Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on December 4, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

18--SPACE LAUNCH SYSTEM RS-25 CORE STAGE ENGINE

Awarded
NNM06AB13CFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336415
New
DIBBS
TUMBLER ASSEMBLY
Solicitation # SPE4A6-27-T-7441
Solicitation SPE4A6-27-T-7441 is a federal procurement issued by the Defense Logistics Agency (DLA) Weapons Support ASC Commodities Division for the supply of 75 Tumbler Assemblies (NSN 1440-01-725-5238). The items must be manufactured in accordance with Reference Drawings 98747 201717861 and 98747 201824601, both Revision A. The contract specifies a delivery timeline of 369 days after order, with FOB and inspection/acceptance points set at the origin. A critical requirement includes the delivery of one unit for First Article Testing (FAT) within 90 calendar days of the contract date to Hill AFB, Utah. The government will add a testing cost of 1,774.00 dollars to the offered price during the evaluation process. The procurement is designated as a Total Small Business Set-Aside under NAICS code 336415. Quality standards require the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001 tailored to SAE AS9003, with sampling conducted per MIL-STD-1916 or ASQ H1331. Due to the nature of the technical data, the contract is subject to strict export controls under ITAR and EAR, requiring contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contract mandates compliance with CMMC Level 2 cybersecurity standards and DFARS 252.204-7012 for safeguarding covered defense information. Packaging must adhere to MIL-STD-129 and DLA Master List requirements, with specific standards for hazardous materials under TQ requirement IP025.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 7 days

AI Contract Overview

Show more

NASA Marshall Space Flight Center is seeking to acquire six additional RS-25 Core Stage Engines to support the Space Launch System flight manifest through its first five missions. This procurement leverages modified Space Shuttle Main Engine hardware and Ares I components to meet human and cargo launch capabilities for low-Earth orbit and beyond. The acquisition is intended to be negotiated solely with Aerojet Rocketdyne, as they are identified as the only responsible source capable of providing the necessary hardware without causing substantial budgetary impacts or schedule delays. The decision to bypass full competition is based on the unique technical interfaces and performance characteristics of the RS-25 engine, which are deeply integrated into the SLS vehicle architecture. Introducing a different engine system would require extensive redesign and recertification of the stage and vehicle, introducing unacceptable technical risks and safety concerns. By utilizing the matured RS-25 design, NASA benefits from decades of flight experience and production data, ensuring the program avoids the unrecoverable costs and risks associated with developing a new engine system.

General Info

Agency

N/A

Contract Value

$3,384,867,722.36

NAICS

336415 - Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
NASA/MSFC has a requirement for Core Stage Engines for the Space Launch System (SLS). The NASA Authorization Act of 2010 directed the Agency to develop, as rapidly as possible, replacement vehicles capable of providing both human and cargo launch capability to low-Earth orbit and to destinations beyond low-Earth orbit. In developing the SLS, the Act directed the Administrator to utilize, to the extent practicable, existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle Program (SSP), Orion, and Ares I projects. This includes SSP-derived components and Ares I components that draw extensively on SSP heritage propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motors. To achieve this mandate, NASA initiated the development of the SLS with SSP and Ares I derived assets. Specific to the Core Stage Engine, the system will utilize modified RS-25 Space Shuttle Main Engine (SSME) hardware and Ares I components to provide the required lift capabilities. This procurement action is to acquire six additional RS-25 Core Stage Engines. These six flight engines in combination with the available RS-25 residual inventory will support the SLS flight manifest through the first five flights. NASA/MSFC intends to negotiate with Aerojet Rocketdyne (AR) only for the six additional SLS RS-25 Core Stage Engines. This decision is made pursuant to FAR 6.302-1 (a) (2) (ii & iii), only one responsible source and no other supplies or services will satisfy agency requirements, which implements the authority for 10 U.S.C. 2304(c) (1). Competition is impractical for the following reasons: Every liquid propellant rocket engine design has unique interfaces, interface conditions, physical features, and performance characteristics. These factors drive the design of the stage main propulsion system, the sizing of the propellant tanks, the constituents and capabilities of the ancillary systems used to support engine operation such as pneumatic and hydraulic fluid supply, communications, electrical power, and thrust vector control. They also can influence ground systems including handling and test equipment and even engine test stand. The engine performance also drives mission design at the vehicle level in terms of payload manifests, trajectory design, and abort scenario development. Once an engine system is chosen for a launch vehicle architecture and that vehicle is certified for flight, changing to another engine system with substantive differences in form, fit, function, or performance would necessitate significant stage and vehicle redesign and recertification. The SLS Program is utilizing residual RS-25 assets from the Space Shuttle Program for the first four launches. Redesign efforts applied to the SLS vehicle to accommodate a change to a different Core Stage Engine would represent a substantial and unacceptable schedule delay for the fifth flight and a substantial and unacceptable budgetary impact to the program. The RS-25 engine system design carries with it four decades of development and production activity and three decades of flight experience. The RS-25 engine design is the most advanced and complex engine ever built and flown in the United States. The development of a new engine design with the same form, fit, function, and performance of the RS-25 would involve significant and inherent technical risks and safety concerns. The RS-25 is fully matured from a technical perspective. With over one million seconds of accumulated hot-fire test time and the equivalent of over four hundred human spaceflights, the RS-25 design, production processes, and operational procedures have incorporated within them thousands of lessons learned. A new engine would not necessarily derive the same benefit from these lessons learned, the value of which is incalculable, thereby generating many programmatic and technical risks which are not present with RS-25. Given the unique experience, perspective, and capabilities specifically pertaining to the RS-25 engine system that is possessed by Aerojet Rocketdyne; there is only one source for the six additional RS-25 Core Stage Engines that does not entail the substantial and unrecoverable duplication of cost, the creation of unacceptable schedule delays, and substantially increase the SLS Program technical risk. The Government does not intend to acquire a commercial item using FAR Part 12. Interested organizations may submit their capabilities and qualifications to perform the effort in writing to the identified point of contact not later than 4:30 p.m. local time on October 9, 2014. Such capabilities/qualifications will be evaluated solely for the purpose of determining whether or not to conduct this procurement on a competitive basis. A determination not to compete this proposed effort on a full and open competition basis, based upon responses to this notice, is solely within the discretion of the Government. Oral communications are not acceptable in response to this notice. All responsible sources may submit a response, which will be considered by the agency. NASA Clause 1852.215-84, Ombudsman, is applicable. The installation Ombudsman is L. Dale Thomas, DE01, George C. Marshall Space Flight Center, MSFC, AL 35812, telephone +1 (555) 000-0000, email: contact@example.gov .

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS