120-231-037-01 | Install Fire Protection Systems in Dorms 1 - 6
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Illinois Department of Corrections is seeking an Architect/Engineer (A/E) to install new fire sprinkler systems across six dormitories at the Joliet Treatment Center in Will County. The project encompasses a variety of buildings established between 1956 and 1969, ranging in size from 9,040 to 28,600 square feet. The scope of work includes the removal and replacement of ceilings, necessary electrical modifications to support the sprinkler installation, and a comprehensive code analysis for each building. The A/E is also responsible for ensuring the design complies with the Illinois Stretch Energy Code where applicable. The selected A/E must coordinate all telecommunications and networking requirements with the Department of Innovation and Technology (DoIT) during both the design and construction phases. Additionally, the A/E is tasked with identifying and applying for utility incentive programs, energy grants, and rebates to optimize project funding. To ensure the project remains within budget, the A/E is encouraged to utilize independent cost estimators and must update estimates at each project stage. The A/E maintains professional responsibility for providing a design that fits within the available funding to avoid the need for redesigns.
General Info
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Contract opportunity posted
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
The scope of work provides for providing new fire sprinkler systems in Dorms 1-6 at the Joliet Treatment Center. The work shall include the removal and replacement of ceilings, along with any electrical modifications necessary to accommodate the sprinkler work. A code analysis will be required for each building. The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is required to coordinate all telecommunications and networking requirements with the Department of Innovation & Technology (DoIT) during design and construction.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:
More opportunities from Illinois → Department of Corrections
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
