Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

PUERTO RICO ELECTRIC POWER AUTHORITY

UEI: EHNKJMN3LNZ7CAGE: 0E3M6

PUERTO RICO ELECTRIC POWER AUTHORITY is a federal contractor, registered under UEI EHNKJMN3LNZ7 and CAGE code 0E3M6. It has been awarded $16,420,287,000 in federal contracts. Primary work spans Unknown NAICS and Other NAICS codes (8 codes, <0.5% each). Top awarding agencies include Department Of Homeland Security (dhs), Department Of Housing And Urban Development (hud), and Department Of Energy.

Contact Information

Registration and classification details

Registration

UEI Code

EHNKJMN3LNZ7

CAGE Code

0E3M6

Entity Structure

Other

Established

N/A

Business Classifications

Other Not For Profit Organization

NAICS Codes

221111Hydroelectric Power Generation
221112Fossil Fuel Electric Power Generation
221115Wind Electric Power Generation
221121Electric Bulk Power Transmission and Control
221122Electric Power Distribution(Primary)
+1 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Puerto Rico Electric Power Authority specializes in the operation, maintenance, and strategic support of critical electric power distribution infrastructure, with demonstrated expertise in delivering reliable electrical services to government and defense installations. Their technical capabilities e...

Puerto Rico Electric Power Authority specializes in the operation, maintenance, and strategic support of critical electric power distribution infrastructure, with demonstrated expertise in delivering reliable electrical services to government and defense installations. Their technical capabilities extend to the coordination of utility systems integration, including electrical service provisioning for remote and mission-critical sites, as well as the decommissioning and removal of legacy electrical infrastructure in sensitive locations. The entity possesses hands-on experience in executing complex utility transitions under federal oversight, ensuring compliance with safety, security, and operational continuity standards in challenging environmental and logistical conditions. The contractor has delivered services primarily for the Department of Defense, supporting electrical infrastructure needs at defense sites in Puerto Rico, including the removal of power systems from former military installations such as ROTHR on Vieques. They have also provided utility regulation and administrative support under a contract with the National Science Foundation, indicating proficiency in interfacing with federal oversight frameworks for utility operations. Their work reflects a strong alignment with defense and federal science mission requirements, particularly where grid resilience and site-specific utility decommissioning are critical. Their primary industry focus centers on Electric Power Distribution (NAICS 221122), with additional experience in Water Supply and Irrigation Systems (221310) and Regulation and Administration of Utilities (926130). This positions them as a specialized provider of integrated utility services for federal installations, particularly in island and coastal environments where infrastructure durability and regulatory compliance are paramount. As a government entity structured as ZZ and headquartered in San Juan, Puerto Rico, Puerto Rico Electric Power Authority operates as a public utility authority with deep local operational knowledge and a mission-driven focus on critical infrastructure resilience. While no formal government certifications are listed, their sustained engagement with federal agencies underscores their credibility and reliability in delivering essential utility services under federal contract.

Key Performance Metrics

Awards Count

292

All time

Active

10

Currently performing

Completed

282

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
- Unknown NAICS$16.3B99.3%
Others - Other NAICS codes (8 codes, <0.5% each)$115.8M0.7%
Awards by Agency Over Time
Awards by Place of Performance

Compete with PUERTO RICO ELECTRIC POWER AUTHORITY

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for PUERTO RICO ELECTRIC POWER AUTHORITY

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in PUERTO RICO ELECTRIC POWER AUTHORITY's top NAICS codes and agencies

NAICS: 541330
New
“BLANKET MASTER AGREEMENT (BMA) FOR
Solicitation # 393273
Hanford Tank Waste Operations & Closure, LLC (H2C) is soliciting proposals for a Blanket Master Agreement (BMA) to provide vadose drilling services at the Hanford Tank Farms. This Time and Materials (T&M) subcontract supports Prime Contract 89303324DEM000096 with the U.S. Department of Energy. The opportunity is open to all business size companies, with award based on the Lowest Price Technically Acceptable (LPTA) proposal. The contract includes a base period with four optional extension years running through September 30, 2031. To be considered for award, offerors must meet strict qualification standards, including ten years of corporate experience in Direct Push soil displacement method drilling, borehole geophysical logging, and soil sampling. Requirements include the ability to comply with WAC 173-160 well drilling standards, the capacity to furnish and decontaminate all necessary equipment, and maintaining a mechanical shop and warehouse within 75 miles of the Hanford Site. Proposals must be submitted in two volumes: a Technical Proposal containing a work plan, quality assurance program, and key personnel resumes, and a Business and Price Proposal featuring a detailed hourly rate breakdown. Compliance requirements are extensive, including mandatory SAM registration, E-Verify enrollment, and adherence to the Service Contract Act and the Buy American Act. Offerors must provide an Organizational Conflict of Interest certification, a documented ESH&Q program, and proof of insurability, including three years of Experience Modification Rate (EMR) data and OSHA 300 logs. For non-small businesses, a Small Business Subcontracting Plan is required if the proposed amount exceeds 900,000 dollars. Payment is generally issued within 30 calendar days of receiving a proper invoice.
Department Of Energy

POSTED

3 days ago

DEADLINE

in about 2 months
View Details