Waterline Replacement – Cured-in-Place Pipe (CIPP) Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract involves the repair of approximately 146 linear feet of underground water piping using the trenchless cured-in-place pipe (CIPP) method. The work is specifically focused on the waterline situated between the water treatment building and the Lincoln Memorial Reflecting Pool. The project aims to install a durable, seamless lining within the existing pipes without the need for extensive excavation, minimizing disruption to the surrounding area. Issued by the Department of the Interior's Dsc Contracting Services Division, this subcontract opportunity is classified under NAICS code 238210, which pertains to electrical contractors and other wiring installation contractors. The contract was posted on June 10, 2026, and responses are due by June 25, 2026. While specific location details and a point of contact are not provided, interested subcontractors are directed to the SAM.gov portal to view and respond to the solicitation. This undertaking ensures the integrity of critical water infrastructure while leveraging advanced trenchless technology to achieve efficient repairs.
General Info
Agency
NAICS
Place of Performance
COSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
