Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

2CMD INC 6800 MANHATTAN BLVD STE 402 FORT WORTH TX 76120-1270 USA

UEI: SLED_756C7B9495FBCFB2

2CMD INC 6800 MANHATTAN BLVD STE 402 FORT WORTH TX 76120-1270 USA is a federal contractor, registered under UEI SLED_756C7B9495FBCFB2. It has been awarded $193,959 across 2 federal contracts. Primary work spans All Other Specialty Trade Contractors and Highway, Street, and Bridge Construction. Top awarding agencies include FA6675 301 Conf Pk.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_756C7B9495FBCFB2

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
FA6675 301 Conf Pk$194.0K100%
Awards by NAICS
238990 - All Other Specialty Trade Contractors$180.0K92.8%
237310 - Highway, Street, and Bridge Construction$14.0K7.2%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in 2CMD INC 6800 MANHATTAN BLVD STE 402 FORT WORTH TX 76120-1270 USA's top NAICS codes and agencies

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group has issued a forecast for a fleet fast EV charging construction project, targeting the development of infrastructure to support electric vehicle charging for airport and fleet operations. The project is classified under NAICS code 237310, indicating it involves electrical and other construction work related to utility systems, with no set-aside provisions specified. The anticipated timeline suggests the solicitation will be issued in the near future, with the public notice posted on July 27, 2026. Performance of the work is expected to occur at Port of Seattle facilities, though specific location details are not yet defined. Primary point of contact for inquiries is Angela Peterson, reachable via phone or email, with Katie Techa serving as the project manager for technical coordination. Potential bidders are directed to the official portal for updates and eventual solicitation documents as the project progresses. While this is currently a forecast and not an active solicitation, it signals the Port’s imminent intent to procure construction services for high-capacity electric vehicle charging systems, potentially involving multiple charging stations, power supply upgrades, and integration with existing fleet operations infrastructure. All interested parties are encouraged to monitor the provided link for formal notices and requirements.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will comprehensively upgrade the entry and exit drives along 19th Ave W, the footprint of the existing Downie Building C-14, and surrounding parking areas. Damaged pavement will be milled and overlaid, while stormwater infrastructure will be fully replaced and expanded to divert runoff from the combined sewer system to dedicated storm lines, with water quality treatment integrated where qualifying pavement surfaces are replaced. The remaining slab of the C-14 building will be demolished and reconfigured into a mix of new parking spaces and green areas designed as pollinator habitats, with potential inclusion of a stormwater treatment facility. A new irrigation system will support the landscaped areas, including the median within the entry drive, and electric vehicle charging stations will be installed in the new parking zones to support sustainable transit. The project also introduces protected two-way bike lanes linking the terminal’s entrance to the existing West Wall bike path, enhancing active transportation connectivity. Pedestrian access will be significantly improved toward the intersection of 21st Ave W and W Emerson Pl, as well as to the nearby King County Metro bus stop. Enhanced lighting will be installed throughout the new parking area and connecting pathways, and comprehensive wayfinding signage will guide pedestrians and cyclists through the reconfigured space. These improvements are being led by the Port of Seattle through its Waterfront Project Management office, with the project classified under NAICS code 237310 for highway, street, and bridge construction, and scheduled for procurement following the posted forecast date of July 27, 2026.
Waterfront Project Management

POSTED

about 12 hours ago

DEADLINE

N/A
View Details