Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CENTRAL PUMP COMPANY, LLC

UEI: CNB3XBW744R5CAGE: 4WDQ9

CENTRAL PUMP COMPANY, LLC is a federal contractor, registered under UEI CNB3XBW744R5 and CAGE code 4WDQ9. It has been awarded $687,951 in federal contracts. Primary work spans Facilities Support Services, Water and Sewer Line and Related Structures Construction, and Measuring, Dispensing, and Other Pumping Equipment Manufacturing. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

CNB3XBW744R5

CAGE Code

4WDQ9

Entity Structure

Sole Proprietorship

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationWoman-Owned Business

NAICS Codes

115113Crop Harvesting, Primarily by Machine
115116Farm Management Services
221310Water Supply and Irrigation Systems(Primary)
333111Farm Machinery and Equipment Manufacturing
333914Measuring, Dispensing, and Other Pumping Equipment Manufacturing
+4 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Central Pump Company, LLC specializes in the installation, maintenance, and replacement of critical pumping and dewatering systems for federal infrastructure, with deep expertise in facilities support and specialized pumping equipment manufacturing. The company delivers end-to-end solutions for wate...

Central Pump Company, LLC specializes in the installation, maintenance, and replacement of critical pumping and dewatering systems for federal infrastructure, with deep expertise in facilities support and specialized pumping equipment manufacturing. The company delivers end-to-end solutions for water management systems, including dewatering well operations, influent pump replacements, and long-term maintenance contracts for remote or mission-critical sites. Their technical proficiency spans mechanical pump systems, hydraulic control assemblies, and corrosion-resistant component integration, ensuring reliable performance in harsh environmental conditions. A key differentiator is their ability to combine field-service agility with precision equipment manufacturing, allowing them to respond rapidly to operational failures while maintaining compliance with federal engineering standards for water infrastructure. The contractor maintains a strong, recurring relationship with the Department of the Interior, providing mission-critical water resource management services across federal lands and facilities. Their work supports hydrological monitoring, groundwater control, and infrastructure resilience initiatives, particularly in arid and high-elevation regions. This consistent engagement suggests a trusted partnership built on technical reliability and mission alignment with the Interior’s stewardship responsibilities for water and land resources. Central Pump Company’s primary industry focus lies in Facilities Support Services and the manufacturing of measuring, dispensing, and pumping equipment—two complementary domains that enable end-to-end water system lifecycle management. They position themselves as a niche provider for federal agencies requiring integrated solutions that bridge operational maintenance with custom-engineered pump systems, particularly in water infrastructure and environmental remediation contexts. As a Woman-Owned Business certified under federal programs, the company operates from Center, Colorado, serving federal clients nationwide with a lean, agile structure optimized for rapid deployment and field responsiveness. Their certifications and geographic positioning reinforce their role as a trusted small business partner in federal water infrastructure markets.

Key Performance Metrics

Awards Count

9

All time

Active

1

Currently performing

Completed

8

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by Agency Over Time
Awards by Place of Performance

Compete with CENTRAL PUMP COMPANY, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for CENTRAL PUMP COMPANY, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in CENTRAL PUMP COMPANY, LLC's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details
NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include the replacement of friction discs, bearings, oil seals, and O-rings, as well as resurfacing the flywheel and replacing hydraulic pipes and filters as necessary. All work must adhere to manufacturer specifications, and the final acceptance is contingent upon the Facility Maintenance Department verifying proper clutch engagement and PTO operation under load. This is a fee-for-service solicitation with a lump sum award based on best value. Interested offerors must submit a bid sheet, a completed supplier packet including a W-9 and self-certification form, and proof of insurance by November 3, 2026. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone concerns, and requires compliance with various Federal Acquisition Regulations, including Service Contract Labor Standards and Buy American provisions. Proposals must include an itemized breakdown of costs and warranty information for parts and labor.
Earle C. Clements Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 4 hours
View Details