Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

NAVAL ENGINEERING SUPPORT INC

NAVAL ENGINEERING SUPPORT INC is a federal contractor, registered under UEI LCYTE2L5JEP4 and CAGE code 8LHZ1. It has been awarded $46,364,904 in federal contracts. Primary work spans Ship Building and Repairing, Engineering Services, and Other NAICS codes (1 codes, <0.5% each). Top awarding agencies include Department Of Defense (dod) and Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

LCYTE2L5JEP4

CAGE Code

8LHZ1

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationHispanic American OwnedMinority-Owned BusinessSelf Certified Small Disadvantaged Business

NAICS Codes

336611Ship Building and Repairing(Primary)
811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Naval Engineering Support Inc. specializes in the repair, maintenance, and material support of commercial and industrial machinery used in defense operations, with a focused expertise in corrosion treatment and preventive maintenance of heavy equipment. Their technical capabilities include surface p...

Naval Engineering Support Inc. specializes in the repair, maintenance, and material support of commercial and industrial machinery used in defense operations, with a focused expertise in corrosion treatment and preventive maintenance of heavy equipment. Their technical capabilities include surface preparation, protective coating application, and lifecycle management of non-automotive, non-electronic machinery such as forklifts and dive boats—critical assets in naval and expeditionary environments. The company applies industry-standard metallurgical and anti-corrosion techniques to extend equipment service life under harsh maritime and high-salinity conditions, demonstrating proficiency in materials science and mechanical systems sustainment. Their work emphasizes mission readiness through proactive maintenance protocols tailored to DoD operational demands. Naval Engineering Support Inc. has established a consistent relationship with the Department of Defense, delivering mission-critical maintenance services for specialized equipment used in naval logistics and underwater operations. Their engagements involve direct support of fleet sustainment activities, ensuring operational continuity for assets that lack commercial off-the-shelf replacements. The contractor’s ability to respond rapidly to field-level maintenance requirements suggests a deep understanding of military supply chains and equipment deployment cycles. The company operates primarily under NAICS 811310, which encompasses the repair and maintenance of industrial machinery essential to defense infrastructure. This positions them as a niche provider in the defense logistics support sector, specializing in mechanical asset integrity rather than electronics or vehicle systems. Their market focus is on sustaining non-electronic, high-utilization equipment critical to base operations and maritime missions. As a small business structured as a 2L entity based in National City, California, Naval Engineering Support Inc. leverages its proximity to West Coast naval facilities to deliver responsive, on-site technical services. While currently holding no formal government certifications, their operational footprint and specialized skill set align them with DoD’s broader sustainment and readiness objectives in the industrial maintenance domain.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

148

All time

Active

1

Currently performing

Completed

146

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency
Awards by NAICS
336611 - Ship Building and Repairing$45.9M99.1%541330 - Engineering Services$354.0K0.8%
Awards by Agency Over Time
Awards by Place of Performance

Compete with NAVAL ENGINEERING SUPPORT INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for NAVAL ENGINEERING SUPPORT INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in NAVAL ENGINEERING SUPPORT INC's top NAICS codes and agencies

NAICS: 541330
New
SLED
Design Services For Water Well No. 30 Rehabilitation
Solicitation # UH26004
The City of Stockton is soliciting professional engineering services for the Water Well No. 30 Rehabilitation Project located in Lodi, California. The primary objective of this project is to ensure that water quality meets all Title 22 drinking water quality standards while maintaining a well capacity of approximately 2,000 gallons per minute. The scope of work includes the development of a Preliminary Design Report that identifies treatment options for 1,2,3-TCP and provides a 10-year capital and O&M cost analysis, the creation of full construction documents, the preparation of water system permit amendment applications, and the provision of engineering support during the bidding process. Proposals are due by December 3, 2026, and must be submitted to the Office of the City Clerk in Stockton. The submission must include one original with wet ink signatures, three copies, and a USB containing an electronic version, with the fee proposal submitted in a separate sealed envelope and a passcode-protected file on the USB. The City will use a ranking process to select the most qualified consultant, evaluating proposals based on technical merit before reviewing cost proposals. Selected contractors must comply with prevailing wage requirements, ADA standards, and non-discrimination laws, and must provide a Certification of Financial Condition to ensure financial soundness and tax compliance. Payment for services is processed within 30 days of receiving an approved invoice.
City of Stockton

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
Thornton Road And Don Avenue Sewer Pump Stations Rehabilitation
Solicitation # UW13009
The City of Stockton Municipal Utilities Department is soliciting design services for the rehabilitation of the Thornton Road and Don Avenue Sewer Pump Stations. The project aims to improve system reliability and minimize failures by updating outdated electrical and mechanical systems and addressing operational concerns. The scope of work includes performing investigations, hydraulic, mechanical, and electrical evaluations, and developing comprehensive rehabilitation recommendations. Key tasks are divided into project management, existing conditions investigation and preliminary engineering, and the creation of design and bid documents. Award selection is based on the firm best qualified for the project, with specific scoring preferences granted to local businesses: 5% for City of Stockton businesses, 2% for San Joaquin County businesses, and 1% for subconsultants within the city. Proposals must adhere to strict formatting guidelines, including a 40-page total limit and a 30-page limit for the body, with a minimum 10-point font. Technical proposals must be submitted on white paper with wet ink signatures, while proposal fees and the list of tasks must be submitted in a separate sealed envelope. Contract administration requires that invoices include a description of work, time spent, and a City reference number, with payments processed within 30 days of receipt subject to City Council appropriations. The contractor is responsible for maintaining safety, implementing dust control, and preparing a Stormwater Pollution Prevention Plan to comply with state and local regulations. Additionally, the successful proponent must provide a certification of financial condition and adhere to prevailing wage and non-discrimination requirements.
City of Stockton

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
5671 Medical Center La Jolla (MCLJ) Outpatient Pavillion Geotechnical Testing And Inspection Services
Solicitation # 20261113029
The University of California San Diego is soliciting a Geotechnical Testing and Inspection Services firm for the 5671 Medical Center La Jolla Outpatient Pavilion. This project involves the construction of an approximately 180,000 gross square foot HCAi/OSHPD 3 compliant facility designed to LEED Gold standards. The selected firm will be responsible for geotechnical testing and inspection across various construction phases, including earthwork, shoring, foundations, flatwork, utility installation, and site work. Key deliverables include the review of construction documentation for site excavation and grading, as well as verifying that all earthwork and backfill align with approved drawings and geotechnical recommendations. Design review services may begin as early as December 2026, with the project breaking ground in January 2027 and reaching completion by September 2029. Selection is based on proven capabilities, staff qualifications, and a requirement that the firm and its testing lab be located within 30 miles of the project site. Applicants must submit a proposal limited to 25 pages, including a letter of interest, a response to selection criteria, and a fee estimate based on current prevailing wage criteria and a 40-hour work week. The University will only contract with a single executive design professional entity, excluding joint ventures or associations. All services will be governed by the standard University Professional Services Agreement, and shortlisted firms must sign a Statement of Understanding regarding these terms. Proposals are due by November 18, 2026, and the selection process includes a mandatory interview.
University of California San Diego

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0026574 - GRADE WIDENING & INTERSECTION IMPROVEMENTS
Solicitation # CON0026574
Alberta Transportation and Economic Corridors has issued Request for Proposal CON0026574 for engineering consultant services to perform grade widening and intersection improvements at the Stoney Trail and 52 Street SE interchange. The scope of work is divided into two primary locations: the design of a lane addition on the eastbound Highway 201 exit lane to eliminate bottlenecks and the implementation of a dual signalized right turn on northbound 52 Street SE to reduce peak queues. The comprehensive project lifecycle includes preliminary engineering, detailed design, contract tendering, administration, construction supervision, and warranty inspection, with a required completion date of October 31, 2028. Key technical deliverables include geotechnical investigations, pavement structure design, relocation of roadway lighting, and a Traffic Accommodation Strategy for high-volume urban freeway construction. This solicitation is restricted to a short-list of prequalified consultants, including Eagle Engineering Corp., Hatch Ltd., and Stantec Consulting Limited. Selection is based on a value-based process weighing qualifications (80 points) and fee proposals (100 points), with the final award determined by the best overall value rather than the lowest cost. The successful proponent must enter into a Lump Sum and Hourly Rate Contract and must possess a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or COR Equivalency Letter (COREL). Proposals must be submitted via the APC E-submissions platform by December 14, 2026, as two separate PDF files under 10MB each, consisting of a qualification submission and a fee proposal.
Transportation and Economic Corridors

POSTED

about 9 hours ago

DEADLINE

in 28 days
View Details