Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2

Closed
IFB192135State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335311
New
DIBBS
CABLE ASSEMBLY-SWITCH,
Solicitation # SPE4A6-27-T-5391
Solicitation SPE4A6-27-T-5391 is a request for quotations from the DLA Weapons Support ASC Commodities Division for the procurement of four electrical switch cable assemblies, identified by NSN 6150-01-733-1778. The items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with a required delivery date of August 18, 2027, and a need ship date of March 21, 2027. The contract specifies a delivery period of 144 days and requires FOB Origin terms. Compliance requirements are stringent, including mandatory adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, with a specific requirement for a cap or plug on one end of the assembly. Quality assurance must meet ISO 9001:2015 standards, and origin inspection is required. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access export-controlled data subject to ITAR or EAR regulations. The procurement incorporates various FAR and DFARS clauses, including those regarding the Buy American Act and the Berry Amendment. A price evaluation preference is available for certified HUBZone small businesses. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Quotations are due by October 27, 2026, and should be submitted via the DLA-BSM Internet Bid Board System.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 17 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The project involves a comprehensive rehabilitation of the 12kV electrical power distribution loop at the Palo Alto Regional Water Quality Control Plant, planned over six phases to align with other capital improvements. Key activities include installing a canopy structure over new load centers, replacing medium voltage switches, updating the secondary service entrance cabinet and associated switchgear, and installing temporary conductors and conduits during shutdowns. The work also encompasses demolition of existing equipment, site preparation such as vegetation and pavement removal, and various civil and structural tasks as detailed in the project plans and specifications. The contract aims to enhance the reliability and safety of the plant’s electrical distribution system through these upgrades. The solicitation, titled "12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2," was posted on July 16, 2024, with a response deadline of August 9, 2024. It is managed by the California Public Works-Engineering Division, with a contract value estimated between 5 million and 10 million dollars. The project is designated under NAICS code 335311 and is open to qualified bidders. The primary point of contact for inquiries is Nanette Obrien, reachable via email at [email hidden] or by phone at [phone hidden]. More information about the project can be accessed through the provided procurement portal link.

Documents

8

Construction Contract for City of Palo Alto Project

PDF, High priority: read this firstcontract-document
High

IFB 192135 - 12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2

PDF, High priority: read this firstspecifications
High

IFB 192135 - 12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2

PDF, High priority: read this firstspecifications
High

IFB 192135: 12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2

PDF, High priority: read this firstifb
High

IFB192135 - 12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2

PDF, High priority: read this firstifb
High

IFB 192135 - 12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2 - Special Provisions

PDF, High priority: read this firstspecifications
High

IFB 192135 - 12kV Electrical Power Distribution Rehabilitation Bid Package 2 Bid Form

PDF, High priority: read this firstifb
High

IFB 192135 - Part 9 Appendices

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works-Engineering Division
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Description of Project: The 12kV Electrical Power Distribution Loop Rehabilitation Project includes six phases of work that are being planned and sequenced in the upcoming years to coordinate with other ongoing capital improvement projects at the Palo Alto Regional Water Quality Control Plant. This Bid Package 2 (IFB 192135) includes installation of a canopy structure over new Load Centers (LC-3 & -4), replacement of several medium voltage switches, Secondary Service Entrance Cabinet and associated switch, and their associated conductors; installation of temporary conductors and conduits during shutdowns and switchovers; demolition of exisiting equipment (cabinets, switchgear,  transformer, etc.); site preparation work such as vegetation, pavement and curb removal; site civil, structural and other miscellaneous work as specified in the project plans and specifications.  

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS