Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Rock Armoring and Streambank Stabilization

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the placement of riprap and rock armoring along streambanks to stabilize erosion-prone areas and minimize downstream sedimentation, particularly during and following construction activities. The work is designed to protect aquatic habitats and maintain water quality by reinforcing vulnerable banks with durable rock materials, ensuring long-term structural integrity against water flow and weathering. This effort is part of broader environmental mitigation measures tied to infrastructure or land development projects in sensitive riparian zones. Performed under the jurisdiction of Fish and Wildlife, Region 1 – Northern Region, based in California, the project is classified under NAICS code 237300 for Hydraulic Engineering and Streambank Stabilization. The sole place of performance is located in Trinidad, California, with the contract formally posted on July 30, 2026, and structured as a subcontract. While no set-aside designation or point of contact is specified, the work is clearly aimed at fulfilling ecological compliance objectives, likely in support of state or federal environmental regulations governing waterway protections and habitat conservation.

General Info

Riprap and rock armoring installed in Trinidad, California, to stabilize streambanks and protect aquatic habitats under hydraulic engineering subcontract.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

Place of Performance

Trinidad, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Placement of riprap and rock armoring at streambanks to prevent erosion and reduce downstream sedimentation during and after construction.

Similar Contracts

Same NAICS industry code

NAICS: 237300
SLED
Backfill Material Supply and PlacementThe contract involves the supply and placement of Class II/III backfill material for structural and drainage components, with required compaction testing to ensure proper engineering standards are met. This subcontract is tied to infrastructure work under the NAICS code 237300, indicating it relates to heavy and civil engineering construction, specifically supporting energy and environmental projects managed by the Kentucky Energy & Environment Cabinet. The material must be delivered and properly installed to meet technical specifications for load-bearing and drainage functionality, and all placement activities will be subject to verification through compaction testing protocols. The solicitation was posted on July 7, 2026, with a response deadline of August 11, 2026, at 1:30 PM. The place of performance is listed as “Other,” suggesting work may occur at multiple unspecified locations within Kentucky under the agency’s jurisdiction. No set-aside type is specified, meaning the contract is open to all eligible subcontractors. All bids and submissions must be submitted through the Kentucky VSS portal, and contractors are expected to comply with state engineering and environmental regulations governing backfill material quality, handling, and testing. Failure to meet compaction requirements or material specifications may result in rejection or cost recovery.
Energy & Environment Cabinet

POSTED

27 days ago

DEADLINE

in 8 days
View Details