site to meet proposed design standards. The current Project site consists of three APNs and an LLA would result in up to three parcels. The proposed Design Review is required because the proposed Project is located within the Design Review Overlay (DRO) Zone District. The DRO is intended to protect and regulate the design of new structures and changes in the appearance of existing structures. The purpose of this district is to ensure that proposed buildings, structures, signs, and landscaping and modifications to buildings, structures, signs, and landscaping within these areas are in harmony with the surrounding areas. The intent of the zone is to enhance tourism and to stabilize and increase property values. The Area of Potential Effect (APE) and Project Site encompass approximately 4.1 acres located on the north side of Jones Street. All proposed construction activities are strictly confined within this 4.1-acre footprint. Because the final project site design was not yet established during preliminary planning in 2025, environmental compliance surveys evaluated a larger study area to ensure comprehensive coverage. Consequently, the Biological Evaluation surveyed approximately 11.6 acres, and the Phase I Cultural Resources Assessment surveyed approximately 5.88 acres.

Similar Contracts

Same NAICS industry code

NAICS: 541690
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # C2305
The Elsinore Valley Municipal Water District (EVMWD) is soliciting proposals for the Corydon Well Replacement Project, which involves the professional design, bidding support, and engineering services required to replace and abandon the existing Corydon well in Wildomar, California. The project is divided into two primary phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of the new well and abandonment of the old one; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation design for equipping, testing, and commissioning the new groundwater production well. The project is funded through District funds and a Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, necessitating compliance with federal requirements, including the Build America Act, Buy America Preference, and the use of the Automated Standard Application for Payments (ASAP) system. TKE Engineering, Inc. is seeking qualified DBE, MBE, and WBE firms specializing in hydrology/hydraulic consulting, structural and electrical engineering, geotechnical investigation, and utility potholing. Proposals are due by 10:00 a.m. on September 1, 2026, via the PlanetBids Vendor Portal. Selection is based on demonstrated competence and professional qualifications, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%), while cost and innovation each account for 10%. The total estimated project cost is 2,260,788 dollars, though the final contract will be a negotiated not-to-exceed dollar limit. Awardees must adhere to strict federal and state regulations, including whistleblower protections, drug-free workplace standards, and specific insurance and bonding requirements for contracts exceeding the simplified acquisition threshold.
TKE Engineering, Inc.

POSTED

about 18 hours ago

DEADLINE

in 3 days
View Details