Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

120-231-037-01 | Install Fire Protection Systems in Dorms 1 - 6

Open
120-231-037-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Illinois Department of Corrections is seeking an Architect/Engineer (A/E) to install new fire sprinkler systems across six dormitories at the Joliet Treatment Center in Will County. The project encompasses a variety of buildings established between 1956 and 1969, ranging in size from 9,040 to 28,600 square feet. The scope of work includes the removal and replacement of ceilings, necessary electrical modifications to support the sprinkler installation, and a comprehensive code analysis for each building. The A/E is also responsible for ensuring the design complies with the Illinois Stretch Energy Code where applicable. The selected A/E must coordinate all telecommunications and networking requirements with the Department of Innovation and Technology (DoIT) during both the design and construction phases. Additionally, the A/E is tasked with identifying and applying for utility incentive programs, energy grants, and rebates to optimize project funding. To ensure the project remains within budget, the A/E is encouraged to utilize independent cost estimators and must update estimates at each project stage. The A/E maintains professional responsibility for providing a design that fits within the available funding to avoid the need for redesigns.

General Info

Architect/Engineer to install fire sprinkler systems at Joliet Treatment Center dormitories.

NAICS

N/A

Place of Performance

IL, USA

Set-Aside

NONE

Documents

1
PDF, Low priorityother
Low

Read the document

Due in 20 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Department of Corrections
Contacts1 person available
OfficeIL
Office AddressIL
Contacts
Smith AntwaunProject manager

Full Description

Show more
The Joliet Treatment Center (Will County) is a 28-building facility established in 1863. The Dorm 1 (C1915) is a 13,196 square foot, 2-story building established in 1956. The Dorm 2 (C1908) is an 11,708 square foot, 1-story building established in 1958.The Dorm 3 (C1913) is a 13,196 square foot, 2-story building established in 1958. The Dorm 4 (C1910) is an 11,708 square foot, 1- story building established in 1958. The Dorm 5 (C1916) is a 9,040 square foot, 1-story building established in 1965. The Dorm 6 (C1917) is a 28,600 square foot, 2- story building established in 1969.
The scope of work provides for providing new fire sprinkler systems in Dorms 1-6 at the Joliet Treatment Center. The work shall include the removal and replacement of ceilings, along with any electrical modifications necessary to accommodate the sprinkler work. A code analysis will be required for each building. The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is required to coordinate all telecommunications and networking requirements with the Department of Innovation & Technology (DoIT) during design and construction.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:

More opportunities from Illinois → Department of Corrections

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS