Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Water Pipeline Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 2346058*02.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Arkansas Valley Conduit Spur and Delivery Lines – SRF Package 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Companies, Inc.
ContactsNo contacts available
OfficeN/A
Organization / AgencyGarney Companies, Inc.
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water mains, pipes, fittings, and accessories for prime contractors on Bureau of Reclamation water pipeline projects. Handles and places pipes using nylon ropes and slings to prevent damage, installs piping to accurate line and grade, and installs dielectric couplings for ferrous/non-ferrous connections. Delivers an installed and aligned water pipeline system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Garney Companies, Inc.

Same awarding agency

NAICS: 237110
New
MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)
Solicitation # RFP 27-002
Solicitation RFP 27-002 is a design-build project for the MWWTP Effluent FM Surge and Transient system in Maryland, managed by Garney Companies, Inc. for the Charles County Government. The scope of work involves providing a steady-state hydraulic profile for the existing force main, designing and constructing a new standpipe, and installing three concrete valve vaults. Key technical requirements include the installation of influent and effluent pipes with a minimum 42-inch diameter, routing a piped overflow from the standpipe to the effluent pump station wet well, and implementing electrical feeder and control circuits from existing panels. The project also requires the replacement of an intermediate highpoint combination valve with a specific 6-inch A.R.I. Model D-60-C-NS valve. The total period of performance is 905 consecutive calendar days, split into a 365-day design phase and a 540-day construction phase. Rigorous qualification standards are mandated for the design-build team, requiring both the lead design and construction firms to have completed at least three projects involving large diameter pipes (36-inches or larger) and surge tanks with contract values exceeding 2 million dollars for utilities with a capacity of 5 mgd or greater. Key personnel, including the Design Manager and Construction Superintendent, must meet specific licensure and experience requirements, including Maryland Professional Engineer licenses where applicable. Acceptance is contingent upon successful hydrostatic testing of the standpipe for seven consecutive days and specific performance testing for transient conditions. A lump sum allowance of 50,000 dollars is provided for permit fees.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 324121
New
Arkansas Valley Conduit Spur and Delivery Lines – SRF Package 1
Solicitation # 2346058*02
The Arkansas Valley Conduit Spur and Delivery Lines project involves the construction of approximately 22 miles of potable water transmission and distribution pipeline and appurtenances serving eleven delivery lines in Otero County, Colorado. The overall scope includes the installation of 117,000 linear feet of 4-inch to 8-inch diameter pipeline using open cut and trenchless methods, the construction of various valve vaults and assemblies, and the installation of booster pump stations for the Patterson Valley, Newdale Grand Valley, and Valley Water lines. Work Package 1 specifically focuses on installing approximately 1,370 linear feet of water delivery pipelines for the City of Rocky Ford and the Eureka Water Company, including valves, appurtenances, and site restoration. Garney Companies, Inc. is requesting quotes for specialized services including asphalt and concrete paving, materials testing, surveying, environmental controls, traffic control, hydrovac potholing, and trucking. This CMAR contract is subject to stringent federal and state regulations, including the Davis-Bacon Act for prevailing wages and the Build America, Buy America and American Iron and Steel requirements. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Proposers must provide a surety letter, CDPHE Suspension and Debarment Certification, and specific DBE solicitation forms. Technical compliance requires adherence to ANSI/NSF/CAN 61 and 600 standards for drinking water components and various ASTM standards for coating and adhesion testing. Final acceptance is contingent upon a joint final inspection by the contractor and the owner, with the owner reserving the right to utilize an independent third party for quality control verification.
Asphalt Paving Mixture and Block Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS