Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

KING CONSTRUCTION, INC

UEI: LZ9QFCJD1W48CAGE: 5FP70

KING CONSTRUCTION, INC is a federal contractor, registered under UEI LZ9QFCJD1W48 and CAGE code 5FP70. It has been awarded $1,456,260 in federal contracts. Primary work spans Other Heavy and Civil Engineering Construction, Unknown NAICS, and Facilities Support Services. Top awarding agencies include Department Of Agriculture, Small Business Administration, and Department Of Defense (dod).

Contact Information

Registration and classification details

Registration

UEI Code

LZ9QFCJD1W48

CAGE Code

5FP70

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationVeteran-Owned Business

NAICS Codes

237110Water and Sewer Line and Related Structures Construction(Primary)
237120Oil and Gas Pipeline and Related Structures Construction
237130Power and Communication Line and Related Structures Construction
237210Land Subdivision
237310Highway, Street, and Bridge Construction
+5 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

KING CONSTRUCTION, INC specializes in civil infrastructure construction services, primarily focused on heavy and civil engineering projects under NAICS 237110. The firm delivers end-to-end construction solutions including earthwork, grading, drainage systems, roadways, and site development for publi...

KING CONSTRUCTION, INC specializes in civil infrastructure construction services, primarily focused on heavy and civil engineering projects under NAICS 237110. The firm delivers end-to-end construction solutions including earthwork, grading, drainage systems, roadways, and site development for public infrastructure. Their technical expertise encompasses compliance with federal and state engineering standards, utility coordination, erosion and sediment control, and construction management using industry-standard project delivery methods. The company demonstrates proficiency in managing complex site logistics, heavy equipment operations, and subsurface utility installation, with an emphasis on safety protocols and regulatory adherence. While no specific award history is available to detail project scope, their core competency lies in executing large-scale public works projects requiring precision in earthmoving, grading, and infrastructure integration. No agency relationships can be identified due to insufficient award data. The absence of recent contract records prevents characterization of institutional partnerships or recurring project types with federal, state, or local entities. The contractor’s primary industry focus is heavy and civil engineering construction, which involves the design and build of public infrastructure such as highways, bridges, water conveyance systems, and land development sites. This vertical requires deep familiarity with DOT specifications, ASTM standards, and environmental permitting frameworks. KING CONSTRUCTION, INC positions itself as a field-execution-focused contractor capable of delivering technically complex civil works under tight operational constraints. The company is structured as a small business (2L entity) based in Fernley, Nevada, with no government certifications on record. Its geographic presence is localized to the Western U.S., with operations likely centered on regional infrastructure needs. Without certifications or federal contract history, the firm operates as a regional player in the civil construction market, relying on direct contracting and local procurement channels.

Key Performance Metrics

Awards Count

6

All time

Active

0

Currently performing

Completed

6

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with KING CONSTRUCTION, INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for KING CONSTRUCTION, INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in KING CONSTRUCTION, INC's top NAICS codes and agencies

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer installation and site development. Key technical requirements include the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe in 18 and 24 inch diameters, as well as the construction of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include trenchless crossings with launch and receiving shafts, outfall work, and the maintenance of flows and bypass. Site preparation requirements encompass the clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the removal of approximately 30 select trees. Project deliverables include completed sanitary sewer networks, a functional CSO regulator, and the implementation of a Stormwater Pollution Prevention Plan (SWPPP). Contractors are also required to provide geotechnical instrumentation and monitoring and must maintain specific railroad insurance for applicable work areas. The bid schedule includes various general base bid items, sewer installation components, and contingent items to ensure full project completion.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements encompass site improvements, stormwater facilities, fencing, and grading. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a bid bond, evidence of authority to do business in the state, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project is governed by EJCDC standard forms and requires performance and payment bonds, as well as proof of insurance. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, with payments processed monthly via an Application for Payment reviewed by the engineer. Work must comply with specific industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, a standby generator, site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed. WG Construction is specifically seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder registered in the Commonwealth of Virginia. Bidders must provide a bid bond or certified check, and the successful contractor must furnish performance and payment bonds equal to 100 percent of the contract amount. Compliance with the Davis-Bacon Act, American Iron and Steel requirements, and various EEO and non-discrimination executive orders is mandatory. Evaluation factors include bidder qualifications, business history, a minimum of three similar project references, and detailed quality and timeliness management plans. Payment terms are generally 30 days after invoice or delivery.
WG Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, modifications to sluice and slide gates, and the replacement of motor control center components and associated electrical and instrumentation systems. Other key deliverables include lead abatement, metals fabrication, painting, coatings, trucking, hauling, and the installation of access hatches and platforms. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, with the final bid date set for November 18, 2026. Interested parties must review the Garney Standard PO and Subcontract Forms and submit any exceptions as redlines along with their quotes.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details