10567 - Large Trash Capture Device Installation Phase VII - Hartog Dr - Re-Bid II

Active
20261024017State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Jose is seeking sealed bid proposals for the installation of a single Large Trash Capture (LTC) device along a 66-inch diameter storm pipe flowing into Coyote Creek at the Hartog Dr location. The scope of work includes the installation of a precast LTC device, a precast concrete structure diversion box, storm inlets, and a storm manhole. Additionally, the project requires connecting new pipes to existing ones, removing and replacing curb and gutter, paving, implementing sewer diversion, and performing general street improvements. All work must comply with the Municipal Regional Stormwater Permit 3.0 dated May 11, 2022, and CARB Off-Road Regulations. Eligible bidders must hold a valid California contractor's license, classification A, and be registered with the Department of Industrial Relations. Proposals must be submitted electronically via Biddinggo by 11:00 a.m. on November 19, 2026. The project is classified as public works, requiring compliance with California prevailing wage laws and the signing of a Project Labor Agreement. Award requirements include the submission of a bidder's bond and the subsequent provision of performance and payment bonds for 100 percent of the contract amount. Bidders must also ensure no conflicts of interest exist under California Government Code and adhere to the nondiscrimination requirements of the San Jose Municipal Code.

General Info

San Jose seeks bids for installing a large trash capture device at Hartog Drive.

Documents

1

10567 - Large Trash Capture Device Installation Phase VII - Hartog Dr - Re-Bid II

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San José
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Public Works Department CIP Procurement

Full Description

Show more
The project involves the installation of a single Large Trash Capture (LTC) Device along a 66-inch diameter storm pipe flowing into Coyote Creek. The scope includes installing a precast LTC device, a precast concrete structure diversion box, storm inlets, a storm manhole, connecting new pipes to existing pipes, removing and replacing curb and gutter, paving, implementing sewer diversion, and performing street improvements. The project must comply with the latest Municipal Regional Stormwater Permit (MRP) 3.0, dated May 11, 2022.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operational station equipped with mechanical and electrical systems, a generator, odor control equipment, stormwater facilities, and fencing. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide a bid bond and, upon award, furnish performance and payment bonds along with proof of insurance. The project is governed by EJCDC standard general and supplementary conditions. Payment is processed via monthly applications for payment submitted to the Engineer, with payments becoming due thirty days after presentation to the owner. Performance begins upon the issuance of a Notice to Proceed, and the work must adhere to strict technical standards, including NEMA, ASTM, and AMCA specifications.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of open and covered concrete structures, relining or replacement of steel and ductile iron piping and supports, and the installation of valves and piping appurtenances. Additional technical requirements involve the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. A critical requirement for all subcontractors is the mandatory use of union labor. Additionally, potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and concrete restoration, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → City of San José

Same awarding agency

NAICS: 236220
New
SLED
Fire Station No. 36 - New (2018 Measure T)
Solicitation # 9163
The City of San Jose is soliciting pre-qualified bidders for the construction of Fire Station No. 36, located at 3363 Tuers Road. This project involves the development of a 7,000-square-foot, single-story, wood-framed facility featuring two apparatus bays on a 1.12-acre site. The comprehensive scope of work includes structural and utility components, MEP systems, interior and exterior finishes, and extensive site development such as demolition, soil mitigation, grading, paving, and the installation of an on-site generator and fuel storage tank. The project also incorporates landscaping, bioretention areas, and a target of minimum LEED Silver certification. Construction is scheduled to begin in August 2027, with substantial completion expected by December 2028. The pre-qualification process requires a single PDF submission by November 20, 2026. Bidders are evaluated based on a three-part system: a non-scored information section, a pass/fail section covering insurance and bonding capabilities, and a scored section requiring a minimum of 60 out of 85 points. Contractors must demonstrate the ability to obtain performance and payment bonds for a contract value of up to 16.5 million dollars and provide evidence of project experience through at least two project data sheets. Additionally, firms must comply with California Air Resources Board regulations and provide certifications regarding their safety records, including injury and illness rates over the last three years and regulatory violations over the last five years.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS