Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Navy was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ACTUATOR,ELECTROMEC — 1680016108890 — N0038326QSB68

Closed
Federal
Submission Closed
Solicitation #
N0038326QSB68

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Federal
Fire Extinguisher Replacement & Exchange Services
Solicitation # fire-extinguisher-replacement-exchange-services
The Earle C. Clements Job Corps Center is soliciting bids for fire extinguisher replacement and exchange services in Morganfield, Kentucky. The scope of work involves the exchange of approximately 260 existing units, including 231 10 lb. ABC, 8 K-Class, 12 5 lb. ABC, 4 5 lb. CO2, 1 5 lb. Halotron, and 4 20 lb. ABC extinguishers. Additionally, the contractor must supply one new 6-liter Wet K-Class and one new 20 lb. ABC extinguisher. Per Addendum #1, the requirement for forty-seven 2.5 lb. 5BC DOT-compliant extinguishers has been removed from the procurement. All work must be performed Monday through Friday, 8 AM to 5 PM CST, in compliance with NFPA 10 and DOT standards, and must include a complete inventory list, tagging for each unit, and a written summary report. This is a fixed-price solicitation set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bids and required documentation, including a bid sheet, supplier packet, and proof of worker's compensation insurance, are due by December 4, 2026. The contract is subject to Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31. Management & Training Corporation (MTC) will serve as the sole judge to determine the best value for the award.
Earle C. Clements Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 811310
New
International
Lift Servicing and Maintenance Services (North)
Solicitation # ocds-h6vhtk-07c418
Southern Housing is procuring a single contractor to provide comprehensive lift servicing and maintenance for its housing stock in the North region, covering London, Berkshire, Buckinghamshire, and Oxfordshire. The scope includes planned and preventative maintenance, responsive call-outs, emergency repairs, and defect correction for all communal and domestic lifts, as well as associated electrical and builder works. The contractor will also be responsible for discharging Principal Contractor duties under CDM and Building Safety Regulations when applicable, though lift modernization and replacement are excluded from the scope. The contract utilizes the JCT MTC 2024 Form of Contract with Amendments and is estimated to be valued at 11,660,000 GBP excluding VAT. The agreement is set for an initial three-year term starting March 15, 2027, with options to extend for up to seven additional years, allowing for a maximum term of ten years. Award decisions will be based on an open procedure using a weighted scoring system, with 40% allocated to price and 60% to quality factors such as resourcing, performance, and health and safety. Key objectives include improving resident satisfaction through technology, ensuring robust subcontractor management, and delivering social value outcomes. There is no specific set-aside status for this contract.
Southern Housing

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation N0038326QSB68, issued by Navsup Weapon Systems Support, is a request for quotations for the teardown, evaluation, repair, overhaul, and modification of Electromechanical Actuators, part number 7RH 1680 016108890 P8. The objective is to return these units to a Ready for Issue condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids such as fixtures or jigs. All work must be performed in accordance with Mag Aerospace Industries Inc drawing 29780 (870713-403) and comply with quality standards including ISO 9001 or SAE AS9100, and calibration standards such as ANSI/NCSL Z540.3 or ISO-10012-1. The contract includes strict guidelines for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Any over and above repair efforts must also be approved by the Procuring Contracting Officer. Deliveries are required within 90 days on an FOB Destination basis, with an induction period of one year from the date of the order. Packaging and marking must adhere to MIL-STD-2073 and MIL-STD-129, with unique identification per MIL-STD-130. The government intends to make a single award based on the most advantageous offer, with past performance weighted as more important than price. Quotations are due by November 9, 2026.

General Info

Repair and overhaul of Electromechanical Actuators for Navsup Weapon Systems Support by November 2026.

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

PHILADELPHIA, PA, 19111-5098, USA

Set-Aside

other than small

Documents

1
PDF, High priority: read this first52 pages · rfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

38 mandatory

44 requirements in 10 areas

  • Technical15 · 15 must
    010

    Repair Turnaround Time

  • Reporting7 · 7 must
    038

    Asset Visibility Reporting

  • Submission4 · 4 must
    001

    Quotation Submission Deadline

  • 41 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 44 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fire Extinguisher Replacement & Exchange ServicesOpen now, due in 6 days
  • Pump Maintenance and ServiceOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navsup Weapon Systems Support
ContactsNo contacts available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
ContactsNo contact information available

Full Description

Show more
TECHNICAL DATA PACKAGE
Description
TDP VERSION NUMBER 001 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;MAG AEROSPACE INDUSTRIES INC; drawing number ( ;29780; ) ;870713-403; , Revision ;LATEST; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: ACTUATOR,ELECTROMEC ;870713-403; P/N, ;7RH 1680 016108890 P8; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. ACTUATOR,ELECTROMEC ;MAG AEROSPACE INDUSTRIES INC; Company Name , ;1500 GLENN CURTISS STREET, CARSON CA 90746-4102; Address , ;29780; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of The Navy → Navsup Weapon Systems Support

Same awarding agency

NAICS: 336413
New
DIBBS
PUMP,AIRCRAFT,MATER — 1650015238307 — N0038327QHA24
Solicitation # N0038327QHA24
This fixed-price solicitation, issued by the Navsup Weapon Systems Support for the Department of the Navy, seeks a contractor to perform the teardown, evaluation, repair, and overhaul of an aircraft pump (NSN 1650-01-523-8307). The contractor is responsible for providing all necessary labor, materials, and tooling to return the unit to a Ready for Issue (RFI) condition, with a delivery period of 90 days and FOB Destination terms. The scope specifically prohibits the use of MIL-W-81381 wire, requiring SAE-AS22759 series wire instead, and mandates compliance with IPC/EIAJ-STD-001C for soldering and assembly. The contractor must maintain a quality management system conforming to ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key contractual provisions include strict guidelines for Beyond Economical Repair (BER) determinations, Missing on Induction (MOI) reporting, and Over and Above Repair (OAR) efforts, all of which require written concurrence from DCMA. Award will be based on a single award to the most advantageous offeror, with past performance weighted as the primary evaluation factor and price as the secondary factor. Packaging must adhere to MIL-STD-2073, and all electronic invoicing must be processed through the Wide Area WorkFlow (WAWF) system.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

5 days ago

DEADLINE

in 29 days
View Details
NAICS: 332312
New
DIBBS
SUPPORT,STRUCTURAL — 1560015302403 — N0038327QHA25
Solicitation # N0038327QHA25
This solicitation, issued by NAVSUP Weapon Systems Support, seeks a contractor to perform the teardown, evaluation, repair, and inspection of structural support units (NSN 1560-01-530-2403, Part Number 74T030303-1005). The primary objective is to return these units to a Ready for Issue (RFI) condition through component repair, replacement, and testing in accordance with the latest technical publications. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as government-furnished property is not provided. Key technical requirements include the maintenance of process control documentation and a quality management system compliant with ISO 9001 or SAE AS9100. The contract establishes specific protocols for Beyond Economical Repair (BER) determinations, which occur if repair costs exceed 75% of the replacement price, and for Missing on Induction (MOI) components. All BER and MOI determinations require written concurrence from the DCMA. The award will be made to a single, responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Deliverables must be preserved and marked according to MIL-STD-2073-1 and MIL-STD-129, with a warranty period of 365 days following delivery. There is no specified set-aside status for this procurement.
Fabricated Structural Metal Manufacturing

POSTED

5 days ago

DEADLINE

in 29 days
View Details
NAICS: 811210
New
DIBBS
MEMORY UNIT,VIDEO — 5836016800777 — N0038327QPA46
Solicitation # N0038327QPA46
Navsup Weapon Systems Support has issued a fixed-price solicitation for the teardown, evaluation, repair, and modification of 18 Video Memory Units (P/N 51571001-545, NSN 5836 016800777). The objective is to return these units to a Ready For Issue (RFI) condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, with a specific prohibition on the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. All materials used must be new per FAR 52.211-5, and any cannibalization or use of non-new materials requires written approval from the Procuring Contracting Officer. The contract mandates strict quality and technical standards, requiring compliance with ISO 9001/SAE AS9100 and calibration systems meeting ANSI/NCSL Z540.3 or ISO-10012-1. Repairs must follow OEM technical drawings and approved manuals, with a required repair turnaround time of 60 days and a general delivery period of 90 days. Evaluation for award will prioritize past performance over price. The contractor must manage specific conditions such as Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) through formal coordination with DCMA and the PCO. Packaging must adhere to MIL-STD-2073-1 for stock shipments and MIL-STD-129 for marking.
Electronic and Precision Equipment Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS