Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Real-Time Passenger Information Systems

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of digital displays, connectivity hardware, and power systems to deliver real-time bus arrival information at transit stops throughout San Mateo County. The work is scoped to support a modernized passenger information system that enhances rider experience by providing accurate and timely transit updates through visible, reliable digital signage. This includes configuring networked components to ensure seamless data communication between transit vehicles, central systems, and on-site hardware, as well as supplying and installing robust power solutions to sustain operation under all environmental conditions. The project is structured as a subcontract under the agency’s broader initiative to upgrade public transportation infrastructure with technology-driven service improvements. The contractor will be responsible for end-to-end implementation at designated transit locations, ensuring all equipment meets technical specifications for durability, visibility, and network compatibility. The work must be coordinated to minimize disruption to existing transit operations and comply with local standards for public infrastructure. Though the solicitation number and specific point of contact are not provided, the contract is issued under the San Mateo County Transit District’s authority in California and aligns with NAICS code 268210, which covers telecommunications and related services for public transit systems. All installations must be completed in accordance with deadlines set by the agency, and the project site spans multiple transit stops across the county.

General Info

Install digital displays, connectivity, and power systems for real-time bus info at San Mateo County transit stops.

Agency

California → San Mateo County Transit District

NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Mateo County Transit District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Mateo County Transit District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of digital displays, connectivity hardware, and power systems for real-time bus arrival information at transit stops.

Similar Contracts

Same NAICS industry code

NAICS: 268210
SLED
Fiber Optic Cable Installation (Blown or Pulled)The contract entails the installation of fiber optic cable into high-density polyethylene (HDPE) conduits using either blown or pulled methods, requiring precise handling of cable to prevent damage, strict tension control throughout the deployment process, and proper placement of directional markers to ensure future accessibility and maintenance. All work must adhere to industry standards for fiber optic deployment, with attention to site-specific conditions and conduit integrity to guarantee long-term performance and network reliability. The installation is targeted specifically in Mill Valley, California, and falls under the North American Industry Classification System code 268210, which covers telecommunications line installation. This is a subcontract opportunity issued by Caltrans, District 4 – Bay Area/Oakland, under the California Department of Transportation, and was posted on July 2, 2026. The contract does not specify a solicitation number or set-aside status, indicating it may be open to general contractor participation without preference for small, minority, or disadvantaged business enterprises. Work must be performed at the designated place of performance in Mill Valley, with all logistical, equipment, and labor requirements to be managed by the subcontractor. No point of contact details are provided, but further information can be accessed through the official project link associated with the California CEQA Net system.
Caltrans, District 4 - Bay Area/Oakland

POSTED

23 days ago

DEADLINE

N/A
View Details