Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Catworks Construction 22105 B NE 72ND Ave. Battleground WA 98604 USA

UEI: SLED_A53D9B28A5D8761B

Catworks Construction 22105 B NE 72ND Ave. Battleground WA 98604 USA is a federal contractor, registered under UEI SLED_A53D9B28A5D8761B. It has been awarded $629,357 across 1 federal contract. Primary work spans Power and Communication Line and Related Structures Construction. Top awarding agencies include Gifford Pinchot National Forest.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_A53D9B28A5D8761B

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Gifford Pinchot National Forest$629.4K100%
Awards by NAICS
237130 - Power and Communication Line and Related Structures Construction$629.4K100%
Awards by Agency Over Time
Awards by Place of Performance

Open opportunities in Catworks Construction 22105 B NE 72ND Ave. Battleground WA 98604 USA's top NAICS codes and agencies

NAICS: 237130
New
Federal
SP-364 Replace Underground Cabling in SP Area
Solicitation # N4008526R0249
Solicitation N4008526R0249 is an 8(a) set-aside Indefinite Delivery/Indefinite Quantity contract issued by the Naval Facilities Engineering Systems Command Mid-Atlantic. The project, titled SP-364 Replace Underground Cabling in SP Area, involves replacing underground electrical cabling from SW 111 at SP-35 to manholes serving buildings SP-254, 257, 362, 364, and 366, as well as installing above-ground junction boxes near SP-254 and 257. Performance will take place at Naval Station Norfolk, Virginia, with a total completion period of 330 calendar days from the date of the task order award. Award will be granted to the eligible offeror submitting the lowest price based on the total sum of Contract Line Item 0001AA and the extensions of items 0001AB through 0001AE. The contractor must provide a project superintendent with at least 10 years of construction experience, including 5 years on projects of similar complexity, and a site-based Quality Control Manager. Key requirements include adherence to USACE EM 385-1-1 safety standards, the submission of a Government-approved Salvage Plan, and compliance with NETA ATS and various ASTM standards for electrical and materials testing. Invoicing is managed via Wide Area Work Flow (WAWF) using specific NAVFAC forms, and payments are governed by FAR 52.232-5 and FAR 52.232-27. Proposals must be submitted electronically through the PIEE Solicitation Module by September 7, 2026, at 1400 EDT.
Navfacsyscom Mid-Atlantic

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 237130
New
Federal
Feeder 7 Repair
Solicitation # W50S8526BA007
The U.S. Air Force, through the W7NF Uspfo Activity Miang 127, is preparing to issue an Invitation for Bids under solicitation number W50S85-26-B-A007 for the construction of Electrical Repair Feeder 7 at Selfridge Air National Guard Base in Michigan. This is a firm fixed-price contract entirely set aside for small businesses under FAR 19.5, with the NAICS code 237130 for Power and Communication Line and Related Structures, and a size standard of $45 million. The project requires the contractor to furnish all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete approximately 5,706 feet of new underground and overhead conductors, demolition of existing cables, full-depth pavement repairs, mill/overlay, crack repairs, and associated site restoration work along Perimeter Road and Jefferson Ave. All work must strictly adhere to Drawings VGLZ262005 Repair Feeder #7, the Statement of Work, and project specifications, with any conflicts resolved in favor of the more stringent or higher-quality requirement. A Macomb County Soil Erosion Permit is mandatory and the responsibility of the contractor to obtain and pay for. The contract period is 240 calendar days from notice to proceed, inclusive of inspection and punch list items. The solicitation is being issued under FAR Part 14 procedures, with award determined solely on price and price-related factors. The prime contractor must comply with limitations on subcontracting, prohibiting payments exceeding 85 percent of the contract value (excluding materials) to non-similarly situated subcontractors under FAR clause 52.219-14(e)(3) with deviation 2021-O0008. All bidders must be registered in SAM.gov, and inquiries must be submitted in writing via email to TSgt Jack Garrettson. The formal solicitation is tentatively scheduled for release on July 13, 2026, with a pre-bid conference on July 22, 2026, and bid opening anticipated on or about August 31, 2026. The estimated contract value ranges between $1 million and $5 million, with the final amount to be determined upon bid submission.
W7NF Uspfo Activity Miang 127

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
SLED
Amendment to Marine Group Boat Works Rooftop Solar, Parking Lot, and Fence Reconfiguration Project for Easement Agreement to San Diego Gas & Electric CompanyThis easement agreement between the San Diego Unified Port District and San Diego Gas and Electric provides for the use of approximately 1,631 square feet of land in Chula Vista, California. The agreement facilitates the installation of a new 12kV-480V transformer, a 480V main meter, and underground electrical framework to support the Marine Group Boat Works Rooftop Solar, Parking Lot, and Fence Reconfiguration Project. This infrastructure is essential for connecting the facility to an existing terminator near G Street, supporting sustainability efforts without expanding the tenant leasehold boundaries or existing land use. The project is divided into three segments involving the installation of conduits under a bike path, the placement of a precast concrete pad and transformer, and the connection of the transformer to the main meter gear. Construction is scheduled for fall 2026 and is expected to take approximately two days, with work primarily conducted overnight from 8:00 p.m. to 6:00 a.m. to minimize pedestrian and cyclist disruptions. The project is categorically exempt under CEQA Guidelines and is expected to have minimal environmental impact, with the grantee assuming responsibility for compliance with all applicable laws regarding hazardous materials and stormwater management.
San Diego Unified Port District

POSTED

2 days ago

DEADLINE

N/A
View Details