Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

1100 E 5th Street Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 1100 East 5th Street Project involves the demolition of three existing warehouse buildings and a surface parking lot to make way for an eight-story mixed-use development on a 1.2-acre site in Los Angeles. The proposed building will contain 220 live/work units, with 25 units, or 11 percent, designated as deed-restricted for Very Low Income households, alongside 46,548 square feet of commercial space and three levels of underground parking. The total floor area of the project will be 249,758 square feet, achieving a Floor Area Ratio of 4.77:1. A Flexibility Option allows for the substitution of 20 live/work units with an additional 17,765 square feet of commercial space, maintaining all other project elements unchanged. The project site is situated at 1100 E. 5th Street and 506-530 S. Seaton Street in the 90013 ZIP code. The City of Los Angeles is the lead agency overseeing the initiative, with Kathleen King listed as the primary point of contact as City Planner. The applicants are WW-5th & Seaton LLC and XF-5th & Seaton LLC, represented by Michael at Maxxam LLC. The project was posted as a forecast on June 30, 2025, and all public documentation is accessible through the California Environmental Quality Act portal. The development aims to blend residential, commercial, and affordable housing components while complying with urban density standards and addressing community housing needs.

General Info

Demolition of three warehouses for eight-story mixed-use development with 220 units, 25 affordable, commercial space, and underground parking in Los Angeles.

Agency

California → City of Los Angeles

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

5th Street and Seaton Street, CA

Set-Aside

NONE

Documents

(1)

City of Los Angeles CEQA Notice of Determination for 1100 E. 5th Street Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Kathleen KingCity Planner
WW-5th & Seaton LLC XF-5th & Seaton LLCApplicant

Full Description

Show more
The 1100 East 5th Street Project (Project) proposes the demolition of three existing warehouse buildings and a surface parking lot for the construction of an eight-story mixed-use building comprised of 220 live/work units, of which 11 percent (25 units) would be deed-restricted for Very Low Income (VLI) households, 46,548 square feet of commercial uses, and three subterranean parking levels. The Project would total 249,758 square feet of floor area on a 1.2-acre site, resulting in a Floor Area Ratio (FAR) of 4.77:1. The Project includes a Flexibility Option that provides the flexibility to replace 20 live/work units with an additional 17,765 square feet of commercial uses, with no other changes to the scope of the Project. The Project Site is located at 1100 E. 5th St. and 506-530 S. Seaton St., Los Angeles, CA 90013.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport S Concourse Evolution (SCE) Project Bid Package 02 is a solicitation managed by Hensel Phelps, acting as the General Contractor/Construction Manager. This 8(a) Small Disadvantaged Business set-aside opportunity involves a comprehensive scope of work across twelve subsystems, including demolition and abatement, building concrete retrofit, structural steel, fire suppression, site paving, runway and taxi marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems. The estimated total contract value ranges from 124,206,500 to 143,700,000 dollars, with individual subsystem budgets varying significantly, such as demolition and abatement ranging from 43 million to 50 million dollars. The project is governed by a Project Labor Agreement (PLA) and requires all subcontracts to be executed on Hensel Phelps standard subcontract forms. Key compliance requirements include a Workers Compensation Waiver of Subrogation for all subcontractors and performance bonds for subcontracts exceeding 100,00. Bids must be submitted via email to the designated point of contact using the provided bid form and bond forms. The response deadline for this solicitation is September 1, 2026, with the place of performance located in Washington.
Hensel Phelps

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238910
New
Federal
Demo Mini mute sites
Solicitation # FA480326Q0094
The U.S. Government, through the Department of Defense at Shaw Air Force Base, South Carolina, is conducting a sources sought initiative under solicitation number FA480326Q0094 to identify qualified small businesses capable of performing demolition and site restoration services at two locations—Olanta Site and Kingstree Site. This is a pre-solicitation notice with no formal offer submission permitted at this time; the sole purpose is to gather information on industry capability, capacity, and eligibility under a Total Small Business Set-Aside (FAR 19.5). Respondents are required to provide their business capability statement, NAICS code 238910, SBA small business certification status, CAGE code, current SAM.gov registration status, and point of contact details. Work includes full demolition of mini-mute sites comprising lightning towers, concrete footings, underground electrical infrastructure, fencing, and related structures, followed by site restoration involving grading and hydroseeding. The performance period is 60 calendar days from Notice to Proceed, with all activities governed by UFC, UFGS, NFPA, NEC, and Shaw AFB Design Standards, with UFC taking precedence. Contractors must comply with environmental regulations set by SCDHEC and EPA, properly document and dispose of hazardous materials including refrigerants, and submit daily RAKEN reports, dump receipts, and video documentation. Equipment must be new, installed per manufacturer instructions, and all engineering drawings require sealing by a South Carolina-licensed Professional Engineer. Payment requires submission of the DD1354 form, and debris must be transported in covered containers along approved routes to authorized landfills. No pricing, contract value, or award evaluation factors are included as this is strictly an information-gathering action prior to potential IDIQ contract award.
FA4803 20 Cons Lgca

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details