Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

BIDCO MARINE GROUP INC.

UEI: ZTTKPKZGVJX3CAGE: 3B371

BIDCO MARINE GROUP INC. is a federal contractor, registered under UEI ZTTKPKZGVJX3 and CAGE code 3B371. It has been awarded $19,858,154 across 32 federal contracts. Primary work spans Other Heavy and Civil Engineering Construction, All Other Miscellaneous Waste Management Services, and Other NAICS codes (6 codes, <0.5% each). Top awarding agencies include Department Of Defense, W072 Endist Buffalo, and Department Of Homeland Security.

Contact Information

Registration and classification details

Registration

UEI Code

ZTTKPKZGVJX3

CAGE Code

3B371

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S Corporation

NAICS Codes

237110Water and Sewer Line and Related Structures Construction
237990Other Heavy and Civil Engineering Construction(Primary)
336611Ship Building and Repairing
483113Coastal and Great Lakes Freight Transportation
488310Port and Harbor Operations
+1 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

BIDCO MARINE GROUP INC. specializes in heavy civil engineering and specialized environmental remediation projects, primarily supporting Department of Defense infrastructure needs. Their core capabilities include marine and coastal construction, invasive vegetation management, and ecological restorat...

BIDCO MARINE GROUP INC. specializes in heavy civil engineering and specialized environmental remediation projects, primarily supporting Department of Defense infrastructure needs. Their core capabilities include marine and coastal construction, invasive vegetation management, and ecological restoration work in sensitive aquatic environments. Recent projects such as the Emerald Shiner Passage Completion and brush removal on Bird Island Pier demonstrate expertise in habitat preservation, fish passage infrastructure, and shoreline stabilization using non-intrusive, environmentally compliant techniques. The contractor applies precision civil engineering methods to protect native species and maintain regulatory compliance in federally managed waterways, with a focus on low-impact construction and ecological mitigation strategies. The company maintains a consistent relationship with the Department of Defense, delivering mission-critical infrastructure enhancements in coastal and inland military installations. Their work supports defense readiness through environmental compliance, habitat continuity, and infrastructure resilience, often in constrained or ecologically sensitive zones where traditional construction methods are infeasible. BIDCO MARINE GROUP INC. operates primarily under NAICS 237990 for other heavy and civil engineering construction, which encompasses complex marine structures, erosion control, and aquatic habitat modification, alongside NAICS 562998 for miscellaneous waste management services—specifically targeted at vegetation and debris removal in protected natural areas. This dual focus positions them as a niche provider of environmentally integrated civil works, serving defense and natural resource stewardship missions. As a small business structured as a 2L entity based in Buffalo, NY, BIDCO MARINE GROUP INC. leverages regional expertise in Great Lakes and inland waterway systems. While currently without formal government certifications, their technical execution in ecologically sensitive environments and demonstrated success on DoD projects establish a strong footprint in defense environmental engineering markets.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with BIDCO MARINE GROUP INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for BIDCO MARINE GROUP INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in BIDCO MARINE GROUP INC.'s top NAICS codes and agencies

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

about 14 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-1
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-1, Furnace Creek Tank Metals Rehabilitation, through the PennBid online portal, with bids due by 2:00 PM on August 11, 2026. The project involves comprehensive rehabilitation of a water storage tank, including installation of a 4-inch drilled riser for static mixing, replacement of the tank ladder with safety cables, installation of a new 30-inch manway, replacement of the roof vent, and reconfiguration of the overflow discharge system to include an air gap, duckbill check valve, funnel-style reducer, and flapper valve above a concrete splashpad. All work must comply with applicable industry standards including ASTM, AWWA, OSHA, and SSPC, and materials must be delivered in original manufacturer packaging with bright-machined surfaces protected by heavy grease coatings. The contract is funded by a Penn VEST Drinking Water State Revolving Fund loan and is subject to all associated requirements. Full compliance with the Build America, Buy America Act and the American Iron and Steel provisions is mandatory, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States unless a formal waiver is obtained. Each bid must be accompanied by a 10% bid bond or certified check payable to the Authority, and failure to provide one will result in bid rejection. Bidders are encouraged to contact Chief Operator Dennis Miller to arrange a site visit. The Authority reserves the right to reject any or all bids and will select the most advantageous offer based on price and technical compliance. The work is performed at the project site in Berks County, Pennsylvania, with no specified contract type, line item pricing, or electronic invoicing system outlined. Payment administration, accounting codes, and contracting officer representative details are not defined in the solicitation. Proposal submission is strictly electronic via PennBid, with mandatory attachments including non-collusion affidavits, financial statements, surety documentation, and employment compliance certifications. No small business set-asides, unique entity identifiers, or CAGE codes are required, and no formal evaluation factors or weighted scoring criteria are specified, indicating an emphasis on lowest responsible bidder principles.
Berks County

POSTED

about 21 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

about 21 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

about 24 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. Managed by the US Army Corps of Engineers New York District with the New Jersey Department of Environmental Protection as the non-Federal sponsor, the project focuses on reducing storm damages from coastal erosion and flooding along Pews and Compton Creeks. The scope of work involves the design and construction of approximately 24.83 acres of restored tidal and freshwater wetlands and 8.76 acres of restored uplands. The estimated project magnitude is between $15 million and $30 million, and the resulting award will be a firm fixed-price contract. The procurement follows a best-value tradeoff process conducted in accordance with FAR 36.3. Phase One focuses on qualifying offerors based on specialized past experience and performance to shortlist up to five firms for Phase Two. Phase Two evaluations consider technical approach, management, and a small business participation plan, with these non-price factors combined being approximately equal in importance to price. Key requirements include achieving 85 percent aerial coverage of plantings in freshwater forested areas within three to five years post-construction. Offerors must maintain active SAM registration and provide bid guarantees, while the selected contractor must adhere to Davis-Bacon Act labor standards and NJDEP hazardous waste compliance.
W2SD Endist New York

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build procurement issued by the Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Sacramento County, California. This project is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated value between 1 million and 5 million dollars. The scope of work includes the removal and disposal of the existing crane, including the abatement of asbestos and other hazardous materials, as well as the design, fabrication, and installation of a new 30-ton bridge crane and its associated power supply. Additional requirements include a rail system survey with optional repair or replacement, the installation of a new crane automation control system, commissioning and load testing, and the provision of operation and maintenance training. The contract specifies a performance period of 600 calendar days from the notice to proceed, with work required to commence within 7 calendar days. Award decisions are based on the most advantageous proposal, evaluating technical approach, key personnel, and price reasonableness. Contractors must adhere to strict technical standards, including ISO-9001 certification for manufacturing facilities and seismic certification for VFD assemblies. Compliance with the Davis-Bacon Act and various safety and electrical standards such as NFPA 70 and IEEE is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at 2,900 dollars per calendar day.
Mp-Regional Office

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
HALEIWA SMALL BOAT HARBOR MAINTENANCE DREDGING AND REVETTED MOLE REPAIR, HALEIWA, OAHU, HAWAII
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers, Honolulu District, is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii. This firm-fixed-price construction contract, under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The project is scheduled for completion within 200 to 240 calendar days from the notice to proceed, though specific exclusionary periods for tree cutting and in-water work during coral spawning and full moons in June and July are enforced. Bidders must provide a bid guarantee and are required to submit a comprehensive offer package including SF 1442, the CLIN schedule, and representations and certifications. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The government provides a 10 percent price evaluation preference for HUBZone small business concerns. Compliance with the Davis-Bacon Act, EM 385-1-1 safety standards, and various ASTM specifications for aggregate and rock testing is mandatory. Bids must be submitted in sealed physical packages to the contracting office at Fort Shafter, Hawaii, as electronic submissions are not permitted.
W2SN Endist Honolulu

POSTED

1 day ago

DEADLINE

in 4 days
View Details