Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on June 1, 2002. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

17 -- Pantograph, Aircraft fuel Dispensing

Closed
F38604-02-RM009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

N/A

NAICS

N/A

Place of Performance

Orgin

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
ECONS/CC V CommanderContracting Officer

Full Description

Show more
For this solicitation please contact MSgt Andrew Carrington, 321 ELS/LGC, Unit 73005, APO AE 09345-3005 Phone: 011-968-923-9633, fax: 011-968-611-295, or email andrew.carrington@miab.aorcentaf.af.mil. Please contact the above before contacting the primary or secondary points of contacts as elsewhere listed. Design The pantograph shall be used for direct fuselage refueling of Wide Body Aircraft (C-5, C-17, L1011, 747) and other aircraft with dual single point receptacles such as the C-141. It can be moved via use of a tow vehicle and the design meets NATO/USAFE Specification STS-M 145. The system must be completely compatible with the existing CLA-VAL underground-pressurized hydrant system. Application Operating pressure : 125 psi Ambient Temperature : -60 to +180 Fahrenheit Flow rate : min 600 USGPM Requirements - Each section has 4-inch diameter stainless steel piping and non-lubricated stainless steel swivels. - The system shall have a section that allows for horizontal coupling to an aircraft for levels ranging between 2.0 feet (0.60 m) and 6.5 feet (2,00 m) above level of apron. - The dispensing section piping reduces to 3-inch stainless steel piping and swivel joints. - The dual dispensing end shall have a 2.5-inch single point. - It shall not be permitted to use hoses as connections between the hydrant pit and aircraft and/or the pantograph and aircraft. - The pantograph shall be equipped with an automatic thermal relief system to compensate for ambient temperature changes and pressure fluctuations. - The thermal relief reservoir shall be sized to accommodate a 176?F (80?C)-temperature increase. - The pantograph has spring-loaded casters to support the entire assembly and to allow towing. - A tow bar shall be mounted onto the front support of the pantograph to enable pulling the pantograph at a maximum speed of 5 miles/hour. - For towing, the pantograph shall be equipped with two locking devices. - The pantograph is equipped with two grounding cable reels. The cable shall be at least 50 feet (15.2 m) long. Each cable reel, the grounding cable, and the connection clamp must be in accordance with US-Military Specifications MIL-R-83232 B (2) and MIL-R-83325 A(1). - The pantograph shall be equipped to accommodate sampling, connecting pressure gauges, draining, and venting. Design diameter Nominal diameters at pantograph shall be as follows: Pipe sections : 4-inch, 150 pound class with 3-inch dispensing piping CLA-VAL Hydrant Coupler, or equal : 4-inch, API 1584 Filter Monitor : 4-inch, ANSI 150 Venturi system : 4-inch, ANSI 150, compatible to CLA-VAL Control Valve CLA-VAL Control Valve or Equal : 4-inch, ANSI 150 Wide mesh strainer : 4-inch, ANSI 150 Turbine flow meter : 4-inch, ANSI 150 Swivel joints : 4-inch and 3-inch, 125 psi Pressure Fueling Nozzle : 2 ? -inch, 125 psi And Dry Break Quick-disconnect Equipment Swivel Joints: - At least a three-year warranty shall be provided for the swivel joints. - Approved swivel joints are: 1 ea. Heavy duty, 4" size, both sides flanged 10 ea. 4" size, both sides flanged 2 ea. 3" size, both sides flanged 4 ea., 3" size, one side flanged, one side welded - A 60-mesh 4-inch strainer shall be installed prior to the turbine meter. Filter Monitor is required Venturi System: - To control the refueling process, a venturi shall be installed into one section of the pantograph downstream of the flow meter. . Drain Unit: - This unit shall consist of a stainless steel ?? shut-off valve, a ?? dry break coupling and a 3 feet long fuel resistant hose. Pressure Gauge Unit: - This unit must consist of: - ?? pressure gauge stop cock - 4? pressure gauge, liquid damped, with an indicating range of 0 to 150-psi. Fuel Sample Connection: - The unit shall consist of a ?-inch stop cock and dry break. Material: Stainless steel Extended Length: - When fully extended the pantograph is at a minimum 50 feet in total length

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS