Fisherman’s Terminal (FT) Entry and Exit Paving Redevelopment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.

General Info

Redevelop Fishermen’s Terminal entry with new parking, green spaces, bike lanes, EV chargers, stormwater upgrades, and improved pedestrian access.

Agency

Port of Seattle → Waterfront Project Management

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPort of Seattle → Waterfront Project Management
Contacts2 people available
OfficeN/A
Organization / Agency
Port of Seattle → Waterfront Project Management
Office AddressN/A
Contacts
Mike Van ClevePort Contact
Terrence MoodyProject Manager

Full Description

Show more
The Fishermen’s Terminal (FT) Entry Redevelopment Project will consist of redeveloping the entry and exit drives (19th Ave W), the building footprint of the Downie Building (C-14), and associated parking. Existing pavement in poor condition in these areas will be milled and overlaid, with existing stormwater infrastructure replaced and expanded for additional runoff collection and diversion from existing combined sewer infrastructure to dedicated storm lines. Stormwater water quality treatment is anticipated for the replacement of qualifying pavement surfaces. The C-14 building slab remaining from Phase 1 will be demolished, with the footprint replaced by a combination of additional parking and green space/pollinator habitat with the potential integration of a stormwater treatment facility. A new irrigation system will be installed for this green space, and landscaping in the replaced median within the entry drive. Electric vehicle (EV) charging stations will be installed in the new parking area. Protected two-way bike lane infrastructure will be added connecting the FT entry to the existing West Wall bike path, with improved pedestrian connectivity to the intersection at 21st Ave W and W Emerson Pl and King County Metro bus stop. Lighting improvements will be made in the new parking area and path connecting FT to the intersection and bus stop. New wayfinding will be included to assist with pedestrian and bicycle circulation within the redeveloped area.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The primary objective is to enhance water quality in receiving streams and improve plant reliability while maintaining existing treatment capacity, specifically noting that the project does not address growth. Key technical deliverables include the replacement of influent screens, washer compactors, in-plant pumps, RAS pumps, and the Operations Building Sanitary Grinder Pump Station. Additionally, the scope involves installing a headworks enclosure building, a new chemical storage tank for ferric chloride or alum, and upgrading Motor Control Centers, PLCs, and switchgear. Structural repairs to concrete at the headworks and various building improvements to HVAC, roofing, and windows are also required. This is a wage-rated solicitation with a response deadline of August 17, 2026, at 4:00 PM. The project strongly encourages participation from small businesses, including veteran-owned, HUBZone, and disadvantaged business concerns, and specifically seeks MBE, DBE, and WBE participants for various subcontracting and supply roles. Targeted opportunities include electrical, mechanical, masonry, and painting subcontractors, as well as suppliers for wastewater pumps, sluice gates, and miscellaneous metals. Bids and related documentation are managed through the The Belt Group website, and administrative inquiries are directed to Jared Burkett.
Carl Belt, Inc.

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida, on behalf of the Central Florida Water Cooperative. This comprehensive construction project has an estimated value of 270 million dollars and involves the development of raw water production wells, including well heads, pumps, discharge piping, and surge bladder tanks. The scope of work also encompasses site civil works, an electrical building, a standby generator, and the construction of several specialized facilities, including Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. To ensure regulatory certification, the contract requires production well disinfection and both primary and secondary water quality analytical laboratory testing. Interested parties must submit their proposed scope of work at least 24 hours before the bid date, with firm pricing due by 10:00 am on the day of the bid. The final deadline for submissions is August 19, 2026, at 2:00 pm EST. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com, and bidding documents are available for free download via ConstructConnect.
Wharton-Smith, Inc.

POSTED

about 5 hours ago

DEADLINE

in 4 days
View Details