Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

025-010-032-01 | Repair Interior and Exterior, Eradicate Mold and Replace Flooring System

Open
025-010-032-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the design and repair of the Fifth District Appellate Courthouse in Mt. Vernon, Jefferson County, a historic three-story building constructed in 1854. With an appropriated amount and estimated total project cost of 5,800,000 USD, the scope of work includes replacing the roofing system and flooring, repairing the exterior masonry, and refinishing the wrought iron fence. Interior improvements focus on correcting humidity issues, repairing water-damaged surfaces, and modernizing private and public restrooms for better accessibility. Additionally, the project requires upgrades to security systems, access control, and both interior and exterior lighting. The architect and engineer are responsible for ensuring the design complies with the Illinois Stretch Energy Code and must consult with the State Historic Preservation Office throughout all project phases. Interior work must be phased to maintain facility operations, and the A/E is tasked with identifying and applying for utility incentives, energy grants, and rebates. The project mandates a combined MBE/WBE goal of 18% and a combined PBE/VBE goal of 2%. Professional liability insurance of 1,250,000 USD is required, and the A/E is encouraged to use independent cost estimators to ensure the design remains within the available funding.

General Info

Design and repair of the historic Fifth District Appellate Courthouse in Mt. Vernon.

NAICS

N/A

Place of Performance

IL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstsow
High

Read the document

Due in 20 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Appellate Court / Fifth District
Contacts1 person available
OfficeIL
Office AddressIL
Contacts
McGuire MichaelProject manager

Full Description

Show more
The Fifth District Appellate Courthouse (P0300) is a 15,123 square foot, three-story building constructed in 1854.
The scope of work provides for the design and replacement of worn-out flooring throughout the facility. Replace the roofing system on the main building and repair deck as needed. Perform a limited study of the exterior masonry and strip, repair, and refinish the exterior, based on the results of the study. Repair, refinish, or replace exterior doors and frames as needed. Repair and refinish the wrought iron fence. Repair and refinish interior surfaces that show water damage. Modernize the private restrooms with new fixtures, accessibility features, and finishes. Improve the accessibility of the public restrooms where practical. Assess and correct humidity issues. Provide interior and exterior lighting improvements. Upgrade security systems and install access control. Provide related, supporting, and incidental work as necessary. The interior portions of this project will need to be phased to account for continued operations. Hazardous materials may be encountered. The State Historic Preservation Office should be consulted during every phase of this project.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:

More opportunities from Illinois → Appellate Court / Fifth District

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS