Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Off-Grid Power System Supply (Solar + Battery)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the supply of integrated solar and battery systems designed to deliver 72 hours of uninterrupted power autonomy in remote locations. Each system must include MPPT controllers for optimal energy harvesting and sealed batteries housed in weatherproof enclosures to ensure reliable, low-maintenance operation under harsh environmental conditions. The systems are intended for off-grid use, supporting critical operations where grid connection is not feasible. The procurement is structured as a subcontract under an Indian Small Business Economic Enterprise set-aside, reserved exclusively for Indian-owned small businesses contracted by the Department of the Interior and Indian Health Services. The North West Region of the Department of the Interior is managing this solicitation under NAICS code 335912 for Solar Electric Power Generation Equipment Manufacturing. Responses are due by July 15, 2026, with the opportunity posted on July 1, 2026, and all performance activities to be conducted at unspecified remote sites under the agency’s jurisdiction.

General Info

Supply of solar-battery systems for 72-hour off-grid power to Indian-owned small businesses, due July 15, 2026.

Agency

Department Of The Interior → Northwest RegionView Agency

NAICS

Place of Performance

OR

Set-Aside

ISBEE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Northwest Region
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Northwest Region
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of integrated solar and battery systems providing 72-hour autonomy with MPPT controllers and sealed batteries in weatherproof enclosures for remote operation.

Similar Contracts

NAICS: 335912
New
SLED
Solar Photovoltaic Canopy and Off-Grid Energy System SupplyThe contract calls for the supply and installation of integrated solar photovoltaic canopies paired with battery energy storage systems designed for fully off-grid operation, primarily to power electric vehicle charging stations and related infrastructure. The system must be self-sufficient, capable of generating, storing, and delivering energy without reliance on the traditional electrical grid, ensuring continuous and reliable operation in remote or underserved locations. The solar canopies are expected to be engineered for durability, weather resistance, and seamless integration with the energy storage units to optimize energy capture and utilization throughout varying environmental conditions. The contract is classified as a subcontract under NAICS code 335912, which pertains to other electrical equipment and component manufacturing, and is issued by the State University of New York through its New York office. Proposals must be submitted by the deadline of July 24, 2026, and the opportunity is open for qualified vendors to respond via the provided online portal. There is no set-aside designation, meaning all eligible entities may compete, and performance location details are not specified, implying flexibility in project site selection provided the requirements for off-grid functionality are met. The system must meet technical specifications for energy output, storage capacity, and operational reliability to support charging station needs under real-world usage conditions.
State University of New York

POSTED

2 days ago

DEADLINE

in 20 days
View Details