Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

RAYTHEON TECHNOLOGIES CORPORATION East Hartford CT USA

UEI: SLED_BC8FF04D5C11893D

RAYTHEON TECHNOLOGIES CORPORATION East Hartford CT USA is a federal contractor, registered under UEI SLED_BC8FF04D5C11893D. It has been awarded $459,017,660 across 10 federal contracts. Primary work spans Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology), Engineering Services, and Other NAICS codes (3 codes, <0.5% each). Top awarding agencies include FA8626 Aflcmc Wn/lp, NASA Armstrong Flight Research Cntr, and Other agencies (3 agencies, <0.5% each).

Contact Information

Registration and classification details

Registration

UEI Code

SLED_BC8FF04D5C11893D

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
FA8626 Aflcmc Wn/lp$453.1M98.7%
NASA Armstrong Flight Research Cntr$3.7M0.8%
Other agencies (3 agencies, <0.5% each)$2.3M0.5%
Awards by NAICS
541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)$454.1M98.9%
541330 - Engineering Services$3.7M0.8%
Others - Other NAICS codes (3 codes, <0.5% each)$1.2M0.3%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in RAYTHEON TECHNOLOGIES CORPORATION East Hartford CT USA's top NAICS codes and agencies

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 includes architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include using 24-inch diameter stainless steel Ful-Flo louvered well screens and ensuring the new pump matches existing vertical turbine equipment applications. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications rather than lowest cost, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026. The contract is subject to strict federal and state regulations, including Build America Buy America (BABA) domestic-content requirements, the Iran Contracting Act, and various non-discrimination and environmental statutes. Payment is managed exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system, with oversight provided by the Bureau of Reclamation.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project is a professional services engagement managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District in California. The project involves a two-phase approach to replace the existing Corydon Well. Phase 1 focuses on the design, technical specifications, and bid scheduling for the drilling of a new well and the abandonment of the old one, including full-time on-site construction management. Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the new groundwater production well, along with engineering services during construction. The total estimated project cost is 2,260,788 dollars, with a project start date of November 2, 2026, and a final reporting deadline of January 28, 2028. The contract is partially funded by a Department of the Interior Bureau of Reclamation WaterSMART grant, requiring strict adherence to federal procurement standards, including the Build America, Buy America Act and 2 CFR Part 200. Qualified firms, particularly certified DBE and small diverse businesses, are encouraged to apply. Requirements for respondents include providing a detailed project approach, personnel resumes, and evidence of California professional licenses and CARB compliance. Award selection is based on the most advantageous proposal, considering both qualifications and price. The agreement is governed by California law with venue in Riverside County and requires comprehensive bonding, including 100 percent performance and payment bonds, as well as significant general liability and automobile insurance coverage.
GEI Consultants, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details