Water Line Installation – Trenching and Boring
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves excavation, trenching, directional boring, and restoration activities for the installation of a 1.75-mile water line within an existing paved right-of-way. The work requires precise coordination to minimize disruption to existing infrastructure and surface conditions, with restoration efforts focused on returning the paved areas to their original or equivalent condition following construction. All activities must comply with state and local regulations regarding subsurface utility detection, environmental protection, and public safety during operations. This subcontract is issued under the NAICS code 237117 for water and liquid waste pipeline construction and is associated with the State Water Resources Control Board of California. The project was posted on July 7, 2026, and is managed through the California Environmental Quality Act network, with the official project link provided. While specifics on payment terms, deadlines, or performance standards are not included, the scope demands certified personnel, specialized equipment for directional boring, and adherence to quality control protocols for both installation and site restoration.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
