1404 Royal Oaks Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The 1404 Royal Oaks Project in Duarte, California, entails the demolition of existing structures on a 0.84-acre site, with the exception of two mature Coast Live Oak trees retained in place, and the construction of 11 two-story attached townhomes across five buildings. Each townhome features three bedrooms, ranges from 1,341 to 1,594 square feet, includes an attached two-car garage, and a private outdoor patio yard, with all buildings limited to a maximum height of 31 feet, seven inches. Vehicular access is provided via a reconstructed northeastern driveway and a new interior system of 24- to 26-foot-wide roads connecting the units, while pedestrian access remains from Royal Oaks Drive. The project includes 22 enclosed garage spaces and an additional six surface parking spaces, one of which is accessible. The development requires a General Plan Amendment to Medium Density Residential, a zoning change to R-3 Multiple Family Residential Medium Density, a Tentative Tract Map for condominium subdivision, and approval through Site Plan and Design Review. Environmental compliance is driven by a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program, with key assessments including arborist, geotechnical, cultural resource, hydrology, noise, and tribal consultation reports. Construction is scheduled from March 1, 2025, to March 1, 2027, with demolition occurring in early March 2025. Geotechnical and environmental standards govern construction practices, including compliance with the 2022 California Building Code and ACI 318-19 for concrete, ASTM D1557-12 for 90% backfill compaction, and ASTM D2435 and D3080 for soil testing. Stormwater management follows Low Impact Development Best Management Practices, requiring percolation rates of 1.52 in/hr and treatment for the 85th percentile rainfall event as per Regional Water Quality Control Board standards. Buried steel utilities must be coated based on soil resistivity testing, and a Native American Monitor, approved by the Gabrieleño Band of Mission Indians – Kizh Nation, will be present during construction. Inspection and acceptance occur on-site and are overseen by the City of Duarte’s Community Development Director, with documentation filed at City Hall. Although no formal contract value, pricing structure, or federal acquisition regulation clauses are detailed, the project is
General Info
Agency
NAICS
Place of Performance
Royal Oaks Drive/Junipero Drive, Duarte, CA, 91010Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
