Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

18500 and 18520 Marshall Lane Townhome Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 18500 and 18520 Marshall Lane Townhome Project in Saratoga, California, involves the construction of 132 attached three-story townhomes across 22 buildings on a 9.84-acre site. The residential units range from 1,275 to 2,268 square feet, with 10 units designated as extremely low-income housing. The project includes a total building area of approximately 357,710 square feet and comprehensive infrastructure development, including internal private streets, driveways, pedestrian walkways, landscaping, and utility improvements. Parking provisions consist of 298 vehicle spaces, including 264 in-unit garages and 24 long-term bicycle spaces. Off-site improvements include the installation of curbs, gutters, sidewalks, and essential water, sewer, and storm drain mains. The project is currently undergoing a rigorous environmental review process in compliance with the California Environmental Quality Act, including the preparation of a Draft Environmental Impact Report. Technical assessments have been conducted covering transportation, air quality, greenhouse gas emissions, noise, and biological resources. Key environmental considerations include the removal of up to 71 trees with 202 replacements, the protection of tribal cultural resources, and the mitigation of impacts on agricultural land. The development must adhere to the 2022 California Fire and Building Codes and meet specific stormwater requirements, such as a 60 percent minimum permeable surface and on-site retention of 100-year storms. Infrastructure upgrades are to be secured via performance bonds provided by the applicant.

General Info

Construction of 132 townhomes in Saratoga, California, including infrastructure and environmental compliance.

Agency

California → City of Saratoga

Place of Performance

Marshall Lane, Quito Road, Saratoga, CA, 95070

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Saratoga
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Saratoga
Office AddressN/A
Contacts
Yael MarcusSenior Project Manager
Kavitha KumarContract Planner

Interested Companies (1)

FirstCarbon SolutionsIrvine, California

Full Description

Show more
The project applicant, Marshall Lane Owner, LLC, proposes to develop 132 three-story attached townhomes and related infrastructure, including new internal streets and driveways, parking, landscaping, bioretention and drainage features, and utility improvements on an approximately 9.84 gross-acre project site. The color palette of the homes would include earth tones, such as shades of brown, tan, navy, and green, along with shades of white and gray.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
ENVIRONMENTAL TRUST Comprehensive E mergency Management Plan Update & Environmental Engineering and Consulting Services
Solicitation # Environmental-Trust_RFP_FY-2027_Emergency-Plan-Update-Environmental-Services_10202026.pdf
The Confederated Tribes of the Colville Reservation is seeking professional services for a combined maximum budget of $289,497, divided into two primary functional areas. The first area, Emergency Management Planning, is capped at $150,000 and involves updating the 2014 Comprehensive Emergency Management Plan, developing Emergency Support Functions, creating hazard-specific annexes, and establishing the Tribes' first Continuity of Operations Plan and Tribal Threat and Hazard Identification and Risk Assessment. This scope also includes the development of an all-hazards tabletop exercise package and the facilitation of coordination workshops to integrate these planning components. The second area, Environmental Engineering and Consulting Services, is capped at $139,497 and focuses on technical field operations in Nespelem, Washington. Key tasks include biannual groundwater monitoring and testing at the Nespelem Post and Pole site, as well as the characterization, removal, and lawful disposal of hazardous materials at the Nespelem Recycle Center. The contractor must adhere to strict quality standards, including the use of approved Quality Assurance Project Plans and Health and Safety Plans, and provide detailed verification reports. Mandatory monthly progress reports are required for all activities, and all project communication costs must be integrated into the respective task budgets. TERO fees are handled separately by the Tribal Employment Rights Office and are not included in the scope of work budget.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541620
New
SLED
Consulting Services for the Development and Implementation of a Dry Weather Screening Program
Solicitation # 3062
York County, South Carolina, is soliciting proposals for consulting services to develop and implement a Dry Weather Screening Program. This initiative is required to fulfill the South Carolina Department of Environmental Services NPDES General Permit for regulated small Municipal Separate Storm Sewer Systems (SMS4). The selected consultant will be responsible for creating a technical guidance manual, verifying and updating the storm sewer system outfall map and GIS data, conducting field screening and analytical monitoring to detect illicit discharges, and providing an assessment report and staff training. All field screening must be performed after at least 72 hours of dry conditions following a rainfall of 0.10 inches or more, and the final program must be integrated into the County's Illicit Discharge Detection and Elimination Program and Stormwater Management Plan. The procurement process involves a selection committee that evaluates proposals based on past performance, personnel experience, project approach, and costs. Technical proposals are scored first, followed by the opening and integration of the cost proposal. Short-listed firms may be required to provide oral and visual presentations. The contract includes a non-appropriation clause, requires compliance with Title VI of the Civil Rights Act of 1964 and Section 504 disability accommodations, and mandates that all materials produced belong exclusively to York County. Proposals must be submitted via the OpenGov portal or delivered to the York County Procurement Department by the specified deadline, with quoted prices remaining valid for 90 days.
Procurement

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS