Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

ADVANCED CONCEPTS ENGINEERING DIVISION OF KI LIMITED LIABILITY COMPANY

UEI: FJLUMBYSM7Q9

ADVANCED CONCEPTS ENGINEERING DIVISION OF KI LIMITED LIABILITY COMPANY is a federal contractor, registered under UEI FJLUMBYSM7Q9. It has been awarded $41,565,928 in federal contracts. Primary work spans Engineering Services, Unknown NAICS, and Other NAICS codes (3 codes, <0.5% each). Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

FJLUMBYSM7Q9

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Advanced Concepts Engineering Division of KI Limited Liability Company specializes in high-level engineering services with a specific focus on space and naval warfare systems. Their technical expertise centers on providing specialized engineering support for complex defense systems, demonstrating a ...

Advanced Concepts Engineering Division of KI Limited Liability Company specializes in high-level engineering services with a specific focus on space and naval warfare systems. Their technical expertise centers on providing specialized engineering support for complex defense systems, demonstrating a capacity to manage long-term technical requirements and sustainment for critical military infrastructure. The company works almost exclusively with the Department of Defense, where they maintain a deep relationship providing engineering services. Their performance history indicates a strong specialization in supporting Space and Naval Warfare Systems Command initiatives. The firm's industry focus is primarily centered on Engineering Services under NAICS 541330. In practice, this manifests as a vertical specialization in defense-related engineering, positioning the company as a technical partner for advanced military systems and naval warfare technology. The company maintains a geographic presence in Colorado Springs, Colorado, positioning itself to support defense operations in the El Paso region.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

462

All time

Active

0

Currently performing

Completed

462

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency
Awards by NAICS
541330 - Engineering Services$40.2M96.7%
Awards by Agency Over Time
Awards by Place of Performance

Compete with ADVANCED CONCEPTS ENGINEERING DIVISION OF KI LIMITED LIABILITY COMPANY

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ADVANCED CONCEPTS ENGINEERING DIVISION OF KI LIMITED LIABILITY COMPANY

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ADVANCED CONCEPTS ENGINEERING DIVISION OF KI LIMITED LIABILITY COMPANY's top NAICS codes and agencies

NAICS: 541330
New
SLED
Tome Steps Restoration Project Architectural and Construction Document Development and Preconstruction Testing
Solicitation # 01-2026-TS
The Town of Port Deposit, Maryland, is soliciting professional Architectural and Engineering services for Phase I of the Tome Steps Restoration Project. This project focuses on document development and preconstruction testing for the stabilization and rehabilitation of the historic Tome Steps located at 64 South Main Street. The selected consultant will serve as the Engineer of Record, responsible for performing geotechnical and material testing, preparing a comprehensive structural engineering report on the stability of retaining walls and stairways, and developing a final architectural design package with complete construction drawings. All work must be supervised by Maryland-licensed architects and engineers and must comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties and Maryland Historical Trust requirements. This is a qualifications-based selection process where compensation will be negotiated after the most qualified firm is selected; therefore, technical proposals must be submitted without any fee or price information. Proposals will be evaluated based on technical approach, key staff experience, and knowledge of historic preservation requirements. The anticipated contract term is three years with a two-year option, and the project schedule is estimated at six to nine months. Technical proposals, including a required Maryland Bid/Proposal Affidavit and a certificate of insurance, are due by December 17, 2026. All project communications are managed via the Town website for registered consultants.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Lompoc Valley Transportation Needs Study
Solicitation # 2026-RFP-036
The Santa Barbara County Association of Governments (SBCAG) is soliciting proposals for the Lompoc Valley Transportation Needs Study (RFP 2026-RFP-036) to address critical safety concerns, traffic congestion, and infrastructure demands in the Lompoc Valley. The region has seen a significant increase in motor vehicle crashes and is facing growing transportation pressures due to the rapid expansion of private and military operations at Vandenberg Space Force Base. Funded by a Caltrans Sustainable Transportation Planning Grant, the study aims to identify multimodal improvements and develop actionable recommendations to inform the 2029 Regional Transportation Plan and a potential successor to Measure A. The scope of work includes analyzing existing conditions, performing demographic analysis, and executing a comprehensive public engagement process, which is expected to comprise approximately 30 percent of the project budget. The project is anticipated to span 18 months, beginning in February 2027 and concluding in August 2028, with a maximum consultant budget of 350,000 USD. The selected consultant team must provide specialized expertise in project management, technical modeling, and community engagement. Key deliverables include draft and final existing conditions reports and a final study detailing policies and strategies for system improvements. The contract requires strict adherence to federal and state regulations, including Title VI of the Civil Rights Act, the Americans with Disabilities Act, and California General Prevailing Wage rates. Proposals must be submitted electronically via the SBCAG e-Procurement Portal by December 4, 2026, with contract execution expected by January 21, 2027.
Planning

POSTED

about 13 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
SCDOT Less than 2000 ADT Pavement evaluation.
Solicitation # RFQ 120926
The South Carolina Department of Transportation (SCDOT) and the County Council of Beaufort County are seeking a qualified consultant under RFQ 120926 to perform a comprehensive pavement evaluation of the low-volume roadway network in Beaufort County. The scope of work involves conducting a full pavement condition survey of approximately 291 miles of paved roads with an Average Daily Traffic (ADT) of less than 2,000. This includes 101 centerline miles for roads with an ADT between 500 and 2,000, and 190 centerline miles for roads with an ADT below 500. The selected consultant must utilize accepted PCI methodologies for visual distress identification and follow SCDOT standard practices to evaluate maintenance and preservation treatment options. Key deliverables must be submitted within six months of the Notice to Proceed and include a GIS database containing roadway ratings and distress information, as well as a five-year fiscally constrained pavement maintenance and preservation program. The contract will be awarded using a qualifications-based selection process, where the highest-ranked offeror is selected and fees are subsequently negotiated. Evaluation factors include qualifications (25%), methodology (25%), and availability (15%), alongside project understanding and reporting capabilities. Proposals must be submitted electronically by December 17, 2026, and must remain firm for at least 90 days.
Engineering

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details