Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

MCL-MRK VII LLC

UEI: GP66DEVNP2A1CAGE: 0QUS6

MCL-MRK VII LLC is a federal contractor, registered under UEI GP66DEVNP2A1 and CAGE code 0QUS6. It has been awarded $19,331,628 in federal contracts. Primary work spans Commercial and Institutional Building Construction. Top awarding agencies include Department Of Veterans Affairs and Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

GP66DEVNP2A1

CAGE Code

0QUS6

Entity Structure

Partnership or Limited Liability Partnership

Established

N/A

Business Classifications

For Profit OrganizationLimited Liability CompanyService-Disabled Veteran-Owned BusinessService-Disabled Veteran-Owned Business Joint VentureSmall Business Joint VentureVeteran-Owned Business

NAICS Codes

236220Commercial and Institutional Building Construction(Primary)
238220Plumbing, Heating, and Air-Conditioning Contractors

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

MCL-MRK VII LLC specializes in the construction and renovation of commercial and institutional healthcare facilities, with demonstrated expertise in delivering mission-critical infrastructure for veterans’ medical services. Their core capabilities include the design-build execution of sterile proces...

MCL-MRK VII LLC specializes in the construction and renovation of commercial and institutional healthcare facilities, with demonstrated expertise in delivering mission-critical infrastructure for veterans’ medical services. Their core capabilities include the design-build execution of sterile processing departments, surgical support spaces, and other high-compliance clinical environments requiring strict adherence to infection control standards, ANSI/ASHRAE/ASSE 6000 protocols, and CDC guidelines. The contractor brings specialized knowledge in phased construction within active healthcare settings, ensuring continuity of operations while integrating advanced HVAC systems, sterilization equipment, and medical gas infrastructure. Their technical proficiency extends to coordination with clinical stakeholders, adherence to FGI Guidelines, and compliance with VA Facility Standards, positioning them as a trusted partner for sensitive healthcare construction projects. The company has established a focused relationship with the Department of Veterans Affairs, delivering specialized construction services tailored to VA Medical Center requirements. Their work supports VA’s broader mission to modernize veteran healthcare infrastructure through safe, efficient, and code-compliant facility upgrades, particularly in clinical support areas critical to patient safety and operational readiness. MCL-MRK VII LLC’s primary industry focus is on commercial and institutional building construction, specifically within the federal healthcare vertical. They concentrate on high-acuity medical environments where precision, regulatory compliance, and minimal disruption are paramount, distinguishing themselves in the niche market of VA facility modernization. As a Service-Disabled Veteran-Owned Business Joint Venture, the company leverages its SDVOSB certification to serve federal procurement priorities while maintaining a presence in La Vista, Nebraska. Their structure and certifications align with government initiatives to increase contracting opportunities for veteran-owned firms, reinforcing their credibility and mission alignment within the federal construction sector.

Key Performance Metrics

Awards Count

7

All time

Active

3

Currently performing

Completed

4

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with MCL-MRK VII LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for MCL-MRK VII LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in MCL-MRK VII LLC's top NAICS codes and agencies

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation for DBE subcontractors issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency. Located in California, specifically within the Riverside or Los Angeles project areas, the solicitation is designated as a set-aside for Disadvantaged Business Enterprises. The response deadline is November 4, 2026, with the solicitation having been posted on October 25, 2026. To ensure project financing and bid responsiveness, contractors must strictly adhere to mandatory Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if proof of GFE #2, requiring online solicitation postings for 30 consecutive days and a one-day print newspaper posting, and GFE #5, requiring the utilization of the Small Business Administration and Minority Business Development Agency, are not submitted with the bid package. Additionally, documentation for GFE #1 regarding DBE outreach may be submitted up to three business days after the bid closing. Prime contractors are further required to ensure that any subcontractors they award also follow these GFE steps.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business entities. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted dormitory rooms, offices, and medical areas across three floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and electrical and plumbing repairs to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026, including a detailed cost breakdown, a 90-day bid guarantee, and proof of a Massachusetts Contractor's License. Compliance with the Davis-Bacon Act, NFPA-101 life safety codes, ADA, OSHA, and EPA regulations is mandatory. Final acceptance requires a one-year workmanship warranty, a 20-year product warranty for LVP flooring, and a release of liens from all subcontractors.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site preparation such as clearing, rock excavation, and grading, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, intrusion detection systems, and lightning protection, along with the demolition of 18 existing magazines and two buildings. The contract covers a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, electrical, plumbing, and mechanical work. Infrastructure improvements involve the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas, with specific requirements for wetland mitigation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari by the response deadline of October 31, 2026, to receive bid invitations and access necessary documentation.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ballasts, replacing variable air volume systems, and installing new signage and safety stair treads throughout the facility. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The contractor is required to provide performance and payment bonds equal to 100 percent of the contract price and must adhere to strict federal standards, including ADA accessibility guidelines, Buy American requirements, and Davis-Bacon wage determinations. All proposals must be submitted electronically to the contracting officer by November 9, 2026, organized into separate price and technical volumes.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, evaluated by combining the costs for building renovation and paving removal and replacement. Bidders must adhere to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Technical compliance is mandatory across various standards, including ADA accessibility, MIL-STD-101 for piping identification, and specific cybersecurity requirements for facility-related control systems. Invoicing must be processed through Wide Area Work Flow and requires certification by a Quality Control Manager. Final acceptance is contingent upon on-site inspections and functional testing of fire protection and life safety systems.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 29 days
View Details