Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Magruder Mercury Interceptor Force Main Replacement – Section B (YR010520/VCWRLF)

Active
magruder-mercury-interceptor-force-main-replacement-section-b-yr010520vcwrlf

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Companies, Inc.
Contacts1 person available
OfficeN/A
Organization / AgencyGarney Companies, Inc.
Office AddressN/A

Full Description

Show more
Scope of work - The Project or Work consists of Replacement of 24-inch and 30-inch sanitary force main with approximately 220 linear feet of 24-inch Ductile Iron pipe and 4,260 linear feet of 30-inch Ductile Iron pipe, including two (2) trenchless crossings, replacement of site yard piping and meter vault at Langley Circle Pump Station, and abandonment of existing 30-inch force main. The force main replacement is within two project areas: 1. Langley Circle Pump Station off of Thornrose Street; Thornrose Street between North King Street and Bland Street, Bland Street between Thornrose Street and Doolittle Road, and Doolittle Road between Bland Street and Salem Street. 2. Mercury Boulevard between Air Power Park and vacant Parcel ID 8005712 approximately 230 linear feet east of Seldendale Drive for connection in Doolittle Road.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the creation of launch and receiving shafts for trenchless crossings. Additional requirements include the fit-out of a CSO regulator, outfall construction, and the clearing of approximately 5,130 square yards of wooded areas. Project compliance requires the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP) and the provision of geotechnical instrumentation and monitoring. Due to the nature of the site, contractors must also secure specific railroad insurance. The project includes various base bid items for mobilization and site preparation, as well as contingent bid items for additional needs.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational system, including mechanical and electrical systems, a generator, odor control equipment, and new gravity sewers and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions. Required deliverables include performance and payment bonds, proof of insurance, and adherence to specific technical standards such as AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The period of performance begins upon the issuance of a Notice to Proceed, which occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as the installation of site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Bidders must provide a bid guarantee, and the successful awardee will be required to furnish performance and payment bonds equal to 100 percent of the contract amount. The project is subject to Davis-Bacon wage requirements, OSHA safety standards, and ADA compliance for all new sidewalks and ramps. Interested parties should contact Trish Mousavizadegan at [email hidden] for access to plans and specifications.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Garney Companies, Inc.

Same awarding agency

NAICS: 237110
New
MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)
Solicitation # 27-002
The MWWTP Effluent FM Surge and Transient Design Build Services project, solicited by the Charles County Government, involves the design and construction of critical infrastructure to manage hydraulic profiles and surge transients for an existing force main in Maryland. The scope of work includes providing a steady-state hydraulic profile, designing and constructing a new standpipe with a minimum 42-inch diameter influent pipe and a 42-inch diameter effluent pipe, and installing three concrete valve vaults. Additionally, the Design-Builder must route a piped overflow from the standpipe to the effluent pump station wet well and install electrical feeders and control circuits for all new equipment and site lighting. The project is scheduled for completion within 905 consecutive calendar days, divided into a 365-day design phase and a 540-day construction phase. Strict qualification requirements are in place, requiring the lead design and construction firms to have completed at least three projects involving pressure pipes 36 inches or larger with a value exceeding 2 million dollars each for utilities with a capacity of 5 mgd or greater. Key personnel, including the Design Manager and Engineering Leads, must hold current Maryland Professional Engineer or Architect licenses. Acceptance is contingent upon successful hydrostatic testing for seven days and specific transient condition tests, such as ensuring pressure at the flowmeter vault does not drop below 15 psig during multi-pump shutdowns.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Arkansas Valley Conduit Spur and Delivery Lines – SRF Package 1
Solicitation # 2346058*02
The Arkansas Valley Conduit Spur and Delivery Lines SRF Package 1 is a Construction Manager at Risk project managed by Garney Companies, Inc. for the Southeastern Colorado Water Conservancy District. Located in Otero County, Colorado, the overall project involves the construction of approximately 22 miles of potable water transmission and distribution pipeline and appurtenances serving 11 delivery lines. Work Package 1 specifically focuses on the installation of approximately 1,370 linear feet of water delivery pipelines for the City of Rocky Ford and the Eureka Water Company, including the installation of valves, appurtenances, and site restoration. The scope requires various specialized services, including asphalt and concrete paving, materials testing, surveying, environmental controls, traffic control, hydrovac potholing, and trucking. This solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bidders must comply with strict State Revolving Fund requirements, including Davis-Bacon wage determinations and Build America, Buy America standards. Award considerations are based on a sealed bid process where bidders must demonstrate responsibility through good faith efforts to utilize DBEs and submit all required certifications, including CDPHE suspension and debarment forms and surety letters. The contract is governed by the EJCDC CMAR Agreement and Colorado Department of Transportation Standard Specifications, with mandatory performance and payment bonds required upon the execution of work authorization.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS