Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Active
mwwtp-effluent-fm-surge-transient-design-build-services-un-1282

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The MWWTP Effluent FM Surge and Transient Design Build Services project, managed by Garney Companies, Inc. in Maryland, requires a design-build team to address hydraulic profiles and infrastructure for an existing force main. The scope of work includes the design and construction of a new standpipe, the installation of three concrete valve vaults, and the implementation of a piped overflow system routed to the effluent pump station wet well. Key technical requirements include the installation of minimum 42-inch diameter influent and effluent pipes, with the design-builder responsible for the routing and penetration of the wet well wall to ensure discharge occurs above the high-high level. Additionally, the contractor must provide all necessary electrical feeders and control circuits for the new equipment, instrumentation, and site lighting, utilizing existing panels within the Effluent Pump Station. This solicitation is specifically set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises under NAICS code 237110. Interested parties must submit their responses by October 30, 2026.

General Info

Garney Companies seeks WOSB/DBE design-build services for MWWTP effluent surge infrastructure by October 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Companies, Inc.
Contacts1 person available
OfficeN/A
Organization / AgencyGarney Companies, Inc.
Office AddressN/A

Full Description

Show more
Scope of work - Provide steady-state hydraulic profile for the existing force main, Design and construct New Standpipe, Provide three (3) concrete valve vaults, Piped overflow from standpipe to be routed to effluent pump station wet well. Design-Builder Team to design routing and penetration through wet well wall. The overflow invert shall discharge into the wet well above high-high level. Provide minimum 42-inch diameter influent pipe from existing force main to standpipe. Provide minimum 42-inch diameter effluent pipe from standpipe with reducer to join with the existing pump station bypass, Electrical feeder and control circuits for new equipment and instrumentation for standpipe, valve vaults, and site lighting shall be run from existing panels in the Effluent Pump Station.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS