Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remplacement du système d’intercom, des appareils d’éclairage et désamiantage du grenier

Closed
20150836International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle is preparing to replace the final 125 failing Robicon variable frequency drives (VFDs) as part of Phase 3 of its VFD Replacement project, with work to be completed under a design-bid-build procurement approach. The scope includes full removal of the outdated units and installation of new VFDs, all of which must be integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time energy usage monitoring, output control readings, and efficiency tracking. The project requires complete wiring, rigorous testing, and formal commissioning to ensure the entire system operates reliably and meets performance specifications. All associated equipment necessary for a fully functional installation must be supplied and implemented by the contractor. The effort falls under NAICS code 238210 for electrical contracting and is being managed by the Aviation Facilities & Infrastructure division of the Port of Seattle. Primary point of contact for inquiries is Yanet Maldonado, with Sharon Miick serving as the project manager. The solicitation was posted on July 25, 2026, and while the exact location details are not specified, the work will take place at Port facilities under the jurisdiction of the Aviation Facilities & Infrastructure team. Contractors are expected to deliver a turnkey solution with full system integration and operational readiness upon completion.
Aviation Facilities & Infrastructure

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the design, permitting, and construction necessary to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance surveillance capabilities in key operational zones to support forensic investigations and enforce the Port’s movement rules and regulations. Current camera placements primarily monitor conveyor systems and security doors, but this project will expand coverage to include main terminal drive lanes and entrances in the Bagwell area, ensuring more comprehensive oversight of vehicle movements and activity. In the North Cargo area, flexible camera coverage will be implemented using Pan Tilt Zoom units that allow user-controlled adjustment to bridge gaps in surveillance coverage, providing broad surface area monitoring where needed. The project is managed by the Aviation Project Management Group under the Port of Seattle, with Angela Peterson as the primary point of contact and Randa Williams serving as the Project Manager. The work falls under NAICS code 238210, indicating it is classified as a specialty trade contractor project, and is forecasted to be posted on July 25, 2026. No set-aside provisions are specified, and the physical performance location is within the Port of Seattle’s operational boundaries. The installation effort is designed to deliver a systematic upgrade to the existing security infrastructure, focusing on resolution, coverage, and operational flexibility to better meet the Port’s evolving security and enforcement needs.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle’s Aviation Project Management Group is preparing to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility located at 3150 S 160th Street in SeaTac, which contains per- and polyfluoroalkyl substances (PFAS). The project involves complete removal of the outdated foam system, including contaminated components, followed by the design and installation of a new fully dry chemical fire suppression system. This includes new storage tanks, control valves, pumps, sprinkler piping, sprinkler heads, and reserve tanks, all engineered to meet current safety and environmental standards. The new system must integrate seamlessly with the facility’s existing fire alarm controls to ensure full operational coherence and emergency response capability. The contract is being re-bid under the solicitation title Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement, classified under NAICS code 238210 for fire protection contracting. The effort is managed by the Port of Seattle with primary point of contact Todd Rehm and project manager Pat Nakamura available for inquiries. While no set-aside status or detailed budget is specified, the work is anticipated to proceed after the posting date of July 25, 2026, with performance expected at the RCF location. The project underscores the Port’s commitment to environmental compliance by eliminating PFAS-containing systems and transitioning to safer, non-contaminating fire suppression technology.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

