025-010-032-01 | Repair Interior and Exterior, Eradicate Mold and Replace Flooring System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the design and repair of the Fifth District Appellate Courthouse in Mt. Vernon, Jefferson County, a historic three-story building constructed in 1854. With an appropriated amount and estimated total project cost of 5,800,000 USD, the scope of work includes replacing the roofing system and flooring, repairing the exterior masonry, and refinishing the wrought iron fence. Interior improvements focus on correcting humidity issues, repairing water-damaged surfaces, and modernizing private and public restrooms for better accessibility. Additionally, the project requires upgrades to security systems, access control, and both interior and exterior lighting. The architect and engineer are responsible for ensuring the design complies with the Illinois Stretch Energy Code and must consult with the State Historic Preservation Office throughout all project phases. Interior work must be phased to maintain facility operations, and the A/E is tasked with identifying and applying for utility incentives, energy grants, and rebates. The project mandates a combined MBE/WBE goal of 18% and a combined PBE/VBE goal of 2%. Professional liability insurance of 1,250,000 USD is required, and the A/E is encouraged to use independent cost estimators to ensure the design remains within the available funding.
General Info
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Contract opportunity posted
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
The scope of work provides for the design and replacement of worn-out flooring throughout the facility. Replace the roofing system on the main building and repair deck as needed. Perform a limited study of the exterior masonry and strip, repair, and refinish the exterior, based on the results of the study. Repair, refinish, or replace exterior doors and frames as needed. Repair and refinish the wrought iron fence. Repair and refinish interior surfaces that show water damage. Modernize the private restrooms with new fixtures, accessibility features, and finishes. Improve the accessibility of the public restrooms where practical. Assess and correct humidity issues. Provide interior and exterior lighting improvements. Upgrade security systems and install access control. Provide related, supporting, and incidental work as necessary. The interior portions of this project will need to be phased to account for continued operations. Hazardous materials may be encountered. The State Historic Preservation Office should be consulted during every phase of this project.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:
More opportunities from Illinois → Appellate Court / Fifth District
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
