Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

ECODYNAMICS INC

UEI: DA9QQBMQLHJ5CAGE: 5ZZ48

ECODYNAMICS INC is a federal contractor, registered under UEI DA9QQBMQLHJ5 and CAGE code 5ZZ48. It has been awarded $1,697,101 in federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction, Drilling Oil and Gas Wells, and Support Activities for Oil and Gas Operations. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

DA9QQBMQLHJ5

CAGE Code

5ZZ48

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationManufacturer of Goods

NAICS Codes

332312Fabricated Structural Metal Manufacturing(Primary)
332322Sheet Metal Work Manufacturing
332999All Other Miscellaneous Fabricated Metal Product Manufacturing

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Ecodynamics Inc. specializes in the rehabilitation and assessment of critical water and energy infrastructure in sensitive natural environments, with a focus on well systems and related structures at federal wildlife refuges. Their technical expertise includes well rehabilitation, hydraulic system e...

Ecodynamics Inc. specializes in the rehabilitation and assessment of critical water and energy infrastructure in sensitive natural environments, with a focus on well systems and related structures at federal wildlife refuges. Their technical expertise includes well rehabilitation, hydraulic system evaluation, and environmental compliance for oil and gas support operations in protected areas. The company demonstrates a strong command of field-based engineering practices for aging well infrastructure, including casing inspection, pump system upgrades, and contamination mitigation—often in remote, ecologically constrained locations. Their work emphasizes minimizing environmental impact while ensuring operational integrity, making them uniquely suited for projects requiring coordination between energy infrastructure needs and conservation mandates. Ecodynamics has established a consistent relationship with the Department of the Interior, delivering mission-critical infrastructure services primarily at National Wildlife Refuges. Their engagements involve direct support for resource management objectives, including the maintenance of water supply systems that sustain wildlife habitats while complying with federal environmental regulations. This recurring partnership suggests a trusted, long-term role in supporting Interior’s stewardship responsibilities through technical field services rather than broad-scale construction. The contractor’s primary industry focus lies in Water and Sewer Line and Related Structures Construction (NAICS 237110) and Support Activities for Oil and Gas Operations (NAICS 213112). In practice, this translates to specialized field services for subsurface infrastructure—particularly well systems—that serve both operational and ecological functions. Their market positioning is niche, targeting federal land management agencies that require precision, environmental sensitivity, and regulatory adherence in remote infrastructure projects. Ecodynamics Inc. is a small, locally based firm headquartered in Monte Vista, Colorado, operating as a 2L entity with no federal certifications on record. Their geographic proximity to key Department of the Interior sites enables rapid mobilization and site-specific knowledge, reinforcing their role as a responsive, on-the-ground contractor for mission-critical infrastructure in the Western U.S. public lands.

Key Performance Metrics

Awards Count

18

All time

Active

0

Currently performing

Completed

18

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by Agency Over Time
Awards by Place of Performance

Compete with ECODYNAMICS INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ECODYNAMICS INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ECODYNAMICS INC's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive improvements to the Morgans Branch Pumping Station. Key station upgrades entail the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and supporting site improvements such as stormwater facilities, fencing, and landscaping. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must adhere to strict submission requirements, including the use of prescribed EJCDC forms and the provision of bid security. The project mandates specific socioeconomic goals, including a 10 percent combined MBE/WBE participation goal for the State of North Carolina and separate EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Performance and payment bonds are required, and insurance providers must maintain an A.M. Best rating of A-VII or better. Contract administration is governed by EJCDC standard general and supplementary conditions. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The project includes liquidated damages of 1,000 dollars per day for delays in reaching both substantial and final completion. Quality assurance is managed through site inspections by the Engineer and independent testing laboratories, with specific adherence to NEMA and ASTM standards for motors and masonry.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 18 days
View Details
NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting lump sum bids for the comprehensive clutch replacement of a Kubota M8200 tractor at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all labor, transportation, materials, tools, and equipment to disassemble the tractor, inspect components, and replace the clutch friction discs, plates, bearings, oil seals, O-rings, and the clutch release spring. Additional requirements include resurfacing the flywheel, replacing necessary hydraulic pipes and flanges, changing the oil filter, and verifying the proper operation of the PTO clutch assembly in accordance with manufacturer specifications and industry practices. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Interested offerors must submit a bid sheet, a completed supplier packet including IRS Form W-9 and self-certification, and proof of insurance by 3:00 PM CST on November 3, 2026. Award will be based on best value. The contract mandates compliance with various Federal Acquisition Regulations, including Buy American and Combating Trafficking in Persons, and adheres to Service Contract Act wage determinations for Kentucky. Contractors must also maintain strict information security safeguards and provide a Unique Entity Identification number via sam.gov.
Earle C. Clements Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation or replacement of valves, piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. The project also encompasses the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Requested services and supplies specifically include lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and bypass pumping. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Submissions must utilize Garney Standard Purchase Order and Subcontract documents, and any exceptions must be provided as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with two smaller units, installing a standby generator, and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. The solicitation strongly encourages participation from small, minority-owned, disabled, veteran-owned, and women-owned businesses, offering assistance with bonding, credit lines, and insurance where necessary. Bids are due by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A; K-27-2470-DBB-3-C
Solicitation # BP26019
The City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A (Contract K-27-2470-DBB-3-C) is a construction project with an estimated cost of 35.1 million dollars. The scope of work is divided into two primary components: the installation of approximately 5,216 linear feet of new sewer pipe, including groundwater dewatering, bypass pumping, and trenchless work, and the replacement of approximately 5,886 linear feet of existing 6, 8, 12, and 16 inch AC water mains and associated appurtenances. Additional requirements include site restoration, traffic control, signal loop replacement, curb ramp installation, and a comprehensive maintenance program consisting of a 120-day Plant Establishment Period followed by a 25-month Long Term Maintenance and Monitoring Agreement. The project has a total completion time of 550 working days and is subject to full and open competition. To be eligible for award, the prime contractor must possess licensing classification A and submit a Letter of Assent and a Jobs Coordinator Designation Form. This is a prevailing wage project governed by a Project Labor Agreement. Bidders must demonstrate Good Faith Efforts regarding Disadvantaged Business Enterprise (DBE) participation and provide documentation in searchable PDF format. Bids are due to the City by October 28, 2026, with subcontractor proposals requested by Burtech Pipeline Incorporated by October 26, 2026.
BURTECH PIPELIINE INCORPORATED

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details