Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

ABD ENGINEERING & DESIGN, INC.

UEI: GX97PPCKNQF9CAGE: 5V9U4

ABD ENGINEERING & DESIGN, INC. is a federal contractor, registered under UEI GX97PPCKNQF9 and CAGE code 5V9U4. It has been awarded $2,490 in federal contracts. Primary work spans Engineering Services. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

GX97PPCKNQF9

CAGE Code

5V9U4

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationWomen-Owned Small BusinessWoman-Owned Business

NAICS Codes

541990All Other Professional, Scientific, and Technical Services(Primary)

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

ABD ENGINEERING & DESIGN, INC. specializes in professional engineering and design services, delivering technical solutions rooted in architectural planning, systems integration, and technical documentation for public sector clients. The firm leverages its Women-Owned Small Business certification to ...

ABD ENGINEERING & DESIGN, INC. specializes in professional engineering and design services, delivering technical solutions rooted in architectural planning, systems integration, and technical documentation for public sector clients. The firm leverages its Women-Owned Small Business certification to provide agile, high-integrity design services that emphasize compliance, precision, and lifecycle management. Core capabilities include technical drafting, infrastructure planning, regulatory alignment, and design documentation for government facilities and mission-critical systems. Their expertise spans the full project lifecycle—from conceptual design through construction documentation—with a focus on meeting federal standards for safety, accessibility, and sustainability. The company differentiates itself through disciplined adherence to industry best practices and a commitment to quality assurance in deliverables. While award history is not available to confirm specific agency engagements, the contractor’s NAICS classification and business structure indicate a focus on supporting federal, state, and local government entities requiring technical design and engineering support. Their work likely intersects with facilities management, capital planning, and infrastructure modernization initiatives. The primary NAICS code 541990—“Other Professional, Scientific, and Technical Services”—reflects a broad scope of non-specialized engineering consulting, often encompassing multidisciplinary design support, technical analysis, and project coordination. The firm positions itself as a responsive, certified provider of flexible engineering services tailored to public sector needs without narrow vertical specialization. As a Women-Owned Small Business with a physical presence in Grand Rapids, Michigan, ABD ENGINEERING & DESIGN, INC. operates as a small, agile entity structured to deliver personalized, high-quality technical services. Its certification enhances its eligibility for set-aside contracts and underscores its commitment to diversity in federal contracting. The company maintains a regional footprint while serving national government markets through its certified status and technical proficiency.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with ABD ENGINEERING & DESIGN, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ABD ENGINEERING & DESIGN, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ABD ENGINEERING & DESIGN, INC.'s top NAICS codes and agencies

NAICS: 541330
New
SLED
Design, Installation, Maintenance and Repair of a Supervisory Control and Data Acquisition (SCADA) System.
Solicitation # 2026-007
The City of Zephyrhills is soliciting proposals for the design, installation, maintenance, and repair of a Supervisory Control and Data Acquisition (SCADA) system. The project focuses on standardizing the City's lift stations, potable water wells, and water tower locations using the Badger Meters (formerly SmartCover and Data Flow Systems) SCADA system. Key deliverables include 100% construction documents, estimated probable costs for civil design including permitting, and classroom-style training on basic SCADA software operation. The system must support various communication protocols, including MODBUS TCP. The contract features an initial three-year term with the option for two subsequent three-year renewals, with performance centered at 39421 South Avenue in Zephyrhills, Florida. The selection process is multi-stage, beginning with a written evaluation based on technical depth, firm qualifications, and team experience. A shortlist of three firms will be invited for interviews, where they will be evaluated on their methodology, problem-solving abilities, and communication. The top-ranked vendor will then enter negotiations. Applicants must provide comprehensive documentation, including organizational charts, resumes for key personnel, and several mandatory affidavits regarding public entity crimes, human trafficking, and labor coercion. Insurance requirements include comprehensive general liability and worker's compensation with minimum policy limits of $1,000,000 combined single limits. Payments will be processed via ACH-EFT.
Utilities

POSTED

1 day ago

DEADLINE

in 28 days
View Details