This Government Contract opportunity from California was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
New Meter Socket Installation for BESS Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract requires the installation of two new meter sockets as part of the Glenarm Battery Energy Storage System project, encompassing all associated wiring, cabinet modifications, and seamless integration with the existing metering infrastructure. The work must be completed in accordance with technical specifications to ensure safe and reliable operation within the utility’s current electrical framework. All activities are to be performed at the BESS site under the oversight of the Water & Power Department, Power Supply in California, with full compliance expected for electrical codes, safety protocols, and system compatibility requirements. The solicitation is classified as a subcontract under NAICS code 238210, indicating it falls within electrical contracting services, and is open for responses until June 8, 2026. The project is positioned within the broader scope of enhancing grid resilience through energy storage, and successful bidders must demonstrate proven experience in utility-scale metering upgrades, battery system integration, and coordination with existing infrastructure. No set-aside provisions are specified, and the opportunity is accessible to qualified contractors who can deliver the work as outlined, with performance expected at the Glenarm BESS location.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