L’appel d’offres porte sur le remplacement du système d’intercom, des appareils d’éclairage et de l’éclairage d’urgence, ainsi que sur le désamiantage et l’isolation du grenier de l’école Saint-Joseph à Notre-Dame-de-Stanbridge, dans la région du Val-des-Cerfs. Les travaux incluent également la démolation d’un mur et d’armoires dans la cuisine de l’établissement. Le désamiantage et l’isolation doivent être achevés le 14 août 2026, les travaux de cuisine le 28 août 2026, tandis que l’intercom et l’éclairage devront être opérationnels avant le 20 novembre 2026. La réception des travaux avec réserve est prévue le 26 février 2026. La visite des lieux est programmée le 15 juin 2026 à 11h30, et les soumissions doivent être déposées au plus tard le 2 juillet 2026 à 14h, soit en enveloppe cachetée au siège social du Centre de services scolaire du Val-des-Cerfs, soit par voie électronique via le SÉAO. Toute soumission tardive sera rejetée. Chaque soumission doit être accompagnée d’une garantie de soumission équivalant à 10 % du montant total hors taxes, émise par une institution financière accréditée, et valable 45 jours après l’ouverture des soumissions. Une lettre d’engagement conforme au modèle de l’annexe 4.02 doit également être jointe, garantissant l’émission d’une garantie d’exécution. Les soumissionnaires doivent détenir la licence requise en vertu de la Loi sur le bâtiment et respecter le Règlement sur les contrats des travaux de construction des organismes publics. Une clause de pénalité pour retard sera appliquée pour assurer le respect des échéanciers, considérés comme essentiels à la réussite du projet. Les demandes d’équivalence doivent être soumises au moins neuf jours avant la date limite, et toute demande d’information doit

General Info

Replacement of intercom, lighting, asbestos removal, kitchen demolition at École Saint-Joseph; deadlines enforced.

Agency

Government of Canada → Centre de services scolaire du Val-des-Cerfs.View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Estrie, Montérégie, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Centre de services scolaire du Val-des-Cerfs.
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Centre de services scolaire du Val-des-Cerfs.
View Agency Profile
Office AddressN/A
Contacts
Prud'Homme JulieContracting Authority

