Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

2E FABRICATION LLC Sanborn ND USA

UEI: SLED_21F73924E4856CC4

2E FABRICATION LLC Sanborn ND USA is a federal contractor, registered under UEI SLED_21F73924E4856CC4. It has been awarded $71,600 across 1 federal contract. Primary work spans All Other Miscellaneous Fabricated Metal Product Manufacturing. Top awarding agencies include W07V Endist St Paul.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_21F73924E4856CC4

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
W07V Endist St Paul$71.6K100%
Awards by NAICS
332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing$71.6K100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in 2E FABRICATION LLC Sanborn ND USA's top NAICS codes and agencies

NAICS: 333923
New
Federal
Notice of Intent to Limit Competition for Replacement Subassemblies for Lock Tow Haulage SystemsThe U.S. Army Corps of Engineers St. Paul District intends to award a sole source contract to TSE International, Inc. of Shreveport, LA, for the purchase of Tow Haulage Modular Subassemblies designed as direct replacements for existing Timberland Equipment Ltd. systems installed at locks used for commercial navigation between 2001 and 2005. The required components include two Hydraulic Tow Haulage Winches GP120-1-60EH, two Hydraulic Power Units HPU-1x60EM, and a Tow Haul Winch Control System comprising two control stations and an HPU Starter Panel, with an option to acquire a third set. These modules are commercial products customized to meet strict compatibility requirements with proprietary Timberland systems, ensuring seamless integration and continued technical support. Delivery is required within 32 weeks of award to the Lock and Dam No. 5A Warehouse in Fountain City, WI, where the subassemblies will be stored and deployed by Equipment Repair technicians to rapidly replace failed units at any lock in the district, enabling repairs to be completed within eight hours including transit time. The government asserts that TSE International, Inc. is the only domestic small business capable of supplying these subassemblies, and that no other manufacturer can produce compatible parts due to Timberland Equipment Ltd.’s proprietary engineering and exclusive distribution rights outside the United States. Installing components from any other source would result in loss of critical technical support and endanger system integrity, performance, and safety. This action is authorized under 10 U.S.C. 3204(a)(1) and implemented by RFO 6.103-1, permitting sole source procurement under the justification that only one source can meet the government’s needs. The solicitation will be issued under RFQ W912ES26QA087, and any interested party wishing to challenge the exclusivity claim must submit written objections to John Riederer at John.P.Riederer@usace.army.mil no later than 11:00 AM CDT on July 30, 2026. A formal justification for other than full and open competition will be published upon contract award, though the final contract number and dollar value remain undetermined.
W07V Endist St Paul

POSTED

about 20 hours ago

DEADLINE

in 2 days
View Details
NAICS: 332999
New
Federal
HANEL LEAN LIFT CABINET (SOLE SOURCE)This solicitation, designated SPMYM226Q7575, is a sole source procurement by DLA Maritime - Puget Sound for a Hanel Lean Lift Vertical Lift Module, model 2860-825/281/320/75/650/40, to be delivered and installed as a turn-key system at Naval Base Kitsap-Silverdale, Washington. The requirement includes not only the equipment itself but also full installation, connection to utilities, relocation of interfering electrical conduits and lighting, up to 100 feet of new conduit and wiring with an appropriate breaker, operational testing, and comprehensive personnel training. The contract further mandates the delivery of supplemental data packages including repair manuals, NRTL certification documentation, and warranty terms as defined in Exhibits A, B, and C, all subject to firm fixed pricing. Delivery is required by August 14, 2026, with FOB destination terms applying, and all shipments must comply with ASTM-D-3951 packaging standards, using heat-treated wood pallets where applicable, while strictly prohibiting materials such as asbestos, excelsior, and loose fill polystyrene. Marking of all containers must include the NSN or part number, noun nomenclature, quantity, contract number, and contractor information, with legibility ensured through any method. Proposals must be submitted electronically to Tricia Wintersteen at tricia.wintersteen@dla.mil and must include a completed and signed solicitation, manufacturer identification, country of origin, and precise lead time quoted FOB destination. Offers are evaluated as technically acceptable before price competitiveness is considered, with technical and past performance combined as approximately equal in weight to cost or price. The system must meet NFPA, NEMA, and ANSI standards, including NEMA-MG1 for motors and ASTM E-84-10m fire-retardant coating ratings. The contractor is responsible for all inspections and quality control, with final acceptance contingent upon satisfactory installation, testing, and government approval; non-conforming items may lead to rejection of the entire lot. A three-year warranty commencing at acceptance is required, and all warranty service must be performed by a factory-authorized distributor. Cybersecurity requirements mandate NIST SP 800-171 compliance and a current assessment unless the item is identified as COTS, in which case an exemption must be claimed and substantiated during bidding. Contractors must also comply with FAR and
DLA Maritime - Puget Sound

POSTED

about 20 hours ago

DEADLINE

in 10 days
View Details