Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

SAK CONSTRUCTION LLC

UEI: LR28NMPH3Z37CAGE: 58HU5

SAK CONSTRUCTION LLC is a federal contractor, registered under UEI LR28NMPH3Z37 and CAGE code 58HU5. It has been awarded $78,646,280 in federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction and Water Supply and Irrigation Systems. Top awarding agencies include Department Of Defense, Department Of State, and Department Of Defense (dod).

Contact Information

Registration and classification details

Registration

UEI Code

LR28NMPH3Z37

CAGE Code

58HU5

Entity Structure

Other

Established

N/A

Business Classifications

For Profit OrganizationLimited Liability Company

NAICS Codes

237110Water and Sewer Line and Related Structures Construction(Primary)
237990Other Heavy and Civil Engineering Construction
238210Electrical Contractors and Other Wiring Installation Contractors
541330Engineering Services
561990All Other Support Services

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

SAK CONSTRUCTION LLC specializes in the design and execution of water and sewer line infrastructure projects, including pipeline rehabilitation, underground utility repairs, and related structural construction. The company delivers mission-critical civil works using trenchless technologies, gravity ...

SAK CONSTRUCTION LLC specializes in the design and execution of water and sewer line infrastructure projects, including pipeline rehabilitation, underground utility repairs, and related structural construction. The company delivers mission-critical civil works using trenchless technologies, gravity and pressure sewer systems, and compliant excavation practices aligned with ANSI and ASTM standards. Their work demonstrates proficiency in restoring aging municipal and federal utility networks under constrained operational environments, with an emphasis on minimizing service disruption and ensuring long-term structural integrity. Technical expertise includes pipeline alignment verification, backfill compaction control, leak detection, and coordination with existing subsurface utilities, ensuring compliance with OSHA and EPA regulations. The contractor has delivered infrastructure repair services to both the Department of Defense and the Department of State, supporting overseas and domestic facilities requiring resilient utility systems. For the DoD, this includes maintenance of base-wide water and sewer networks critical to operational readiness; for the State Department, it involves repairs to diplomatic compounds and consular facilities in high-priority locations, where security, continuity, and environmental compliance are paramount. These engagements reflect a pattern of trusted execution in sensitive, mission-driven environments requiring strict adherence to federal construction protocols. SAK CONSTRUCTION LLC’s primary industry focus is NAICS 237110, which encompasses the construction of water and sewer lines, pumping stations, and associated appurtenances. The firm positions itself as a niche provider of underground utility infrastructure repair and replacement, serving government clients requiring durable, code-compliant solutions in challenging terrain or urban settings. Their market presence is defined by precision execution in civil infrastructure rather than large-scale new construction. As a small business entity based in O’Fallon, Missouri, SAK CONSTRUCTION LLC operates without federal certifications but maintains a focused geographic footprint aligned with federal infrastructure needs across domestic and overseas installations. The company’s operational model emphasizes agility, regulatory compliance, and field-ready expertise in utility rehabilitation.

Key Performance Metrics

Awards Count

27

All time

Active

0

Currently performing

Completed

27

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with SAK CONSTRUCTION LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for SAK CONSTRUCTION LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in SAK CONSTRUCTION LLC's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators and the installation of new slide gates. Electrical and instrumentation work includes the replacement of motor control center components and general system improvements. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, lead abatement, metals fabrication, painting, coatings, trucking, hauling, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, at 2:00 PM PT, ahead of the final bid date on November 18, 2026. Any exceptions to the standard purchase order and subcontract forms must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 9 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Electrical upgrades will include new Southern California Edison services and standby power systems. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified firms, with a strong encouragement for DBE participation. Bids are due by October 29, 2025, at 2:00 PM. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A; K-27-2470-DBB-3-C
Solicitation # BP26019
The City of San Diego's Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A (K-27-2470-DBB-3-C) is a civil infrastructure project with an estimated construction cost of 35.1 million dollars. The scope of work is divided into two primary components: the installation of approximately 5,216 linear feet of new sewer pipe, including groundwater dewatering, bypass pumping, and trenchless work, and the replacement of approximately 5,886 linear feet of existing 6, 8, 12, and 16 inch AC water mains and associated appurtenances. Additional requirements include the construction of temporary access roads, traffic control, repaving, signal loop replacement, curb ramp installation, and comprehensive site restoration. The project has a total completion timeframe of 550 working days, which includes a 120-day Plant Establishment Period and a 25-month Long Term Maintenance and Monitoring Agreement for vegetated areas. This is a prevailing wage project subject to a Project Labor Agreement. Bidders must adhere to specific bonds, insurance, and confidentiality requirements, and are encouraged to provide certifications for disadvantaged or small business statuses, such as DBE, WOSB, or VOSB. Subcontractor proposals are requested by Burtech Pipeline Incorporated by October 26, 2026, with the final bid due to the City by October 28, 2026.
BURTECH PIPELIINE INCORPORATED

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details