Full Description

Show more
AVIS D’APPEL D'OFFRES PUBLIC TITRE : 262620 No DOSSIER : REMPLACEMENT DU SYSTÈME D’INTERCOM, DES APPAREILS D’ÉCLAIRAGE ET DÉSAMIANTAGE DU GRENIER Propriétaire Centre de services scolaire du Val-des-Cerfs Julie Prud’Homme 55, rue Court Granby (Québec) J2G 9N6 (adresse municipale) Tél. : 450 372-0221 poste 60259 projetsrm@cssvdc.gouv.qc.ca Établissement visé École Saint-Joseph (NDS) 1043, rue Principale Notre-Dame-de-Stanbridge (Québec) J0J 1M0 Professionnel architecture Un Architecture 533, Av. Casgrain, bureau 504 Montréal (QC) H2T 1X3 Professionnel ingénierie Cima 160, rue Principale, Bureau 201 Granby (QC) J2G 2V6 Visite La visite aura lieu le 15 juin 2026 à 11h30 Les personnes qui se présenteront, devront demeurer à l’extérieur jusqu’à l’arrivée du chargé de projet. Travaux visés: - Désamiantage de l’entretoit de la portion de l’école datant de 1985 et ajout d’un nouvel isolant - Remplacement des appareils d’éclairage, des panneaux de Sortie et de l’éclairage d’urgence - Remplacement du système d’intercom - Démolition d’un mur de la cuisine et des armoires Échéancier Début des travaux : 3 août 2026 Fin des travaux : Travaux pour la cuisine : 28 août 2026 Désamiantage et isolation : 14 août 2026 Travaux d’intercom (avant la mise en marche) et éclairage : 20 novembre 2026 Réception des travaux avec réserve : 26 février 2026 Option Aucune option Équivalence Les demandes d’équivalence doivent être déposées au plus tard 9 jours avant la date de dépôt des soumissions. Information Les demandes d’informations doivent être adressées à l’adresse suivante : projetsrm@cssvdc.gouv.qc.ca Les questions seront traitées rapidement et les réponses feront l’objet d’addenda sous la forme de questions /réponses ou de modifications et ajouts aux Documents d’appel d’offres. L’ORGANISME PUBLIC se réserve le droit de ne pas considérer une demande formulée par un fournisseur si cette demande n’est pas transmise moins de 5 jours ouvrables avant la date et l’heure fixées pour la réception des soumissions. Documents Les plans, devis, documents contractuels et autres renseignements pourront être obtenus que par l’intermédiaire du Système d’appels d’offres électroniques (SÉAO) au www.seao.ca Modalité de dépôt des soumissions Enveloppe Les soumissions, dans des enveloppes cachetées et adressées au responsable, seront reçues au siège social du Centre de services scolaire du Val-des-Cerfs, 55, rue Court, à Granby, Québec, jusqu'à 14 h 00, heure en vigueur localement, 2 juillet 2026 pour être ouvertes publiquement au même endroit, le même jour et à la même heure. Toute soumission reçue postérieurement sera automatiquement rejetée. Ou Voie électronique Les Soumissions peuvent être transmises par voie électronique. Le cas échéant, cette transmission ne peut être effectuée que par l’intermédiaire du système électronique d'appel d'offres (SEAO), à l'adresse suivante : https://www.seao.ca. Une Soumission transmise par voie électronique doit être déposée (c'est-à-dire chiffrée, transmise, horodatée et sauvegardée sur les serveurs du SEAO) avant la date et l’heure limites fixées pour la réception des Soumissions. Modalité d’ouverture des soumissions Considérant les dernières mises à jour du SCT, l’ORGANISME PUBLIC procède à une ouverture des Soumissions avec public, de sorte que les SOUMISSIONNAIRES pourront y assister en personne. Garantie de soumission Lettre d’engagement Les soumissions doivent être accompagnées d’une garantie de soumission représentant 10 % du montant total de la soumission excluant toutes les taxes applicables, sous forme de lettre de garantie irrévocable ou de cautionnement de soumission émis par une institution financière qui est un assureur détenant un permis émis conformément à la Loi sur les assurances (L.R.Q., c. A-32) l’autorisant à pratiquer l’assurance cautionnement, une société de fiducie titulaire d’un permis délivré en vertu de la Loi sur les sociétés de fiducie et les sociétés d’épargne (L.R.Q., c. S-29-01), une coopérative de services financiers visée par la Loi sur les coopératives de services financiers (L.R.Q., c. C-67.3) ou une banque au sens de la Loi sur les banques (L.C., 1991, c. 46), sans quoi la soumission sera automatiquement rejetée. Cette garantie de soumission sera valide pour une période de 45 jours de la date d'ouverture des soumissions. Le SOUMISSIONNAIRE doit joindre à sa Soumission une lettre d’engagement signée par une caution garantissant l’émission d’une garantie d’exécution et d'une garantie des obligations de l’ENTREPRENEUR pour gages, matériaux et services conformes aux exigences prévues à la partie 4.00 du Contrat. Il doit, pour ce faire, utiliser le modèle de lettre d'engagement reproduit à l'annexe 4.02 du Formulaire de Soumission. Seuls seront considérés aux fins d'octroi du contrat les entrepreneurs détenant, le cas échéant, la licence requise en vertu de la Loi sur le bâtiment (L.R.Q., c. B-1.1). Les entrepreneurs soumissionnaires sont responsables du choix des sous-traitants, de leur solvabilité et du contenu de leurs soumissions. Toutes les soumissions devront être faites conformément aux dispositions du Règlement sur les contrats des travaux de construction des organismes publics (L.R.Q., c. C-65.1, r.5), adopté en vertu de la Loi sur les contrats des organismes publics. Le Propriétaire se réserve le droit de n’accepter ni la plus basse ni aucune des soumissions. NB : Note explicative – Clause de pénalité pour non-respect des délais Dans le cadre du présent appel d’offres, le respect des délais contractuels constitue une exigence essentielle à la bonne réalisation du projet. À cet effet, une clause de pénalité est prévue au contrat afin d’encadrer les conséquences d’un éventuel retard dans l’exécution des travaux. Cette mesure vise à : assurer la rigueur dans la gestion du projet, protéger les intérêts du donneur d’ouvrage public, favoriser l’équité entre les soumissionnaires en établissant des règles claires et prévisibles. Les soumissionnaires sont invités à prendre connaissance de cette clause et à en tenir compte dans l’élaboration de leur proposition, notamment en ce qui concerne la planification des ressources, la gestion des risques et la capacité à respecter les échéanciers.