Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Recco Inc. dba Five R Construction P.o. Box 20368 Cheyenne Wyoming 82003

UEI: SLED_72094F5A80837A3C

Recco Inc. dba Five R Construction P.o. Box 20368 Cheyenne Wyoming 82003 is a federal contractor, registered under UEI SLED_72094F5A80837A3C. It has been awarded $6,311,368 across 1 federal contract. Primary work spans Unknown NAICS. Top awarding agencies include W7N9 Uspfo Activity Wyang 153.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_72094F5A80837A3C

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
W7N9 Uspfo Activity Wyang 153$6.3M100%
Awards by NAICS
- Unknown NAICS$6.3M100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in Recco Inc. dba Five R Construction P.o. Box 20368 Cheyenne Wyoming 82003's top NAICS codes and agencies

NAICS: 238160
Federal
CES - Repair Roof Bldg 37The contract pertains to the complete replacement of the roof system on Building 37 at the 153d Airlift Wing base in Cheyenne, Wyoming, involving the removal of the existing single-ply membrane and installation of a Sprayed Polyurethane Foam (SPF) roof system covering approximately 9,332 square feet. The scope includes replacing all parapet caps and metal flashing to match existing conditions, repairing coping, drains, scuppers, and other appurtenances, and applying a layered roof system consisting of a vapor barrier, two layers of 1/2-inch cover board, a 2-inch Polyiso base layer, and the SPF topping. The work must adhere to specified material standards and include a critical path schedule or Gantt chart. All debris must be removed and disposed of in compliance with federal, state, and local regulations. The contractor is required to submit detailed material specifications for SPF components, flashing, and sealants, along with a Quality Control Plan and a Safety Plan at least seven working days before beginning onsite work. The project is subject to Davis Bacon Prevailing Wage requirements as it is fully federally funded. The solicitation is a sources-sought action under NAICS code 238160, with a total small business set-aside, and responses are due by July 16, 2026. Proposers must demonstrate proven experience with WYMD roof installations using the specified SPF material and provide all required documentation, including the AF 3000 Material Submittal Form, AF 3052 Construction Cost Estimate, AF 3064 Progress Schedule, SF 1413 Statement and Acknowledgment, and adherence to the Wyoming ANG Submittal Schedule and Transmittal forms. Access to the installation requires strict compliance with security protocols, including background checks, personal identity verification, and AT Level 1 training, with all personnel subject to random vehicle inspections. Contractors must coordinate all deliveries and site access with the Contracting Officer’s Representative and obtain prior written approval for any work outside designated hours, which exclude Federal holidays and every other Friday known as “Phoenix Fridays.” The work is warranted for twenty years against material or workmanship failure, and the contractor must maintain all necessary licenses, bonding, and permits. All communications must be conducted via email and routed through the Contracting Officer and COR, with answers provided within ten days of inquiry.
W7N9 Uspfo Activity Wyang 153

POSTED

26 days ago

DEADLINE

in 8 days
View Details