Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

05A3042 - Independent Cost Estimator (ICE) and Construction Scheduler in support of CMGC Project Development and Construction Services

Closed
05A3042State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The California Department of Transportation (Caltrans) is soliciting Statements of Qualifications (SOQs) for solicitation 05A3042 to secure professional Architectural and Engineering services for an Independent Cost Estimator (ICE) and Construction Scheduler. This role supports CMGC Project Development and Construction Services for District 5, with an estimated contract value between $501,360 and $814,710 over a three-year term. The selected consultant will be responsible for performing independent cost analysis and scheduling, utilizing production-based cost models to validate proposed pricing from the Construction Manager/General Contractor. All work must adhere to Caltrans manuals, the Project Management Handbook, and PMI's Guide to the Project Management Body of Knowledge. The selection process follows a dual-stage evaluation: an initial review of SOQs followed by interviews for short-listed firms. The final score is weighted with the initial evaluation accounting for 25 percent, while the remainder is based on a task order presentation and responses to technical scenario questions. Submissions must be made as a single unprotected PDF via a Novell FIIR account by September 16, 2026. Key requirements for applicants include compliance with the U.S. DOT Disadvantaged Business Enterprise Program, state nondiscrimination laws, and the disclosure of any Generative AI technology used in the proposal. Personnel must possess a current California Driver's License, defensive driving certification, and completed construction safety orientation.

General Info

Caltrans seeks cost estimator and scheduler services for CMGC projects by September 16, 2026.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstsoq-submittal-instructions
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this first4 pages · sources-sought
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Civil Design & PS&E DevelopmentOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
State of California 05A3042 - Independent Cost Estimator (ICE) and Construction Scheduler in support of CMGC Project Development and Construction Services Tender # 05A3042 Closing Date : 09/16/2026 at 22:00 PM Contact: Adam Matheny Phone: Email: Sign up to see this detail Details: 05A3042 - Independent Cost Estimator (ICE) and Construction Scheduler in support of CMGC Project Development and Construction Services The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request at http://bit.ly/dpac-ada or call Sign up to see this detail. Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for A&E Structure Construction Services. The estimated contract is $ 501,360.00 - $ 814,710.00 0% DBE Participation Goal Required. Addendum 1 - Addendum 1 - DBE CM GenAI SOQ 10-24-2025 version 2 It is the responsibility of the consultants/subs/vendors to identify teams that may be submitting a Statement of Qualifications. The Department has no way of identifying companies or entities that have downloaded the project documents for teaming purposes. Disclaimer: This bid is researched and provided for information purposes only. To participate in this bid opportunity, interested vendors are sometimes required to register on the State of California's website. Please refer to the originating organization for any information relating to this. Direct all queries pertaining to the language, the content or any missing or inaccurate information within this abstract to its originator, as indicated in the advertisement. Note: When you click on the link below, a new window will open to the site where you can locate more information regarding this bid. You may need to search the site to locate the bid. View Bid Information Biddingo.com is not responsible for the contents of the third party site and does not make any representations regarding the content or accuracy of materials on such third party web sites. If you decide to access them, you do so at your own risk.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
SB Minor B-Install Concrete Barrier (Type 60 MS) with continuous 10-inch footing, widen structural section, install signs and lighting standards-San Diego County
Solicitation # 11A4486
The California Department of Transportation is soliciting bids for a Small Business Minor B contract in San Diego County to install concrete barriers with continuous 10-inch footings, widen structural sections, and install signs and lighting standards. This opportunity is strictly limited to certified Small Businesses, and while there is no formal DVBE goal, participation is encouraged. The approximate magnitude of work is $367,168.50, and any bid exceeding $484,000.00 will be rejected. Bids must be submitted via email to Jomlonglak Kamaay by December 2, 2026, as hard copy submissions will not be accepted. The scope of work includes the implementation of temporary traffic control, roadway excavation, and the installation of lighting and signage. Key technical requirements include a minimum seven-year manufacturer's warranty for luminaires and strict adherence to the 2026 Edition of the Standard Specifications. Contractors must provide certificates of compliance for all construction materials, including certified mill test reports for steel and iron to satisfy Buy America requirements. Additionally, the contractor must comply with ADA standards, organic waste recycling mandates, and prevailing wage rates determined by the California Department of Industrial Relations. Award is based on a comparison of bids, and responsiveness depends on the submission of all required forms, including the In-Use Off-Road Diesel-Fueled Vehicle List. Payment is handled through itemized invoices submitted in triplicate, with a minimum payment threshold of $5,000. While bid bonds are not required for this Minor B project, payment bonds and insurance will be required at the time of award for the low bidder.
Highway, Street, and Bridge Construction

POSTED

about 19 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS