12 slipline installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Show Low is soliciting sealed bids for the installation of approximately 4,100 linear feet of a 12-inch heat fused SDR11 PE100 pipe via sliplining inside an existing 30-inch concrete carrier pipe as part of Project No. FM-6824. The carrier pipe alignment includes a single deflection point located roughly 2,470 linear feet from the lake intake, extending from the Show Low Lake intake pump facility to the outfall at an existing irrigation canal. The scope includes excavation for receiving pits, engineering and manufacturer calculations for pull lengths, and proper termination of the pipe at both the intake and outfall locations. All work must be conducted within existing easements and comply with specified construction, safety, and quality standards, including Arizona Occupational Safety and Health regulations and MAG uniform specifications. The successful bidder must submit a detailed work plan and a quality control plan, ensure all testing is performed by independent certified labs, and provide certified as-built drawings upon project completion. The procurement is managed by the City of Show Low Engineering Project Manager with a mandatory pre-bid conference scheduled for April 10, 2024, and sealed bids due by 3:00 PM on April 24, 2024. The City reserves the right to modify the scope or reject bids based on its best interests. Bid submissions must comply with detailed instructions including requirements for licenses, affidavits such as the Non-Collusion Affidavit, and subcontractor listings. The contract is expected to be firm-fixed-price, with performance expected within 45 calendar days after the Notice to Proceed. The contract documents encompass bid forms, bonds, special provisions, and change order procedures, although no formal FAR clauses or contract options are specified. Evaluation criteria emphasize bidder qualifications, compliance with specifications, and cost considerations without numerical weighting, aligning with a trade-off award approach rather than lowest-price-only. Payments are milestone-based, with up to 90% paid on completed work and materials properly stored and invoiced. Key administrative points include internal payment processing by the City’s Public Works Director and the absence of federally designated contracting officer roles or electronic invoicing systems in the documentation.
General Info
Agency
Place of Performance
AZ, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
