Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SMOKE BLOTTER

UEI: YRSPAYVA97E4

SMOKE BLOTTER is a federal contractor, registered under UEI YRSPAYVA97E4. It has been awarded $119,007 in federal contracts. Primary work spans Automotive Exhaust System Repair, Military Armored Vehicle, Tank, and Tank Component Manufacturing, and Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

YRSPAYVA97E4

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

4

All time

Active

0

Currently performing

Completed

4

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with SMOKE BLOTTER

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for SMOKE BLOTTER

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in SMOKE BLOTTER's top NAICS codes and agencies

NAICS: 333413
New
DIBBS
IMPELLER, FAN, AXIAL
Solicitation # SPE8E7-26-T-4000
Solicitation SPE8E7-26-T-4000 is a Request for Quotations issued by DLA Troop Support Construction and Equipment for the procurement of 13 axial fan impellers, identified by NSN 4140-01-292-5129 and Textron Systems Corp part number 503285. The requirement falls under NAICS code 333413. Delivery is required within 156 days after order, with a need ship date of March 15, 2027, and an original required delivery date of July 21, 2027. Shipping terms are FOB Origin, with the final destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict technical and quality standards, including the DLA Master List of Technical and Quality Requirements, specifically regarding source approval requests, covered defense information, and the removal of government identification from non-accepted supplies. Packaging must comply with MIL-STD-2073-1E, and marking must follow MIL-STD-129, with a specific waiver substituting MIL-STD-129K for MIL-L-61002. Additionally, contractors are instructed to avoid using plastics for wrapping or cushioning whenever possible. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and receiving reports. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, safeguarding covered defense information, and prohibitions on hexavalent chromium and toxic materials. Offerors must also comply with the Buy American Act and the Berry Amendment. Quotations were requested via the DIBBS system by October 9, 2026.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details
NAICS: 336992
New
DIBBS
ELECTRICAL TRANSMISSIO
Solicitation # SPE7L3-27-T-1622
Solicitation SPE7L3-27-T-1622 is a request for quotations issued by the DLA Weapons Support Land Supplier Operations Vehicle Support for the procurement of one Electrical Transmission Kit, identified by NSN 2520-01-557-6745 and part number R0075681. The item is associated with manufacturers including General Dynamics Land Systems Canada, DA Power Products, and Denel Vehicle Systems. The required delivery date is October 22, 2026, with a delivery lead time of five days and shipping terms set as FOB Origin. The final destination for delivery is Rose Barracks South Camp in Vilseck, Germany, where both inspection and acceptance will take place. The contract mandates strict adherence to technical and quality requirements via the DLA Master List and requires packaging and marking to comply with MIL-STD-2073-1E and MIL-STD-129. Special requirements include the prohibition of Class I ozone-depleting chemicals and compliance with IP025 for the handling of hazardous materials. Administratively, the contractor must use the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses include the Buy American and Balance of Payments Program, CMMC Level 2 self-assessment, and safeguarding of covered defense information. This procurement is identified as a small business set-aside, and the government may apply a HUBZone price evaluation preference during the award process.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS VEHICLE SPT

POSTED

about 14 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for the design and construction of two critical facilities at JBER-Richardson, Alaska, with a combined estimated value of 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), will be a 52,000 square foot, all-weather, 24-hour operation serving as the sole hazardous cargo processing point and consolidated alert preparation area, featuring NIPR and SIPR connectivity and specialized loading dock capabilities. The second project, the Rapid Deployment Facility (JBR044), will support a Brigade Combat Team (Airborne) and includes a passenger shed for personnel processing and a joint inspection facility equipped with vehicle inspection lanes, an indoor wash rack with an oil-water separator, and 463L pallet storage. Both facilities require specialized cold climate design practices for Climate Zone 7, cybersecurity for four platforms, and integrated building information systems. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of 2029 and a 24-month construction period beginning in 2030. This current phase is a sources-sought effort to determine the optimal project delivery method, such as Progressive Design-Build, Design-Build to Budget, or CM at Risk, and to evaluate industry capabilities regarding technical approach, past performance, and team integration.
Department Of Defense

POSTED

about 19 hours ago

DEADLINE

in 7 days
View Details